Loading...
HomeMy WebLinkAboutCSA-0004 047-640-018 CF Pump 7.2022 SDuurh m Pump&Irrigation WM.P.WILSON&SONS Invoice CL#271327 Number: 0207478-IN Main Office: Woodland Branch: Durham Pump,Inc. Wm.P.Wilson&Sons Date: 7/26/2022 2313 Durham-Dayton Hwy,Durham,CA 95938 202 Kentucky Ave,Woodland,CA 95695 530.891.4821 530-891.0613 Fax 530.662.8654 530.662.5797 Fax Page: 1 Order/Date: 0059573 7/20/2022 Please Remit All Payments to: Durham Pump,PO Box 60,Durham,CA 95938 Thank you! ICustomer#: 01-0005315 Salesperson: JOHN RHEIN Sold To: BUTTE COUNTY FIRE DEPT-MAIN Ship To: CSA#128-WILDFLOWER EST. 7 COUNTY CENTER DR HERFORD DR ATTN:MARGE CHICO,CA 95973 OROVILLE,CA 95965 Confirm To: JOHN GADDIE Job Name: CSA#128 Wildflower Estates Customer P.O. Ship VIA: F.O.B. Terms: NET 10TH • Item Code Description Unit WH Qty Ordered / Shipped / B.O. Price Amount 7/6/2022 COMPLETE BIANNUAL SERVICE AND MAINTENANCE CHECKS.REPORTS ENCLOSED. IPMAINT PUMP SERVICE CONTRACT LABOR 0.00 200.00 CS Pr- aaa y O /7-GYn-of g SPECIAL ORDER ITEMS: Special Orders(items not normally stocked)are non-returnable unless they can Taxable Amount: 0.00 be resold to others or are accepted for return by our vendor.Them will be a minimum restock fee of Non-Taxable Amount: 200.00 15%of the item value,or amount charged by vendor,whichever is higher,plus any applicable freight incurred.All special sale/close-out item sales are final,no returns.Thank you Net Invoice: 200.00 Less Discount: 0.00 Sales Tax: 0.00 Signature N/q Invoice Total: 200.00 Less Deposit: 0.00 Invoice Balance: 200.00 Durham ' '. Pimp PUMP CHECK REPORT 2313 Durham-Dayton Hwy. Durham, CA 95938 530.891 .4821 CSA #128 - Wildflower Estates CUSTOMER NAME: Butte County Fire Dept. DATE: 7/6/2022 Motor Mfg: Sta-Rite HP: 1 Meter #: 14R432 RPM 3450 Volts 240 Phase 3 Rated Amps: TM 80 Yes No Serial # PG &E Acct. # Other: Panel Mfg: NEMA Size: Type: X/L P/W Other: Date Code: 10/90 Pump Mfg: Sta-Rite Serial#: Non-Running Checks: Pump Model Type na Lubricant Levels - Service and Change if Necessary na Oiler Unit and/or Packing Electrical Leads & Connections - Repair and Tighten as Necessary Incoming Idle Voltage: W/I Acceptable Limits Unacceptable na Fuses - Replace if Necessary Replaced Size: 20 Amp Breaker Perform General Clean-Up of Electrical Panel and Motor Running Checks: Motor winding resistance: Excessive or Unusual Noise ° Ok/see comments Pressure tank: Air-E-Tainer AT-266 Excessive or Unusual Vibration _" Ok/see comments Tank condition: Good Control Devices: H.O.A. Start Switch Time Clock Frost Start Time Delay Other: PRESS. SWITCH Amperage: Expected: 9.8 Pressure setting: Actual: B 9 Y 9.1 R 0 Average: 8.25 Overload Underload Even Load Bowl Adjustment: N/A Yes No Comments: GPS: The above readings reflect the site and pump conditions at the time of inspection. This report does not guarantee the continuation of these conditions, nor warranty any part of the existing system. S:\Pump Dept. Files\PUMP TESTS & INSPECTIONS\Cal Fire CSA's1128 Wildflower Est1128 Reports Durham y'. now PUMP CHECK REPORT 2313 Durham-Dayton Hwy. Durham, CA 95938 530.891.4821 CSA#128 -Wildflower Estates CUSTOMER NAME: Butte County Fire Dept. DATE: 7/6/2022 • Motor Mfg: Franklin HP: 25 Meter#: 1006873268 RPM 3450 Volts 240 Phase 3 Rated Amps: 60 TM 80 Yes No Serial# N/A PG &E Acct. # Other: Panel Mfg: Furnas NEMA Size: 3 Type: X X/L P/W Other: Pump Mfg: 25 HP Sub Serial#: Non-Running Checks: Pump Model Manufacturer Franklin na Lubricant Levels -Service and Change if Necessary Discharge na Oiler Unit and/or Packing Electrical Leads &Connections - Repair and Tighten as Necessary • Incoming Idle Voltage: W/I Acceptable Limits Unacceptable • Fuses - Replace if Necessary Replaced Size: 100 Amp • Perform General Clean-Up of Electrical Panel and Motor Running Checks: Motor winding resistance: U's to ground Excessive or Unusual Noise Ok/see comments Pressure tank: OK Excessive or Unusual Vibration Ok/see comments Tank condition: Good Control Devices: H.O.A. Start Switch Time Clock Frost Start Time Delay Other: Amperage: Expected: 67 Pressure setting: PRESS SWITCH Actual: L 1 65.8 L2 75.2 L3 68.8 Average: 69.93 Overload I I Underload I v' Even Load Bowl Adiustment: N/A Yes No Comments: GPS: The above readings reflect the site and pump conditions at the time of inspection. This report does not guarantee the continuation of these conditions, nor warranty any part of the existing system. S:\Pump Dept. Files\PUMP TESTS&INSPECTIONS\Cal Fire CSA's\128 Wildflower Est\128 Reports