HomeMy WebLinkAboutFAI15-0052 041-130-044 CF FD 2021 9/9/21, 11-:43'AM Mail-Tavelli,Patrick-Outlook
<Ej Reply all ® Delete Junk Block •••
Fw: Overhead door operational testing
What do you think? Will this work?
Pat Tavelli
Butte College Maintenance Dept.
3536 Campus Drive, Oroville Ca.
530-895-2381 office
530-353-0331 cell
From: Hansbrough, Mike<hansbroughmi@butte.edu>
Sent:Thursday, September 9, 2021 11:19 AM
To:Tavelli, Patrick<tavellipa@butte.edu>
Subject: Overhead door operational testing
Mike tested the following roll-up doors on BC main campus.
� l
SAS-Financial Aid C
SAS-Admissions and Records C{�
SAS-Welcome Center Il
ARTS-Main Lobby north side of building
ARTS Back Hall southwest corner of building
ARTS Black Box Theater
ARTS Scene Shop
ARTS Concessions northwest corner of building
LRC Lobby @ stairs 1st 2nd and 3rd floors
Mike Hansbrough
Electrician
Butte-Glenn Community College District
Oroville, Ca.
Office Ph (530)895-2526
Personal Cell (530)570-3872
Fax(530)895-2823
hansbroughmi@butte.edu
Reply Forward
0
httos://outlook.office.com/mail/deeolink?0000utv2=1&version=20210829002.04 1/1
Page 1
Printed 09/09/21 Work Order 123465
WO No: 123465 Assigned To: ELEC Project:
Type: PMI Planned Date: 08/31/20
Status: RC Planned By: PM SCHEDULER PM#: 1307
Priority: Submitted By: PM SCHEDULER Safety Doc#: None
Date Due: 08/31/20 Submitted Date: 09/30/20 Standard Doc#: None
Building: 025 (Learning Resource Center)
Issue To: 3080475 (Hansbrough,Mike)
Equipment
Equipment Description Location
OHD01 LRC Overhead Fire Door#1,LRC LRC 1st Floor Hall
OHD02LRC Overhead Fire Door#2, LRC LRC 2nd Floor Hall
OHDO3LRC Overhead Fire Door#3, LRC LRC 3rd Floor Hall
Problem Description
Door#1 Door operated as it should. No problem. \
Door#2 Door operated as it should. No problem. /
/`1/2
Door#3 Door operated as it should. No problem.
Material and Labor Requirements
Equipment Part Number Description Quantity
Equipment Trade Function People Hrs
Notes
Completed By: Completion Date:
Page 1
' Printed 09/09/21 Work Order 123464
WO No: 123464 Assigned To: ELEC Project:
Type: PM! Planned Date: 08/31/20
Status: RC Planned By: PM SCHEDULER PM#: 1306
Priority: Submitted By: PM SCHEDULER Safety Doc#: None
Date Due: 08/31/20 Submitted Date: 09/30/20 Standard Doc#: None
Building: 004 (Student&Administrative Services)
Issue To: 3080475 (Hansbrough,Mike)
Equipment
Equipment Description Location
OHDO1SAS Overhead Fire Doors#1,SAS SAS168 Welcome Center
OHDO2SAS Overhead Fire Door#2,SAS SAS160 Financial Aid
OHDO3SAS Overhead Fire Door#3,SAS SAS179 Admissions and
Records
Problem Description
Door#1 cycled-no issues. G
Door#2 Door operated without issues. I/%/2. (
Door#3 cycled-no issues.
Material and Labor Requirements
Eauipment Part Number Description Quantity
Equipment Trade Function People Hrs
Notes
Completed By: Completion Date:
Page 1
Printed 09/09/21 Work Order 123463
WO No: 123463 Assigned To: ELEC Project:
Type: PMI Planned Date: 08/31/20
Status: RC Planned By: PM SCHEDULER PM#: 1305
Priority: 4 Submitted By: PM SCHEDULER Safety Doc#: None
Date Due: 09/30/20 Submitted Date: 09/30/20 Standard Doc#: None
Building: 032 (Arts)
Issue To: 3080475 (Hansbrough,Mike)
Equipment
Eauigment Description Location
OHD01ARTS Overhead Fire Door#1,Arts Arts 166 Scene Shop,West Wall
OHD02ARTS Overhead Fire Door#2,ARTS Arts 166 Scene Shop,North Wall
OHDO3ARTS Overhead Fire Door#3,Arts Arts SW Hall,Adjacent to
160/184
OHD04ARTS Overhead Fire Door#4,Arts Arts North Main Entrance,Above
Doorway Leading to
Theatre/Gallery
Problem Description
Test Fire doors and roll down fire doors.
Door#1 door operated, no issues. Cj/��/L I
Door#2 cycled-no issues. I
Door#3 Door cycles,no issues
Door#4 cycled-no issues.
Material and Labor Requirements
Eauigment Part Number Description Quantity
Eauigment Trade Function People Hrs
Notes
Completed By: Completion Date: