From:Paulsen, Shaina
To:BOS
Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.
Date:Tuesday, August 2, 2022 9:26:31 AM
Please see Board Correspondence below.
Shaina Paulsen
Associate Clerk of The Board
Butte County Administration
25 County Center Drive, Suite 200, Oroville, CA 95965
T: 530.552.3304 | F: 530.538.7120
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Tuesday, August 2, 2022 5:55 AM
Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or
replying..
On 8/2/2022, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Pacific Gas & Electric Company (as Agent)
Docket(s): P-803-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Part 12 Consultant Safety Inspection Reports
Description: Pacific Gas and Electric Company submits Summary and Closure of Second Part 12D Inspection, Recommendation 4 for the
Round Valley Dam which is part of DeSabla-Centerville Hydroelectric Project under P-803
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20220802-
5015__;!!KNMwiTCp4spf!F6IElG_VDDNzOU7dqbn7wlMT_fL6dZQZjncL-riLNAYxfFB2uUz7tG-PA9T0Eg6Ii9Su--
NDaPr6XlgZ3JhxJIWQMm2_gkkT1RnY$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!F6IElG_VDDNzOU7dqbn7wlMT_fL6dZQZjncL-
riLNAYxfFB2uUz7tG-PA9T0Eg6Ii9Su--NDaPr6XlgZ3JhxJIWQMm2_gr6lgsSr$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!F6IElG_VDDNzOU7dqbn7wlMT_fL6dZQZjncL-
riLNAYxfFB2uUz7tG-PA9T0Eg6Ii9Su--NDaPr6XlgZ3JhxJIWQMm2_gpCYrmPo$
or for phone support, call 866-208-3676.
245 Market Street
tƚǞĻƩ DĻƓĻƩğƷźƚƓ
San Francisco, CA 94105
Mailing Address:
Mail Code N11D
P.O. Box 770000
San Francisco, CA 94177
August 1, 2022
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
San Francisco Regional Office
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA
Round Valley Dam, NATDAM No. CA00346
Second Part 12D Inspection, Recommendation 4
Summary and Closure
ENCLOSURE CONTAINS CUI//CEII DO NOT RELEASE
Dear Frank L. Blackett:
This letter presents a
(PG&E) efforts to address Recommendation 4 from the second 5-year Part 12D safety
inspection report (dated October 2020) for Round Valley Dam, which is part of PG&Es
DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory Commission
(FERC) No. 803.
The summary and conclusion is
enclosed with this letter (Enclosure 1).
Should you have technical questions concerning this matter, please contact Kaitlyn
Daniels, dam safety engineer for PG&E, at (707) 342-7885. For general questions, please
contact Jackie Pope, license coordinator for PG&E, at (530) 254-4007.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosure:
1. Summary and Closure of R-4 from the 2020 Part 12D Inspection (CUI//CEII DO NOT
RELEASE)