Loading...
HomeMy WebLinkAboutTPM22-0002 Agenda Report  Butte County Department of Development Services   April 6, 2022  Agenda Report – Robert R. and Monica R. Seaman TPM22-0002  Page 1 of 20  BUTTE COUNTY ZONING ADMINISTRATOR AGENDA REPORT – April 6, 2022 Applicant: Robert R. and Monica R. Seaman Location: The project site has the situs address of 4109 Rio Bravo Drive, Chico and is located, approximately 1.75 miles north of the Chico city limits via Garner Lane. Owners: Robert R. and Monica R. Seaman, Trustees of the Robert R. Seaman and Monica R. Seaman Revocable Trust File #: TPM22-0002 Request: Tentative Parcel Map to divide a 2.32-acre property into two parcels (1.10 and 1.22 acres each). Supervisor District: 2 Parcel Size: 2.32 acres Planner: Tristan Weems, AICP Associate Planner G.P.: VLDR (Very Low Density Residential) Attachments APN: 047-780-029 A: B: C: D: E: Draft Zoning Administrator Decision with attached Conditions of Approval Zoning Map Tentative Parcel Map ALUC Consistency Findings Environmental Health PREAP21-0053 EXECUTIVE SUMMARY The applicant proposes a Tentative Parcel Map to split a 2.32 acre parcel into two parcels: 1.22 and 1.10 acres. The parcels are zoned VLDR / SR-1 / NCSP / B2 (Very Low Density Residential / Suburban Residential / North Chico Specific Plan / Chico Airport Compatibility Zone) with one acre parcel minimums. The parcels will be served by septic and well. Proposed Parcel 1 will contain a residence (4,037 square feet) currently under construction (building permit B21-2477), barn (1,240 square feet) and on-site septic system / well. Parcel 2 will contain a shop (2,455 square feet), a residence (2,860 square feet) and on-site septic system / well. The parcels are accessed by Rio Bravo Drive. The property is largely within the B2 Chico Airport Compatibility zone and has been approved under an Airport Land Use Commission (ALUC) consistency review, with findings and conditions. (ALUC File #A21-0002). The property is located in flood zone X (unshaded – not defined).  Butte County Department of Development Services   April 6, 2022  Agenda Report – Robert R. and Monica R. Seaman TPM22-0002  Page 2 of 20  Staff recommends the Zoning Administrator adopt an Exemption under section 15061 (b) (3) Common Sense exemption pursuant to the California Environmental Quality Act (CEQA) and approve the Tentative Parcel Map, subject to findings and conditions in Exhibit A of this report. PROJECT DESCRIPTION: Direction General Plan Designation Zoning Existing Land Use(s) North Very Low Density Residential VLDR Residential South Very Low Density Residential VLDR Residential East Very Low Density Residential VLDR Residential West Very Low Density Residential VLDR Residential • The project proposes to divide a 2.32-acre parcel, in the VLDR (Very Low Density Residential – 1.0 acre minimum) zone and VLDR (Very Low Density Residential) General Plan designation, into two lots (1.10 and 1.22 acres). • The project parcel fronts on Rio Bravo Drive, a publicly maintained paved road. The parcel frontage is unimproved without curb, gutter, or sidewalk. • Future residences will be served by onsite well and septic systems. SITE CHARACTERISTICS: • The project parcel is developed and contains two residences a shop and barn totaling approximately 10,600 square feet. • The topography of the project area is flat, at an elevation 200 feet above sea level. • The surrounding neighborhood consists of approximately ½ - 1 acre developed parcels zoned VLDR. • There are no waterways on or adjacent to the project site. • According to Federal Emergency Management Agency (FEMA) floodplain mapping of the project area, the parcel is located within the X (unshaded) Flood Zone. The areas of minimal flood hazard, which are the areas outside the Special Flood Hazard Area (SFHA) and higher than the elevation of the 0.2-percent-annual-chance flood, are labeled Zone C or Zone X (unshaded). (https://www.fema.gov/flood-zones) • The site is located in the “B2” Chico Municipal Airport Compatibility Zone. ANALYSIS: • On April 21, 2021 the Butte County Airport Land Use Commission found that the project was compatible with the “B2” Chico Airport Compatibility Zone per Section 3.8 Exceptions to Land Use Criteria, 3.8.2 Site-Specific Special Conditions, with the required findings and conditions (included in Attachment D). • The sizes of the proposed parcels are consistent with the VLDR (Very Low Density Residential, 1.0 acre minimum) zone.  Butte County Department of Development Services   April 6, 2022  Agenda Report – Robert R. and Monica R. Seaman TPM22-0002  Page 3 of 20  • The project’s environmental impact has been analyzed and determined to be less than significant, with a recommendation for a CEQA Exemption (common sense). • The site visit conducted on February 16, 2022 revealed lack of street improvements along Rio Bravo, the boarding of a horse (associated with the barn), and a nearly complete Accessory Dwelling. • Consistency findings have been made for this project by the Airport Land Use Commission (ALUC). In finding the project consistent with the Airport Land Use Compatibility Plan, ALUC included conditions of approval, which are included in Exhibit A. Consistency of Project with General Plan Goals and Policy: General Plan goals and policies were evaluated in the context of the proposed project. Fourteen goals and 25 policies were identified as being applicable to the project. The following table identifies each applicable goal and policy, and a review of the project’s consistency with each policy. General Plan 2030 Goals and Policies Consistency Review AGRICULTURE ELEMENT GOAL AG-5. Reduce conflicts between urban and agricultural uses and between habitat mitigation banking and agricultural uses. Consistent. This goal is more specifically reviewed in the discussion of the policies below. AG-P5.3. The Zoning Ordinance shall require that a buffer be established on property proposed for residential development in order to protect lands designated Agriculture by the General Plan and zoned Agriculture under the Zoning Ordinance from incompatible use conflicts. The desired standard shall be 300 feet, but may be adjusted to address unusual circumstances.* Consistent. No agricultural-zoned property is located adjacent to the project site. WATER RESOURCE ELEMENT GOAL W-2. Ensure an abundant and sustainable water supply to support all uses in Butte County. Consistent. This goal is more specifically reviewed in the discussion of the policies below. W-P2.8. The County supports Area of Origin water rights, the existing water right priority system and the authority to make water management decisions locally to meet the county's current and future needs, thereby protecting Butte County's communities, economy and environment. Consistent. Future land uses will utilize established vested rights to underlying groundwater resources to meet water needs.  Butte County Department of Development Services   April 6, 2022  Agenda Report – Robert R. and Monica R. Seaman TPM22-0002  Page 4 of 20  General Plan 2030 Goals and Policies Consistency Review W-P2.9. Applicants for new major development projects, as determined by the Department of Development Services, shall demonstrate adequate water supply to meet the needs of the project, including an evaluation of potential cumulative impacts to surrounding groundwater users and the environment.* Consistent. The availability of water resources to serve future development on the project site would be evaluated by Butte County Environmental Health upon application for a development permit. GOAL W-3. Effectively manage groundwater resources to ensure a long- term water supply for Butte County. Consistent. This goal is more specifically reviewed in the discussion of the policies below. W-P3.3. The County shall protect groundwater recharge and groundwater quality when considering new development projects.* Consistent. Future development would result in only a minor increase in impervious surfaces from the construction of concrete foundations and driveways. Thus, the proposed project would not cause a measureable reduction in surface infiltration or a decrease in deep percolation to the underlying aquifers. At the time of development, proposed improvements will be evaluated by the Butte County Public Works Department to ensure that stormwater runoff is appropriately retained on-site to allow for groundwater recharge and improved water quality. GOAL W-4. Promote water conservation as an important part of a long-term and sustainable water supply. Consistent. This goal is more specifically reviewed in the discussion of the policies below. W-P4.6. New development projects shall adopt best management practices for water use efficiency and demonstrate specific water conservation measures.* Consistent. Future development would be subject to California Green Building Standards Code and other California regulations, which contains specific measures for water conservation of residential and non-residential buildings. GOAL W-5. Protect water quality through effective stormwater management. Consistent. This goal is more specifically reviewed in the discussion of the policies below. W-P5.2. New development projects shall identify and adequately mitigate their water quality impacts from stormwater runoff.* Consistent. At the time of development, proposed improvements will be evaluated by the Butte County Public Works Department to ensure that stormwater runoff is appropriately retained on-site to allow for groundwater recharge and improved water quality. CONSERVATION AND OPEN SPACE ELEMENT GOAL COS-2. Promote green building, planning and business. Consistent. This goal is more specifically reviewed in the discussion of the policies below.  Butte County Department of Development Services   April 6, 2022  Agenda Report – Robert R. and Monica R. Seaman TPM22-0002  Page 5 of 20  General Plan 2030 Goals and Policies Consistency Review COS-P2.2. New development shall comply with Green Building Standards adopted by the California Building Standards Commission at the time of building permit application, including requirements about low- or no- toxicity building materials. Consistent. Cal Green development measures will be applied in the design of future development, at the time of the building permit application. GOAL COS-7. Conserve and enhance habitat for protected species and sensitive biological communities. Consistent. This goal is more specifically reviewed in the discussion of the policies below. COS-P7.3. Creeks shall be maintained in their natural state whenever possible, and creeks and floodways shall be allowed to function as natural flood protection features during storms.* Consistent. The project site does not contain any creek or floodways. COS-P7.4. New development projects shall mitigate their impacts in habitat areas for protected species through on- or off-site habitat restoration, clustering of development, and/or project design and through the provisions of the Butte Regional Habitat Conservation Plan (HCP) and Natural Community Conservation Plan (NCCP) within the HCP/NCCP Planning Area, upon the future adoption of the HCP/NCCP.* Consistent. No native habitat was identified on the project site or surrounding area. The property had been extensively disturbed by previous grading. COS-P7.5. No new development projects shall occur in wetlands or within significant riparian habitats, except within the Butte Regional Habitat Conservation Plan (HCP) and Natural Community Conservation Plan (NCCP) Planning Area where such development is consistent with the conditions of the HCP/NCCP, upon the future adoption of the HCP/NCCP.* Consistent. No riparian habitat was identified on the project site or surrounding area. The property had been extensively disturbed by previous development. COS-P7.6. New development projects shall include setbacks and buffers along riparian corridors and adjacent to habitat for protected species, except where permitted in the Butte Regional Habitat Conservation Plan (HCP) and Natural Community Conservation Plan (NCCP) Planning Area and where such development is consistent with the conditions of the HCP/NCCP, upon the future adoption of the HCP/NCCP.* Consistent. No native habitat was identified on the project site or surrounding area. The property had been extensively disturbed by previous development activity. COS-P7.8. Where sensitive on-site biological resources have been identified, construction employees operating equipment or engaged in any development-associated activities involving vegetation removal or ground disturbing activities in sensitive resource areas shall be trained by a qualified biologist and/or botanist who will provide information on the on-site biological resources (sensitive Consistent. No native habitat was identified on the project site or surrounding area. The property had been extensively disturbed by previous development activity.  Butte County Department of Development Services   April 6, 2022  Agenda Report – Robert R. and Monica R. Seaman TPM22-0002  Page 6 of 20  General Plan 2030 Goals and Policies Consistency Review natural communities, special-status plan and wildlife habitats, nests of special-status birds, etc.), avoidance of invasive plan introduction and spread, and the penalties for not complying with biological mitigation requirements and other State and federal regulations.* GOAL COS-9. Protect identified special-status plant and animal species. Consistent. This goal is more specifically reviewed in the discussion of the policies below. COS-P9.1. A biological resources assessment shall be required for any proposed development project where special-status species or critical habitat may be present. Assessments shall be carried out under the direction of Butte County. Additional focused surveys shall be conducted during the appropriate season if necessary. Upon adoption of the Butte Regional Habitat Conservation Plan (HCP) and Natural Community Conservation Plan (NCCP), assessment requirements of the HCP/NCCP shall be implemented for development projects within the HCP/NCCP area.* Consistent. No native habitat was identified on the project site or surrounding area. The property had been extensively disturbed by previous development activity. GOAL COS-17. Maintain and enhance the quality of Butte County's scenic and visual resources. Consistent. This goal is more specifically reviewed in the discussion of the policies below. COS-P17.1. Views of Butte County's scenic resources, including water features, unique geologic features and wildlife habitat areas, shall be maintained.* Consistent. No scenic resources were identified within the project area that would be adversely impacted by the proposed project, including any substantial water features, unique geological features, or wildlife habitat areas. LAND USE ELEMENT GOAL LU-4 Provide high-quality housing in a range of residential densities and types. Consistent. This goal is more specifically reviewed in the discussion of the policies below. LU-P4.1 - The integrity and stability of existing residential neighborhoods shall be promoted and preserved. Consistent. The project area consists of single-family residential and accessory structure uses within the Very Low Density (VLDR) zone and residentially zoned parcels with residences. Surrounding parcels range in size from 0.50 acres up to 1.0 acres. HEALTH AND SAFETY ELEMENT GOAL HS-1. Maintain an acceptable noise environment in all areas of the county. Consistent. This goal is more specifically reviewed in the discussion of the policies below.  Butte County Department of Development Services   April 6, 2022  Agenda Report – Robert R. and Monica R. Seaman TPM22-0002  Page 7 of 20  General Plan 2030 Goals and Policies Consistency Review HS-P1.1. New development projects proposed in areas that exceed the land use compatibility standards in Tables HS-2 and HS-3 shall require mitigation of noise impacts.* Consistent. No substantial transportation or non-transportation noise sources have been identified in the project area. HS-P1.2. Noise from transportation sources shall not exceed land use compatibility standards in Table HS-2.* Consistent. No substantial transportation or non-transportation noise sources have been identified in the project area. HS-P1.9. The following standard construction noise control measures shall be required at construction sites in order to minimize construction noise impacts: (a.) Equip all internal combustion engine driven equipment with intake and exhaust mufflers that are in good condition and appropriate for the equipment. (b.) Locate stationary noise-generating equipment as far as possible from sensitive receptors when sensitive receptors adjoin or are near a construction project area. (c.) Utilize quiet air compressors and other stationary noise-generating equipment where appropriate technology exists and is feasible.* Consistent. Noise generated by construction activities associated with the project are temporary, intermittent and separated from noise sensitive receptors. Noise control measures are standard in the construction industry and are commonly used to minimize noise impacts to surrounding uses. Additionally, construction activities would be consistent with the County's Noise Control Ordinance. GOAL HS-3. Prevent and reduce flooding. Consistent. This goal is more specifically reviewed in the discussion of the policies below. HS-P3.2. Applicants for new development projects shall provide plans detailing existing drainage conditions and specifying how runoff will be detained or retained on-site and/or conveyed to the nearest drainage facility and shall provide that there shall be no increase in the peak flow runoff to said channel or facility.* Consistent. Future development permits are reviewed by the County Public Works Department, and may require drainage and stormwater detention plans as a condition of permit approval. HS-P3.3. All development projects shall include stormwater control measures and site design features that prevent any increase in the peak flow runoff to existing drainage facilities.* GOAL HS-11. Reduce risks from wildland and urban fire. Consistent. This goal is more specifically reviewed in the discussion of the policies below. HS-P11.1. Fire hazards shall be considered in all land use and zoning decisions, environmental review, subdivisions review and the provision of public services. Consistent. The project is not located in a Fire Hazard Severity Zone or a State Responsibility Area, and therefore, would not be exposed to a significant wildland fire risk.  