Loading...
HomeMy WebLinkAboutLeach Field Analysis Letter5155 VENTURE PARKWAY • REDDING, CA 96002 • (530) 244-0202 June 7, 2022 2630.10 SENT BY EMAIL ONLY kandoe@palermok8.org Kathleen Andoe-Nolind, Superintendent Palermo Union Elementary School District 7390 Bulldog Way Palermo, CA 95968 Dear Kathleen, Subject: Honcut Elementary School Water Main Alignment and Relocation of Leach Field Analysis Palermo Union Elementary School District (District) applied for Technical Assistance through the State Water Resources Control Board (SWRCB) to complete planning efforts for construction of a new well as part of a Corrective Action Plan required by Butte County Environmental Health (BCEH). The purpose of this letter is to analyze three different alignments for new water to the three existing classrooms. A technical memorandum, dated December 2021, was completed discussing the existing deficiencies within the Honcut School water system. The proposed project includes the following items: • Concrete masonry unit (CMU) block well building to house the new well with a separate chlorine room. o The new building is sized large enough to house future treatment equipment if needed. • 50 GPM submersible well pump. • Chlorine day tank, pump, and appurtenances. • 400-gallon bladder tank. • Piping and appurtenances to connect the new well to all three classrooms and irrigation system. • Automatic transfer switch and connection to a new generator. (Generator is not included in the Scope of Work for this project.) • Fencing to protect the water system infrastructure. • Destroy the old well per Department of Water Resources (DWR) Bulletin 74-81 and 74-90. • Remove the building and all aboveground appurtenances associated with the old well. Palermo Union Elementary School District June 7, 2022 Page 2 2630.10 Due to the unknown condition of the water line behind the three classrooms and the uncertainty of the water main’s location behind the classrooms, it was recommended the new water main extend all the way to Classroom No. 1 and a stub out for Classroom No. 2 and the future modular building. Classroom No. 2 currently does not have any water fixtures inside the building. There are three alternatives for the water main alignment, see Figure 1. The advantages and disadvantages of each alternative alignment are discussed herein. A preliminary construction cost estimate for each alternative is also included. Alternative 1 – Water Main Alignment South of the Classrooms From the new well, this alignment crosses East Street, follows the fence line to the west end of the basketball court, and cuts through the new asphalt to Classroom No. 3 and south of the classrooms to Classroom No. 1. In this alternative, the leach field would remain as is. Advantages: • Construction costs are less than other alternatives. Disadvantages: • Has approximately nine feet of horizontal separation and unknown vertical separation from the school’s existing leach field. Per California Code of Regulations, Title 22, Section 64572, new water supply lines shall not be installed in the same trench as any pipeline conveying untreated, primary, or secondary treated sewage and shall be at least 25 feet horizontally from the nearest edge of septic tank and sewage leach field. Since the new water main cannot meet the minimum separation requirements from the existing leach field, it is recommended a dual-wall water pipe be installed in this area. This solution will need to be approved by Division of Drinking Water (DDW) and BCEH. o Less than one foot of horizontal separation from the septic tank. o New water supply will cross over the sewer lateral for each classroom (two crossings on pipeline containing sewer). o Leaks in dual-wall pipe are more difficult to detect. If the District ever needed to replace the dual-wall pipe, they will have to special order the pipe. In other words, a dual-wall pipe that is NSF approved cannot be found in local hardware stores. The closest supplier is located over an hour away in either Rocklin or Sacramento, California. • Contractor must hand dig approximately 70 feet behind the classrooms due to unknown utilities and their location. Preliminary Construction Cost Estimate: A preliminary construction cost estimate is included in Table 1. Since all project components will be the same within the well building, they are not included in this preliminary construction cost estimate. As can be seen therein, the construction cost is approximately $44,600. It should be noted, budgetary cost estimates are likely to change depending on how busy suppliers and contractors are at bid time. Palermo Union Elementary School District June 7, 2022 Page 3 2630.10 Table 1 – Water Main Alternative 1 – Preliminary Cost Estimate No. Item Qty Unit Unit Cost Total Cost 1 Construction Cost 2 Water Main 3 2-inch Water Main w/Class "C" Bkfl 65 LF $100 $6,500 4 2-inch Water Main w/Class "A1" Bkfl 55 LF $160 $8,800 5 2-inch Water Main w/Class "A5" Bkfl 25 LF $180 $4,500 6 2-inch Dual-Wall Water Main w/Class "A3" Bkfl 25 LF $225 $5,625 7 2-inch Dual-Wall Water Main w/Class "C" Bkfl - Hand Dig 70 LF $200 $14,000 8 1-inch Water Main w/Class "C" Bkfl 10 LF $100 $1,000 9 1-inch Gate Valve 4 EA $40 $160 10 Water Main Construction Cost Subtotal: $40,585 11 Contingency at 10%: $4,000 12 Construction Cost Total: $44,600 Notes: 1. All costs are in May 2022 dollars (ENR CCI = 13,004). Alternative 2 – Water Main Alignment Follows Fence Line This alignment crosses East Street and follows the fence line south of the classrooms to the tie-in at Classroom No. 1. This alternative will require relocation of the leach field. There are a few factors to be considered when installing/replacing a septic system and leach field including: • Is the old septic tank watertight and sized correctly? • Will pumping be required to relocate the leach field? • What are the soil properties of the new location? o Will the soil allow for percolation? BCEH has the following requirements for a new septic system: • Must meet current code. • Soils evaluation/percolation test must be completed. • Must meet Butte County (County) setback requirements from existing property lines, potable water wells, and other leach fields as shown in Table 2. PACE Engineering, Inc. (PACE) has completed preliminary research of the neighboring systems, and County setback requirements can be met, see Figure 1. Palermo Union Elementary School District June 7, 2022 Page 4 2630.10 Table 2 - Butte County Septic System Location and Setbacks Distance Required From From Drain Field From Septic Tank, ATU, or Lined Sand Filter Public well 150 ft 150 ft Private well 100 ft 50 ft Other wells, excluding monitoring wells 100 ft 50 ft Reservoirs or lakes (downslope from wastewater system) 200 ft 50 ft Reservoirs or lakes (upslope from wastewater system) 100 ft 50 ft Year-round springs, streams, creeks, or ponds 100 ft 50 ft Intermittent streams and drainage swales 50 ft 50 ft Cuts manmade in excess of 2.5 ft or escarpments 4x height of bank to a maximum of 50 ft 20 ft Property lines and foundation lines of any structure, including garages, out buildings, in-ground swimming pools, and/or water lines 5 ft 5 ft Public access easement 20 ft 20 ft Other easements Clear Clear The County also requires a Certified Designer be involved since the septic system is for a school. PACE reached out to a handful of Certified Designers on the County’s current list of approved designers to include the average cost for design in the preliminary construction cost estimate for this alternative. The County has also indicated that if the leach field will be on a neighboring property, even if it is owned by the District, the property will need to have a Deed Restriction recorded. Advantages: • Requires less fittings. • Alignment can stay in a straight line and not under asphalt. • Per California Code of Regulations, Title 22, Section 64572, horizontal and vertical separation requirements are met even when crossing perpendicular over the new leach line, including concrete encasement at crossing. o Only one crossing of any pipeline containing sewer. • Same type of pipe through entire pipe alignment (i.e., dual-wall pipe is not needed). Disadvantages: • Must have County-approved Certified Designer involved. • District must file a Deed Restriction. Preliminary Construction Cost Estimate: A preliminary construction cost estimate is included in Table 3. Since all project components will be the same within the well building, they are not included in this preliminary construction cost estimate. As can be seen therein, the construction cost is approximately $84,600. Palermo Union Elementary School District June 7, 2022 Page 5 2630.10 While the preliminary construction cost estimate includes the cost to complete percolation testing, the following assumptions were made: • Soils are such that percolation can occur. • Pumping will not be required from the septic tank to the new leach field. • The existing septic tank does not need to be resized but will be replaced to meet current code requirements. Table 3 – Water Main Alternative 2 – Preliminary Cost Estimate No. Item Qty Unit Unit Cost Total Cost 1 Construction Cost 2 Water Main 3 2-inch Water Main w/Class "A1" Bkfl 55 LF $160 $8,800 4 2-inch Water Main w/Class "A5" Bkfl 25 LF $180 $4,500 5 2-inch Water Main w/Class "C" Bkfl 155 LF $100 $15,500 6 1-inch Water Main w/Class "C" Bkfl 30 LF $100 $3,000 7 1-inch Gate Valve 4 EA $30 $120 8 Water Main Construction Cost Subtotal: $31,920 9 Leach Field 10 Site Evaluation with County 1 LS $500 $500 11 Certified Designer Cost 1 LS $2,500 $2,500 12 Percolation Testing and Analysis 1 LS $2,000 $2,000 13 New Septic Tank and Leach Field 1 LS $40,000 $40,000 14 Leach Field Construction Cost Subtotal: $45,000 15 Construction Cost Subtotal: $76,920 16 Contingency at 10%: $7,700 17 Construction Cost Total: $84,600 Notes: 1. All costs are in May 2022 dollars (ENR CCI = 13,004). Alternative 3 – Water Main Alignment North of the Classrooms From the new well, this alignment crosses East Street and cuts through the playground asphalt north of the three classrooms. A service line for Classroom Nos. 2 and 3 will run along the east side of Classroom No. 3 and south of Classroom No. 3, immediately behind the building, to Classroom No. 2. A service line for Classroom No. 1 and the future modular building will run along the west side of Classroom No. 1 and then on the south side of Classroom No. 1 to its connection point. In this alternative, the leach field will remain as is. Advantages: • Per California Code of Regulations, Title 22, Section 64572, horizontal and vertical separation requirements are met, except for the service line behind Classroom Nos. 1 and 3. o These service lines would cross over the sewer service lateral for each classroom. (Two crossings of pipeline containing sewer.) Palermo Union Elementary School District June 7, 2022 Page 6 2630.10 Disadvantages: • Water main would be under the playground asphalt. • Per California Code of Regulations, Title 22, Section 64572, horizontal separation requirements cannot be met for the approximate 60 feet of service line behind Classroom Nos. 1 and 3. Preliminary Construction Cost Estimate: A preliminary construction cost estimate is included in Table 4. Since all project components will be the same within the well building, they are not included in this