Loading...
HomeMy WebLinkAbout8.2.22 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. (2) From:Paulsen, Shaina To:BOS Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Tuesday, August 2, 2022 9:25:21 AM Please see Board Correspondence below. Shaina Paulsen Associate Clerk of The Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 T: 530.552.3304 | F: 530.538.7120 -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, August 1, 2022 4:45 PM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 8/1/2022, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company No Organization Found (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas & Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submits Status Update re Recommendation 3 from the 11th Part 12D Safety Inspection Report for Bucks Storage Dam of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20220801- 5262__;!!KNMwiTCp4spf!AiGSslFWNTBwQFO2xqMwsXKVx8RxcwAMuboPk7GnDrQr9WhLUQJuJWFDetEks0hKKatV5VNLC-GD3U2wD3_8q5GiZMe0Om4Hw_cn$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!AiGSslFWNTBwQFO2xqMwsXKVx8RxcwAMuboPk7GnDrQr9WhLUQJuJWFDetEks0hKKatV5VNLC- GD3U2wD3_8q5GiZMe0Ol2Elq3I$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!AiGSslFWNTBwQFO2xqMwsXKVx8RxcwAMuboPk7GnDrQr9WhLUQJuJWFDetEks0hKKatV5VNLC- GD3U2wD3_8q5GiZMe0OtyJD81R$ or for phone support, call 866-208-3676. 245 Market Street tƚǞĻƩ DĻƓĻƩğƷźƚƓ San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 San Francisco, CA 94177 August 1, 2022 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Storage Dam, NATDAM No. CA00332 11th Part 12D Safety Inspection Report - Recommendation 3 Status Update Dear Frank L. Blackett: This letter presents a status update and plan and schedule for further actions to address Recommendation 3 (R-3) from the 11th 5-year Part 12D safety inspection of Bucks Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. PG&E submitted its original plan and schedule for addressing R-3 in a letter to your office dated December 31, 2020, with a subsequent extension of time request on December 30, 2021. PG&E recommendation is enclosed with this letter (Enclosure1). Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762-9459. For general questions, please contact Holly Tarr, license coordinator for PG&E, at (530) 789-7653. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer ENCLOSURE 1 Enclosure 1 Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Storage Dam, NATDAM No. CA00332 Status Update and Plan and Schedule for Further Actions to Address Recommendation 3 from the 11th 5-Year Part 12D Safety Inspection Report Recommendation (R-3) was provided in the 11th 5-year Part 12D safety inspection report for Bucks Storage Dam, which is part of Pacific Gas an (PG&E) Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. For reference, R-3 is copied below, and plan and schedule for further actions to address the recommendation. R-3: The IC recommends that a study be performed to establish annual exceedance probabilities for key reservoir elevations related to dam safety, and pool elevation duration relationships. Key reservoir elevations include those associated with the spillway crest, the top of the flashboards, and overtopping of the wave coping wall and dam crest. See Section 3.2.1 and PFMs 8, 1, 2, and 5. In accordance with the original plan and schedule for R-3, PG&E has retained an engineering consultant to perform a stage-frequency analysis for Bucks Storage Lake. PG&E plans to submit the report summarizing the findings from the analysis to FERC by April 30, 2023. 1