Butte County Department of Development Services   April 6, 2022  Agenda Report – Robert R. and Monica R. Seaman TPM22-0002  Page 8 of 20  General Plan 2030 Goals and Policies Consistency Review HS-P11.4. New development projects shall meet current fire safe ordinance standards for adequate emergency water flow, emergency vehicle access, signage, evacuation routes, fuel management, defensible space, fire safe building construction and wildfire preparedness. Consistent. The project meets current fire safe standards. Permits for new development would be reviewed by County Fire and Building Departments to ensure that projects have adequate water storage, access, defensible space, building construction, and other fire protection standards. GOAL PUB-13. Plan adequate wastewater infrastructure to serve new development. Consistent. This goal is more specifically reviewed in the discussion of the policies below. PUB-P13.3. New development projects shall demonstrate the availability of a safe, sanitary and environmentally sound wastewater system. Consistent. Permits for new development projects are reviewed by the Butte County Division of Environmental Health to ensure the availability of safe, sanitary and environmentally sound wastewater system is provided. Wastewater systems are reviewed in compliance with Chapter 19 of Butte County Code (On-Site Wastewater Systems). PUB-P13.2. For development projects that will rely on on-site wastewater systems, applicants shall provide detailed plans demonstrating that the system will be adequate to serve the project. BUTTE COUNTY DEPARTMENTS AND OTHER AGENCIES REVIEW Comments/conditions received from Butte County Departments and other Agencies were reviewed and incorporated into the project analysis and proposed project conditions. All requirements are included in Exhibit A – Conditions of Approval. Butte County Fire Department/CAL-FIRE returned the following comments below in Exhibit A. Butte County Environmental Health approved their review by stating that the project meets the specified conditions in PREAP21-0053 (Attachment E) and they had no further conditions. Butte County Public Works comments were provided and included below as conditions in Exhibit A. The Butte County Airport Land Use Commission found the project consistent with the Airport Land Use Compatibility Plan and the B2 Compatibility Zone and imposed conditions included below in Exhibit A. ENVIRONMENTAL REVIEW/CEQA ISSUES In compliance with Section 15061 (b) (3) Common Sense Exemption, this project is exempt from CEQA review. The Common Sense Exemption stipulates that CEQA applies only to projects which have the potential for causing a significant effect on the environment. Where it can be seen  Butte County Department of Development Services   April 6, 2022  Agenda Report – Robert R. and Monica R. Seaman TPM22-0002  Page 9 of 20  with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA. Staff finds upon review of the site using the California Natural Diversity Database none fell within any identified range or area of sensitive species or habitats. The parent parcel is not within a deer herd migration overlay, scenic resource, scenic highway overlay, City of Chico Sphere of Influence, nor is it located within Agricultural Land. The site has been disturbed and does not contain any cultural resources, nor is it near or adjacent to a creek or waterway, it does not contain oak woodlands, has been previously developed, and is flat. The parent parcel is not located within the Watershed Protection Overlay zone, nor is it near any identified fault lines, there is a very low risk of landslide and erosion hazard potential. The parent parcel is located in FEMA flood zone “X” or undefined/unshaded/not applicable. Staff therefore finds with certainty that there is no possibility that the activity in question may have a significant effect on the environment, and is not subject to CEQA.  Butte County Department of Development Services   April 6, 2022  Agenda Report – Robert R. and Monica R. Seaman TPM22-0002  Page 10 of 20  ATTACHMENT A: DRAFT ZONING ADMINISTRATOR DETERMINATION WITH CONDITIONS OF APPROVAL BUTTE COUNTY ZONING ADMINISTRATOR DECISION ZDN22-0009 TENTATIVE PARCEL MAP TPM22-0002 (Robert and Monica Seaman) The project proposes to divide a 2.32-acre parcel, in the VLDR (Very Low Density Residential – 1.0-acre minimum) zone and VLDR (Very Low Density Residential) General Plan designation, into two lots (1.10 and 1.22 acres each). The project will result in the creation of one net new parcel. The parent parcel is zoned Very Low Density Residential (VLDR 1.0 acre minimum) and located in the North Chico Specific Plan at the situs address of 4109 Rio Bravo Drive. APN 047-780-029 April 6, 2022 I. The Zoning Administrator has considered the Section 15061 (b)(3) Common Sense Exemption in accordance with the California Environmental Quality Act (CEQA), and adopts the Exemption with the following findings: A. Upon review of the site using the California Natural Diversity Database none fell within any identified range or area of sensitive species or habitats. The parent parcel is not within a deer herd migration overlay, scenic resource, scenic highway overlay, City of Chico Sphere of Influence, nor is it located within Agricultural Land. The site has been disturbed and does not contain any cultural resources, nor is it near or adjacent to