preliminary construction cost estimate. As can be seen therein, the construction cost is approximately $89,700. Table 4 – Water Main Alternative 3 – Preliminary Cost Estimate No. Item Qty Unit Unit Cost Total Cost 1 Construction Cost 2 Water Main 3 2-inch Water Main w/Class "C" Bkfl 55 LF $100 $5,500 4 2-inch Water Main w/Class "A1" Bkfl 45 LF $160 $7,200 5 2-inch Water Main w/Class "A5" Bkfl 20 LF $180 $3,600 6 2-inch Water Main w/Class "A3" Bkfl 250 LF $225 $56,250 7 2-inch Water Main w/Class "C" Bkfl - Hand Dig 25 LF $200 $5,000 8 1-inch Water Main w/Class "C" Bkfl 40 LF $100 $4,000 9 1-inch Gate Valve 4 EA $40 $160 10 Water Main Construction Cost Subtotal: $81,710 11 Contingency at 10%: $8,000 12 Construction Cost Total: $89,700 Notes: 1. All costs are in May 2022 dollars (ENR CCI = 13,004). Recommended Alternative Alternative 1 does not meet the California Code of Regulations, Title 22, Section 64572 horizontal separation requirements of 25 feet. This alternative also requires specialty pipe to be installed that will not only be difficult but also costly for the District to replace in the future. As such, this alternative is not recommended. While Alternative 3 does not require relocation of the leach field, California Code of Regulations, Title 22, Section 64572 horizontal separation requirements still cannot be met behind the classrooms. Alternative 2 is the only alternative where the separation requirements can be met. Assuming percolation can occur, pumping is not required, and the existing septic tank does not need to be resized, Alternative 2 is also the most cost-effective option. Therefore, Alternative 2 is the recommended alternative. Palermo Union Elementary School District June 7, 2022 Page 7 2630.10 PACE would like to thank District staff for their able assistance in its preparation. Please contact us with any questions. Sincerely, Nicole Humphreys Staff Engineer Enclosure M:\Jobs\2630 UEI CSUS\2630.10 Honcut School Well\Design\Leach Field\Leach Field Analysis Letter.docx X X X X XXXX XX X X X HB EE E EE P W XXXXXXXXXX XXXXX1" = 20'9.6'18'9'EAST ST(E) STORAGE BLDG ROOM 1 ROOM 2 ROOM 3 1+40.89 APPROX LOCATION OF FUTURE MODULAR BLDG APN: 028-073-014 (E) SHED (E) AC APN:028-073-001 APN:028-074-001(E) WELL BLDG AND WELL (E) SCHOOL LEACH LINE (E) SCHOOL SEPTIC TANK APPROX LOCATION OF GENERATOR (INSTALLED BY OTHERS) APPROX 100' RADIUS FROM NEAREST NEIGHBORING WELL (N) 3" IRRIG W (N) 2" PW (E) WELL SEE NOTE 2 PROPERTY BOUNDARY DUAL-WALL PIPE 36.7'(E) APPROX PROP BOUNDARY, TYP, SEE NOTE 17.1'0.9'(N) CMU WELL BLDG 11'8'FIGURE 1 DATE: 5/12/22 JOB # 2630.10 WATER MAIN ALIGNMENT ALTERNATIVES NOTES: 1.PACE CONDUCTED RECORDS RESEARCH FROM READILY AVAILABLE SOURCES INCLUDING BUTTE COUNTY RECORDS TO OBTAIN THE REQUISITE RECORD DOCUMENTS THAT DESCRIBE OR DEPICT THE PROPERTY LINE FOR THIS PROJECT. ON JULY 8, 2020, PACE CONDUCTED A FIELD SURVEY TO LOCATE A SUFFICIENT NUMBER OF CONTROLLING MONUMENTS AND/OR PHYSICAL FEATURES TO GEOGRAPHICALLY CORRELATE THE OBTAINED RECORD INFORMATION TO THE PROJECT'S COORDINATE SYSTEM. WITH THIS INFORMATION, PACE WAS ABLE TO PREPARE AN AUTOCAD DRAWING DEPICTING THE APPROXIMATE LOCATION OF SAID PROPERTY LINES. THE PROPERTY LINES ARE PLOTTED TO A SUFFICIENT ACCURACY FOR THE DESIGN CONSTRAINTS (± SEVERAL FEET). IN THE EVENT THE DISTRICT REQUIRES A HIGHER DEGREE OF ACCURACY FOR SPECIFIC PORTIONS OF THE PROJECT, ADDITIONAL FIELD WORK AND ANALYSIS WILL BE REQUIRED. 2.UNKNOWN UTILITIES BEHIND EXISTING CLASSROOMS. CONTRACTOR TO HAND DIG THIS AREA. (N) POTABLE WATER SHALL BE DUAL-WALL PIPE AND HAVE 24 INCHES OF COVER IN THIS AREA. LINE LEGENDLINE LEGEND WATER MAIN ALTERNATIVE 1 ALIGNMENT WATER MAIN ALTERNATIVE 2 ALIGNMENT (E) SEPTIC TANK AND LEACH FIELD PROPOSED LEACH FIELD LINE LEGEND WATER MAIN ALTERNATIVE 3 ALIGNMENT