Loading...
HomeMy WebLinkAboutFAI15-0052 041-130-044 CF FD 2021 9/9/21, 11-:43'AM Mail-Tavelli,Patrick-Outlook <Ej Reply all ® Delete Junk Block ••• Fw: Overhead door operational testing What do you think? Will this work? Pat Tavelli Butte College Maintenance Dept. 3536 Campus Drive, Oroville Ca. 530-895-2381 office 530-353-0331 cell From: Hansbrough, Mike<hansbroughmi@butte.edu> Sent:Thursday, September 9, 2021 11:19 AM To:Tavelli, Patrick<tavellipa@butte.edu> Subject: Overhead door operational testing Mike tested the following roll-up doors on BC main campus. � l SAS-Financial Aid C SAS-Admissions and Records C{� SAS-Welcome Center Il ARTS-Main Lobby north side of building ARTS Back Hall southwest corner of building ARTS Black Box Theater ARTS Scene Shop ARTS Concessions northwest corner of building LRC Lobby @ stairs 1st 2nd and 3rd floors Mike Hansbrough Electrician Butte-Glenn Community College District Oroville, Ca. Office Ph (530)895-2526 Personal Cell (530)570-3872 Fax(530)895-2823 hansbroughmi@butte.edu Reply Forward 0 httos://outlook.office.com/mail/deeolink?0000utv2=1&version=20210829002.04 1/1 Page 1 Printed 09/09/21 Work Order 123465 WO No: 123465 Assigned To: ELEC Project: Type: PMI Planned Date: 08/31/20 Status: RC Planned By: PM SCHEDULER PM#: 1307 Priority: Submitted By: PM SCHEDULER Safety Doc#: None Date Due: 08/31/20 Submitted Date: 09/30/20 Standard Doc#: None Building: 025 (Learning Resource Center) Issue To: 3080475 (Hansbrough,Mike) Equipment Equipment Description Location OHD01 LRC Overhead Fire Door#1,LRC LRC 1st Floor Hall OHD02LRC Overhead Fire Door#2, LRC LRC 2nd Floor Hall OHDO3LRC Overhead Fire Door#3, LRC LRC 3rd Floor Hall Problem Description Door#1 Door operated as it should. No problem. \ Door#2 Door operated as it should. No problem. / /`1/2 Door#3 Door operated as it should. No problem. Material and Labor Requirements Equipment Part Number Description Quantity Equipment Trade Function People Hrs Notes Completed By: Completion Date: Page 1 ' Printed 09/09/21 Work Order 123464 WO No: 123464 Assigned To: ELEC Project: Type: PM! Planned Date: 08/31/20 Status: RC Planned By: PM SCHEDULER PM#: 1306 Priority: Submitted By: PM SCHEDULER Safety Doc#: None Date Due: 08/31/20 Submitted Date: 09/30/20 Standard Doc#: None Building: 004 (Student&Administrative Services) Issue To: 3080475 (Hansbrough,Mike) Equipment Equipment Description Location OHDO1SAS Overhead Fire Doors#1,SAS SAS168 Welcome Center OHDO2SAS Overhead Fire Door#2,SAS SAS160 Financial Aid OHDO3SAS Overhead Fire Door#3,SAS SAS179 Admissions and Records Problem Description Door#1 cycled-no issues. G Door#2 Door operated without issues. I/%/2. ( Door#3 cycled-no issues. Material and Labor Requirements Eauipment Part Number Description Quantity Equipment Trade Function People Hrs Notes Completed By: Completion Date: Page 1 Printed 09/09/21 Work Order 123463 WO No: 123463 Assigned To: ELEC Project: Type: PMI Planned Date: 08/31/20 Status: RC Planned By: PM SCHEDULER PM#: 1305 Priority: 4 Submitted By: PM SCHEDULER Safety Doc#: None Date Due: 09/30/20 Submitted Date: 09/30/20 Standard Doc#: None Building: 032 (Arts) Issue To: 3080475 (Hansbrough,Mike) Equipment Eauigment Description Location OHD01ARTS Overhead Fire Door#1,Arts Arts 166 Scene Shop,West Wall OHD02ARTS Overhead Fire Door#2,ARTS Arts 166 Scene Shop,North Wall OHDO3ARTS Overhead Fire Door#3,Arts Arts SW Hall,Adjacent to 160/184 OHD04ARTS Overhead Fire Door#4,Arts Arts North Main Entrance,Above Doorway Leading to Theatre/Gallery Problem Description Test Fire doors and roll down fire doors. Door#1 door operated, no issues. Cj/��/L I Door#2 cycled-no issues. I Door#3 Door cycles,no issues Door#4 cycled-no issues. Material and Labor Requirements Eauigment Part Number Description Quantity Eauigment Trade Function People Hrs Notes Completed By: Completion Date: