HomeMy WebLinkAbout8.5.22 Board Correspondence - FW_ Compliance Directives issued in FERC P-803-000 (2) From:Paulsen, Shaina To:BOS Subject:Board Correspondence - FW: Compliance Directives issued in FERC P-803-000 Date:Friday, August 5, 2022 4:02:34 PM Please see Board Correspondence below. Shaina Paulsen Associate Clerk of The Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 T: 530.552.3304 | F: 530.538.7120 -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, August 5, 2022 3:25 PM Subject: Compliance Directives issued in FERC P-803-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 8/5/2022, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Compliance Directives General Correspondence Description: Letter to Pacific Gas and Electric Company providing comments on the revised Drilling Program Plan for Philbrook Dam, part of the DeSabla-Centerville Project under P-803. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20220805-3060__;!!KNMwiTCp4spf!EYamaWX19DXE26cWBLz1n- qxO9vmMXgnQzkguNLw3c6FKO47BrSY33AGES_9NgNftooa11fj0OLuDNLBGMsX3PiWEmwwpA74edJd$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!EYamaWX19DXE26cWBLz1n- qxO9vmMXgnQzkguNLw3c6FKO47BrSY33AGES_9NgNftooa11fj0OLuDNLBGMsX3PiWEmwwpMgU8x4A$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!EYamaWX19DXE26cWBLz1n- qxO9vmMXgnQzkguNLw3c6FKO47BrSY33AGES_9NgNftooa11fj0OLuDNLBGMsX3PiWEmwwpKH7vsJb$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 (415) 369-3300 Office (415) 369-3322 Facsimile August 5, 2022 In reply refer to: Project No. 803-CA Mr. Jan Nimick, Vice President Pacific Gas and Electric Company Mail Code: N11E PO Box 770000 San Francisco, CA 94177-0001 Re: Revised Drilling Program Plan for Philbrook Dam Dear Mr. Nimick: This is in response to letters dated February 18, 2022 and May 26, 2022 from Mr. Robert Ellis that collectively submitted a revised Drilling Program Plan (DPP) for Philbrook Dam, which is part of the DeSabla-Centerville Project, FERC No. 803. submittals and have the following comments: 1. The revised DPP generally addresses our previous review comments. Subject to Comments No. 2 through 6 below, PG&E is authorized to proceed with the proposed drilling program. 2. We have remaining concerns about the drilling methods and approach being proposed in relation to the resulting quality of information that will be obtained for the intended use of the results. This was not fully addressed in the DPP and we acknowledge that this is a challenging aspect of this project. In the final report of the drilling results, please address the quality of information obtained during the drilling program and how it will be used in subsequent analyses to account for any less than favorable results. 3. The résumés for two of the proposed drillers (Paul Britton and Nick Maher) are not acceptable. Their résumés do not indicate that they possess the requisite embankment dam drilling experience needed for this project. Please provide additional information demonstrating that they meet the experience 2 requirements set forth in our drilling guidelines, or else propose different drilling personnel. Alternatively, Tom Scott can be used to perform the mud rotary drilling on this project in addition to the sonic drilling. The résumés of the proposed geologist (Zach Washburn, William Roman, Jeremy Robinson and Richard Harlan) supervising the drilling work are acceptable. If any other individuals will be used to perform or supervise the drilling work besides those listed above, please submit their résumés for our review and authorization prior to them beginning work on site. PG&E is reminded that résumés for proposed project personnel must include specific project experience which is relevant to the kind(s) of work being proposed. 4. In the emergency notification call list in Section 8.0 of the revised DPP, please replace former FERC Branch Chief John Onderdonk with current FERC Branch Chief Wes Cooley, as follows: Wes Cooley, (415) 369-3340 (Office) Branch Chief (408) 480-5024 (Cell) 5. Please keep the current FERC project engineer, Mr. Michael Vail of this office, informed on the schedule and progress of the drilling work. Additionally, PG&E is reminded that any conditions observed during the drilling which could be an indication of a potential dam safety concern must be immediately reported to the Regional Engineer. 6. submit a geotechnical investigation report summarizing the results of the drilling by April 30, 2022. While we understand that this schedule was based on the assumption that the drilling would take place in 2021 rather than in 2022, this date has now passed without any extension of time requests for this item being received by our office. Accordingly, please provide an updated plan and schedule for submitting the geotechnical investigation report. Additionally, if the drilling being completed in 2022 rather than 2021 will impact any other upcoming submittal dates such as the revised stability analysis or Supporting Technical Information Document (STID) update (due May 28, 2021 letter), then please submit an extension of time request for these items as well, along with appropriate supporting justification. Within 45 days of the date of this letter, please provide the updated plan and schedule requested in Comment No. 6 above. Comment No. 2 should be addressed in the final drilling report, thus, a formal response to this comment is not required at this time. Comments No. 3 through 5 should be addressed during the drilling, and a formal 3 response to those comments is not required unless different project personnel will be used as noted in Comment No. 3. F athttps://www.ferc.gov/ferc-online/overview. For all Dam Safety and Public Safety Documents, select Hydro: Regional Office and San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your continued efforts dam safety program. If you have questions, please contact Mr. Vail at (415) 369-3346. Sincerely, Frank L. Blackett, P.E. Regional Engineer cc: Ms. Sharon Tapia, Division Manager CA Dept. of Water Resources Division of Safety of Dams P.O. Box 942836 Sacramento, CA 94236-0001