a creek or waterway, it does not contain oak woodlands, has been previously developed, and is flat. The parent parcel is not located within the Watershed Protection Overlay zone, nor is it near any identified fault lines, there is a very low risk of landslide and erosion hazard potential. The parent parcel is located in FEMA flood zone “X” or undefined/unshaded/not applicable. B. On the basis of the whole record before the Zoning Administrator, there is no substantial evidence that the Tentative Parcel Map for Robert and Monica Seaman, Planning Division File No. TPM22-0002 would have a significant effect on the environment. C. The custodian of the record is the Department of Public Works. The location of the record is 7 County Center Drive, Oroville CA 95965. II. Approves Tentative Parcel Map TPM22-0002 for Robert and Monica Seaman, subject to the conditions found in Exhibit “A” and the following findings: A. The proposed map is consistent with the VLDR (Very Low Density Residential, 1.0-acre minimum) zone.  Butte County Department of Development Services   April 6, 2022  Agenda Report – Robert R. and Monica R. Seaman TPM22-0002  Page 11 of 20  Proposed lots meet minimum parcels sizes and will support single-family residential development, consistent with purpose and allowed uses in the VLDR 1.0 zone (BCC §24-18E and §24-19). B. The project is substantially consistent with applicable Goals and Policies of the Butte County General Plan based on the consistency review in the staff report. In addition, there is no substantial evidence in the whole record to support any of the findings in Government Code Section 66474 requiring denial of the tentative parcel map. C. The design and improvements of the proposed parcel map are consistent with County standards and policies provided all conditions of project approval are met. Comments/conditions received from Butte County Departments and other Agencies were reviewed and incorporated into the project analysis and proposed project conditions. Design and improvements of the proposed Parcel Map are consistent with County standards and policies. D. The project site is physically suitable for the use and density of the proposed development. The proposed Parcel sizes are consistent with the minimum parcel size requirement of the VLDR (1.0-acre minimum) zone. Existing and proposed single-family residences are consistent with the primary allowed land uses in the VLDR zone. E. The design and improvements of the project will not conflict with easements acquired by the public at large for access through or use of property within the proposed parcel map provided the attached conditions are met. No easements will be abandoned with the proposed TPM. F. The project site is not located within an earthquake fault zone. There is only one known active fault within Butte County and it is located approximately 20 miles to the southeast. G. Approval of this project will not be detrimental to the public health, safety, and welfare provided the required conditions and mitigation measures are complied with. No adverse or detrimental effects to the environment or public health, safety, and welfare have been identified as resulting from the project, from agency and departmental review, or from staff analysis. H. The roads in the project area have the capacity to handle the increase in vehicular traffic generated by the project. The addition of one residential dwelling would have a negligible effect on local or regional traffic. Approved By: Curtis Johnson Date: April 6, 2022  Butte County Department of Development Services   April 6, 2022  Agenda Report – Robert R. and Monica R. Seaman TPM22-0002  Page 12 of 20  EXHIBIT A Tentative Parcel Map for Robert and Monica Seaman on APN 047-780-029, File # TPM22-0002 The project proposes to divide a 2.32-acre parcel, in the VLDR (Very Low Density Residential – 1.0-acre minimum) zone and VLDR (Very Low Density Residential) General Plan designation, into two lots (1.10 and 1.22 acres each). The project will result in the creation of one net new parcel. The parent parcel is zoned Very Low Density Residential (VLDR 1.0 acre minimum) and located in the North Chico Specific Plan at the situs address of 4109 Rio Bravo Drive. I. Conditions of Approval: Public Works A. STREETS 1. Prior to recordation of the parcel map, obtain an encroachment permit and improve all driveway approaches to publicly maintained roads as specified in the county improvement standards and the terms of the encroachment permit. B. DRAINAGE 2. Prior to the recordation of the parcel map an engineered plan for a permanent solution for drainage shall be submitted to and approved by the Department of Public Works. The drainage plans shall specify how stormwater runoff will be attenuated on site by detention facilities and/or