HomeMy WebLinkAbout8.12.22 Board Correspondence - FW_ Progress Report submitted in FERC P-2107-000 by Pacific Gas and Electric
From:Paulsen, Shaina
To:BOS
Cc:Hatcher, Casey
Subject:Board Correspondence - FW: Progress Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company,et al.
Date:Friday, August 12, 2022 12:25:35 PM
Please see Board Correspondence below.
Shaina Paulsen
Associate Clerk of The Board
Butte County Administration
25 County Center Drive, Suite 200, Oroville, CA 95965
T: 530.552.3304 | F: 530.538.7120
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Friday, August 12, 2022 12:15 PM
Subject: Progress Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking
on links, or replying..
On 8/12/2022, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
PG&E Corporation (as Agent)
Docket(s): P-2107-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Progress Report
Description: Pacific Gas and Electric Company submits Final Construction Report for the Poe Reservoir Access Trail Project of the
Poe Hydroelectric Project under P-2107.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?
accession_num=20220812-5124__;!!KNMwiTCp4spf!Eg-
Nl55Ra0L6MIWDlKUVVbU9l2QooxwWX6XB5RF73r2M7Zb3CihsGthi2fi8Hoq1yxcPM8h5dK7gmLVCaOM08tbnj0SdzM3lPu11$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!Eg-
Nl55Ra0L6MIWDlKUVVbU9l2QooxwWX6XB5RF73r2M7Zb3CihsGthi2fi8Hoq1yxcPM8h5dK7gmLVCaOM08tbnj0SdzE_Uwofx$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Eg-
Nl55Ra0L6MIWDlKUVVbU9l2QooxwWX6XB5RF73r2M7Zb3CihsGthi2fi8Hoq1yxcPM8h5dK7gmLVCaOM08tbnj0SdzCSjhNc2$
or for phone support, call 866-208-3676.
902203133
POE RECREATIONAL ENHANCEMENT
PROJECT
POE RESERVOIR ACCESS
POE HYDROELECTRIC PROJECT, FERC NO. 2107
FINAL CONSTRUCTION REPORT
PREPARED BY: JANIS BOULANT
POWER GENERATION DEPARTMENT DATE: AUGUST 2022
Poe Reservoir Access – Poe Hydroelectric Project, FERC No. 2107
August 2022 – Final Construction Report
TABLE OF CONTENTSPAGE
1. GENERAL ............................................................................................................ 1
1.1 Background .............................................................................................. 1
1.2 Summary of Construction Chronology .................................................. 1
1.3 Construction Difficulties ......................................................................... 1
1.4 Original Structure Findings .................................................................... 1
2. FOUNDATIONS ................................................................................................... 2
3. EMBANKMENTS .................................................................................................2
4.CONCRETE WORK.............................................................................................2
5. ANCHORS........................................................................................................... 2
6. INSTRUMENTATION ........................................................................................... 2
7. DRAWINGS.......................................................................................................... 2
APPENDICES
A. As-Built Drawings
B. Photographs
C. Construction Certifications:
Quality Control Manager
Design Engineer
Licensee
Poe Reservoir Access – Poe Hydroelectric Project, FERC No. 2107
August 2022 – Final Construction Report
1.GENERAL
1.1 Background
The Poe Reservoir Access Project (Project) site is part of the Poe Recreational Enhancement
Project, which contains six separate recreational enhancement sites located within the Poe
Hydroelectric Project No. 2107. Recreational project sites are located along the North Fork
Feather River (NFFR), upstream of Lake Oroville,in Butte County between Cresta Powerhouse
and Poe Powerhouse.
The purpose of the Project was to improve access to NFFR for recreational users, including
parking and trail. The Project improvements included the following key features:
Parking for passenger vehicles.
A minimum 6-foot-wide dirt access from the parking area to Poe Reservoir.
Information signage.
As-built drawings are included in Appendix A. Refer to Appendix B for photographs taken
during construction.
1.2 Summary of Construction Chronology
PG&E’s general construction (GC) crew performed all construction work. The following is a
summary of construction events:
Construction started the week of April 4, 2022.
