Loading...
HomeMy WebLinkAbout8.2.22 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. (2) From:Paulsen, Shaina To:BOS Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. Date:Tuesday, August 2, 2022 9:26:31 AM Please see Board Correspondence below. Shaina Paulsen Associate Clerk of The Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 T: 530.552.3304 | F: 530.538.7120 -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, August 2, 2022 5:55 AM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 8/2/2022, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submits Summary and Closure of Second Part 12D Inspection, Recommendation 4 for the Round Valley Dam which is part of DeSabla-Centerville Hydroelectric Project under P-803 To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20220802- 5015__;!!KNMwiTCp4spf!F6IElG_VDDNzOU7dqbn7wlMT_fL6dZQZjncL-riLNAYxfFB2uUz7tG-PA9T0Eg6Ii9Su-- NDaPr6XlgZ3JhxJIWQMm2_gkkT1RnY$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!F6IElG_VDDNzOU7dqbn7wlMT_fL6dZQZjncL- riLNAYxfFB2uUz7tG-PA9T0Eg6Ii9Su--NDaPr6XlgZ3JhxJIWQMm2_gr6lgsSr$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!F6IElG_VDDNzOU7dqbn7wlMT_fL6dZQZjncL- riLNAYxfFB2uUz7tG-PA9T0Eg6Ii9Su--NDaPr6XlgZ3JhxJIWQMm2_gpCYrmPo$ or for phone support, call 866-208-3676. 245 Market Street tƚǞĻƩ DĻƓĻƩğƷźƚƓ San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 San Francisco, CA 94177 August 1, 2022 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Round Valley Dam, NATDAM No. CA00346 Second Part 12D Inspection, Recommendation 4 Summary and Closure ENCLOSURE CONTAINS CUI//CEII DO NOT RELEASE Dear Frank L. Blackett: This letter presents a (PG&E) efforts to address Recommendation 4 from the second 5-year Part 12D safety inspection report (dated October 2020) for Round Valley Dam, which is part of PG&Es DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. The summary and conclusion is enclosed with this letter (Enclosure 1). Should you have technical questions concerning this matter, please contact Kaitlyn Daniels, dam safety engineer for PG&E, at (707) 342-7885. For general questions, please contact Jackie Pope, license coordinator for PG&E, at (530) 254-4007. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: 1. Summary and Closure of R-4 from the 2020 Part 12D Inspection (CUI//CEII DO NOT RELEASE)