conveyed to the nearest natural or publicly maintained drainage channel or facility and shall provide developed-condition peak flow discharge not greater than the pre- development condition for all storm events, and no increase in stormwater volume over the design storm duration to said channel or facility. Detention facilities must either discharge to receiving channel with no backwater from the channel, or attenuate full stormwater volume onsite. Backwater condition is present when detention facility, with gravity flow, has an outlet elevation at or below the approved 100 year water surface elevation of the receiving channel. Drainage plans shall establish and delineate an emergency overland point of release to the nearest natural or publicly maintained drainage channel or facility. If storm drain infiltration trenches are utilized for drainage mitigation, documentation shall be submitted to the Department that supports the design percolation rate. If used, stormwater pumps shall have redundant pump systems, back-up power, and discharge control mechanism(s) to prevent discharge during high flow events in receiving channel. Prior to final improvement inspection, the design dimensions and volume of detention facilities shall be confirmed using topographic land survey by the engineer of record. C. COMPLIANCE WITH BUTTE COUNTY STORMWATER ORDINANCE  Butte County Department of Development Services   April 6, 2022  Agenda Report – Robert R. and Monica R. Seaman TPM22-0002  Page 13 of 20  3. Construction Phase: Prior to issuing a grading or a building permit, or prior to approval of improvement plans, submit an erosion and sediment control plan (ESCP) to Public Works department for approval. ESCP shall contain site-specific construction site Best Management Practices (BMPs). BMPs included in the ESCP must be in accordance with Section 50-19 of County Code, and/or consistent with the California Stormwater Quality Association BMPs. Revisions to an approved ESCP must be resubmitted for Department of Public Works approval prior to commencing with site work. If development activities result in soil disturbance greater than one acre, a Storm Water Pollution Prevention Plan (SWPPP) shall be developed pursuant to the construction stormwater general permit (CGP) and may be submitted in lieu of the ESCP. Add a note on a map sheet that states: “Development activities resulting in soil disturbance shall submit an erosion and sediment control plan (ESCP) to the Department of Public Works for approval. ESCP shall contain appropriate site-specific construction site BMPs.” D. PARCEL MAP 4. Show all easements of record on the parcel map. 5. Prior to recordation of the parcel map, pay in full any and all delinquent, current and estimated taxes and assessments as specified in Article 8 of Chapter 4 of Division 2 of Title 7, of the California Government Code commencing with Section 66492. 6. Pay the recording fees in effect at the time the parcel map and related documents are recorded. 7. Prior to recordation of the parcel map, pay North Chico Specific Plan Area development impact fees per Article XVII, Chapter 3 of Butte County Code. 8. Prior to recordation of the parcel map, pay all applicable assessments established by affected assessment districts, in full. Cal Fire/Butte County Fire 9. Construction, installation or development of buildings and/or roads, driveways, gates and bridges on parcels/lots shall comply with the current adopted California Building Standard Codes and current Butte County Improvement Standards, whichever is stricter. 10. Prior to building construction, provide an all-weather access of at least 10 feet wide for residential, and 20 feet wide for commercial, and vertical clearance of 15 feet that will allow for ingress and egress and accommodate a 40,000-pound fire apparatus to within 150 feet of all structures. 11. Place a note on a separate document, which is to be recorded concurrently with the Parcel or Final map, or on an additional map sheet stating, “Building identification and/or addresses shall be installed in conformance with Public Resources Code 4290 and shall be posted at the time of permit issuance and maintained continuously thereafter. Butte County Airport Land Use Commission  Butte County Department of Development Services   April 6, 2022  Agenda Report – Robert R. and Monica R. Seaman TPM22-0002  Page 14 of 20  12. Prior to final approval of the parcel map, if an Avigation Easement has not been recorded on the parcel, record as a separate instrument an Avigation Easement granting the right of continued use of the airspace above the proposed parcel(s) by the Chico Municipal Airport and acknowledging any and all existing or potential airport operational impacts. 13. Place a note on a separate document which is to be recorded concurrently with the parcel map or on an additional map sheet that states: “An Avigation Easement is recorded above the parcels for the Chico Municipal Airport and acknowledging any and all existing or potential airport operational impacts.” 14. Place a note on a separate document which is to be recorded concurrently with the final map or on an additional map sheet that states: “The project parcels are in the proximity of the Chico Municipal Airport and are subject to aircraft overflight.” 15. Place a note on a separate document which is to be recorded concurrently with the final map or on an additional map sheet that states: “Airspace review by the Airport Land Use Commission is required for all objects over 35 feet in height above ground level.” Processing Fees 16. Prior to recordation of the Parcel Map, pay any outstanding project-related processing fees. II. NOTATION A. Minor changes may be approved administratively by the Directors of Development Services, Environmental Health, or Public Works upon receipt of a substantiated written request by the applicant, or their respective designee. Prior to such approval, verification shall be made by each Department or Division that the modification is consistent with the application, fees paid and environmental determination as conditionally approved. Changes deemed to be major or significant in nature shall require a formal application for amendment.  Butte County Department of Development Services   April 6, 2022  Agenda Report – Robert R. and Monica R. Seaman TPM22-0002  Page 15 of 20  ATTACHMENT B: ZONING MAP  Butte County Department of Development Services   April 6, 2022  Agenda Report – Robert R. and Monica R. Seaman TPM22-0002  Page 16 of 20  ATTACHMENT C: TENTATIVE PAREL MAP  Butte County Department of Development Services   April 6, 2022  Agenda Report – Robert R. and Monica R. Seaman TPM22-0002  Page 17 of 20  ATTACHMENT D: ALUC CONSISTENCY FINDINGS Department of Development Services Paula M. Daneluk, AICP, Director Pete Calarco, Assistant Director 7 County Center Drive T: 530.552.7601 Oroville, California 95965 F: 530.538.7785 April 21, 2021 Robert and Monica Seaman 4109 Rio Bravo Drive Chico, CA 95973 Subject: BCALUC Consistency Review (A21-0002) of a proposed two-lot parcel map on APN: 047-780-029 (4109 Rio Bravo Drive, Chico) Dear Mr. & Mrs. Seaman: The Butte County Airport Land Use Commission (BCALUC) held the consistency review of your proposed two-lot parcel map on April 21, 2021. While the project would normally be determined inconsistent with the density of the B2 Compatibility Zone, the BCALUC found the project compatible/acceptable, per Section 3.8 Exceptions to Land Use Criteria, 3.8.2 Site-Specific Special Conditions, with the required findings. Please see attached conditions that will included as part of the tentative parcel map. Should you have any questions regarding this matter, please contact me at 552-3683, between 8:00 a.m. and 4:00 p.m., Monday through Friday, or by email at mmichelena@buttecounty.net. Sincerely, Mark Michelena Senior Planner Cc. Wes Gilbert buttecounty.net/dds  Butte County Department of Development Services   April 6, 2022  Agenda Report – Robert R. and Monica R. Seaman TPM22-0002  Page 18 of 20  A21-0002 (Robert and Monica Seaman) APN 047-780-029 Conditions 16. Prior to final approval of the parcel map, if an Avigation Easement has not been recorded on the parcel, record as a separate instrument an Avigation Easement granting the right of continued use of the airspace above the proposed parcel(s) by the Chico Municipal Airport and acknowledging any and all existing or potential airport operational impacts. 17. Place a note on a separate document which is to be recorded concurrently with the parcel map or on an additional map sheet that states: “An Avigation Easement is recorded above the parcels for the Chico Municipal Airport and acknowledging any and all existing or potential airport operational impacts.” 18. Place a note on a separate document which is to be recorded concurrently with the final map or on an additional map sheet that states: “The project parcels are in the proximity of the Chico Municipal Airport and are subject to aircraft overflight.” 19. Place a note on a separate document which is to be recorded concurrently with the final map or on an additional map sheet that states: “Airspace review by the Airport Land Use Commission is required for all objects over 35 feet in height above ground level.”  Butte County Department of Development Services   April 6, 2022  Agenda Report – Robert R. and Monica R. Seaman TPM22-0002  Page 19 of 20  ATTACHMENT E: BUTTE COUNTY ENVIRONMENTAL HEALTH PREAP  Butte County Department of Development Services   April 6, 2022  Agenda Report – Robert R. and Monica R. Seaman TPM22-0002  Page 20 of 20 