Clearing and grubbing for trail alignment began April 5, 2022.
Trail alignment and cut/fill staking began April 6, 2022.
Constructing of trail began April 6, 2022.
Parking area work began April 11, 2022.
Signs installed and construction completed on May 31, 2022.
See Appendix C for construction certifications.
1.3 Construction Difficulties
No Design Change Notifications (DCN) were issued for any construction difficulties as part of
this project. The only notable changes were some slight trail alignment adjustments and the
elimination of the aggregate base compaction requirement in the parking area. All are
documented in the as-built drawings.
It was determined to eliminate the requirement for the compaction of aggregate base at the
parking area because there was already an established parking area at the trail head.
1.4 Original Structure Findings
Original structure findings are not applicable to this construction project.
1
Poe Reservoir Access – Poe Hydroelectric Project, FERC No. 2107
August 2022 – Final Construction Report
2.FOUNDATIONS
Foundations are not applicable to this construction project.
3.EMBANKMENTS
Embankments are not applicable to this construction project.
4. CONCRETE WORK
This project only included minor concrete workfor the signpost footings.
5. ANCHORS
Anchors are not applicable to this construction project.
6. INSTRUMENTATION
Instrumentation is not applicable to this construction project.
7. DRAWINGS
As-built drawings have been reduced to 11” x 17” and are included in Appendix A of this report.
2
Poe Reservoir Access – Poe Hydroelectric Project, FERC No. 2107
August 2022 – Final Construction Report
APPENDIX A
AS-BUILT DRAWINGS
Poe Reservoir Access – Poe Hydroelectric Project, FERC No. 2107
August 2022 – Final Construction Report
APPENDIX B
PHOTOGRAPHS
Poe Reservoir Access – Poe Hydroelectric Project, FERC No. 2107
August 2022 – Final Construction Report
Photo 1 – View Looking at End of Trail Prior to Start of
Construction (4/8/2022)
Photo 2 – Poe Reservoir Trail Construction (4/8/2022)
Poe Reservoir Access – Poe Hydroelectric Project, FERC No. 2107
August 2022 – Final Construction Report
Photo 3 – Poe Reservoir Trail Construction (4/8/2022)
Photo 4 – Poe Reservoir Trail Construction (4/8/2022)
Poe Reservoir Access – Poe Hydroelectric Project, FERC No. 2107
August 2022 – Final Construction Report
Photo 5 – Poe Reservoir Parking Area Construction (5/25/2022)
Photo 6 – Poe Reservoir Trail Construction (5/25/2022)
Poe Reservoir Access – Poe Hydroelectric Project, FERC No. 2107
August 2022 – Final Construction Report
Photo 7 – Poe Reservoir Trail Construction (5/25/2022)
Photo 8 – Poe Reservoir Trail Completed (5/25/2022)
Poe Reservoir Access – Poe Hydroelectric Project, FERC No. 2107
August 2022 – Final Construction Report
Photo 9 – Poe Reservoir Trail (5/25/2022)
Photo 10 – Poe Reservoir Trail - Water Bar (5/25/2022)
Poe Reservoir Access – Poe Hydroelectric Project, FERC No. 2107
August 2022 – Final Construction Report
Photo 11 –Poe Reservoir Trail,with Rock Used to Retain Fill (5/25/2022)
Photo 12 – Poe Reservoir Trail Construction (5/25/2022)
Poe Reservoir Access – Poe Hydroelectric Project, FERC No. 2107
August 2022 – Final Construction Report
Photo 13 – Poe Reservoir Trail Construction (5/25/2022)
Photo 14 – Poe Reservoir Trail Construction (5/25/2022)
Poe Reservoir Access – Poe Hydroelectric Project, FERC No. 2107
August 2022 – Final Construction Report
Photo 15 –Poe Reservoir Trail Construction (5/25/2022)
Photo 16 –Poe Reservoir Trail Signage (5/30/2022)
Poe Reservoir Access – Poe Hydroelectric Project, FERC No. 2107
August 2022 – Final Construction Report
APPENDIX C
CONSTRUCTION CERTIFICATIONS