Loading...
HomeMy WebLinkAbout7.12.22 Board Correspondence - FW_ Environmental and Recreational Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. (2) From:Paulsen, Shaina To:BOS Subject:Board Correspondence - FW: Environmental and Recreational Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Tuesday, July 12, 2022 8:25:56 AM Please see Board Correspondence below. Shaina Paulsen Associate Clerk of The Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 T: 530.552.3304 | F: 530.538.7120 -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, June 29, 2022 10:45 AM Subject: Environmental and Recreational Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 6/29/2022, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company No Organization Found (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Environmental and Recreational Compliance Report Description: Pacific Gas and Electric Company submits Fish Restocking Report for the Lower Bucks Dam Geomembrane Construction Project at the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20220629- 5076__;!!KNMwiTCp4spf!GnOtQetsKUd_FpRu51VofeR0Ho0HXkq6OgynTRL8SWvBRBsOsvbAnFyjhaFZIzdWyw01zUNsM2SbS04L2OV1lK_D7JQAfLl2ckjo$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!GnOtQetsKUd_FpRu51VofeR0Ho0HXkq6OgynTRL8SWvBRBsOsvbAnFyjhaFZIzdWyw01zUNsM2SbS04L2OV1lK_D7JQAfEkxXHsN$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!GnOtQetsKUd_FpRu51VofeR0Ho0HXkq6OgynTRL8SWvBRBsOsvbAnFyjhaFZIzdWyw01zUNsM2SbS04L2OV1lK_D7JQAfNFfHJAK$ or for phone support, call 866-208-3676. 245 Market Street tƚǞĻƩ DĻƓĻƩğƷźƚƓ San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 San Francisco, CA 94177 June 29, 2022 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA DeSabla Forebay Dam, NATDAM No. CA00343 Slope Erosion Mitigation Project Design Change Notification 1 ENCLOSURE CONTAINS CUI//CEII DO NOT RELEASE Dear Frank L. Blackett: This letter presents a design change notification (DCN) for the downstream slope erosion mitigation project at DeSabla Forebay Dam, which is part of Pacific Gas and Electric PG&E) DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. FERC authorized the project in a letter to PG&E dated May 4, 2022. During preparatory work for this project, several soil samples were collected from the embankment to verify the characteristics and test the properties of the existing embankment material. The lab test results indicate the required compaction specification for the embankment material of 95 percent relative compaction will be challenging to achieve based on the characteristics of the material. Therefore, PG&E proposes to reduce the compaction criteria for the existing embankment material as presented in the enclosed DCN (Enclosure 1). To minimize potential construction delays associated with this design change, PG&E proposes to incorporate this change into the as-built final construction drawings. Should you have technical questions concerning this matter, please contact Kaitlyn Daniels, dam safety engineer for PG&E, at (707) 342-7885. For general questions, please contact Jackie Pope, license coordinator for PG&E, at (530) 254-4007. Sincerely, Elisabeth Rossi Supervisor, Hydro License Compliance Enclosure: CUI//CEII DO NOT RELEASE: 1. Design Change Notification 1, prepared by PG&E and dated June 23, 2022