Loading...
HomeMy WebLinkAboutCSA-0010 047-680-021 CF Pump 7.2022 Durham Pump&Irrigation WM.P.WILSON&SONS Invoice www.durhampump.com CL#271327 Number: 0207483-IN Main Office: Woodland Branch: Durham Pump,Inc. Wm. P.Wilson&Sons Date: 7/26/2022 2313 Durham-Dayton Hwy,Durham,CA 95938 202 Kentucky Ave,Woodland,CA 95695 530.891.4821 530-891.0613 Fax 530.662.8654 530.662.5797 Fax Page: 1 Order/Date: 0059578 7/20/2022 Please Remit All Payments to: Durham Pump, PO Box 60,Durham, CA 95938 Thank you! Customer#: 01-0005315 Salesperson: JOHN RHEIN Sold To: BUTTE COUNTY FIRE DEPT-MAIN Ship To: CSA#172-AUTUMN PARK 7 COUNTY CENTER DR. OFF GARNER LANE ATTN: MARGE CHICO,CA 95973 OROVILLE,CA 95965 Confirm To: JOHN GADDIE Job Name: CSA#172 Autumn Park Customer P.O. Ship VIA: F.O.B. Terms: NET 10TH Item Code Description Unit WH Qty Ordered / Shipped / B.O. Price Amount 7/7/2022 COMPLETE BI-ANNUAL SERVICE AND MAINTENANCE CHECKS.REPORTS ENCLOSED. /PMAINT PUMP SERVICE CONTRACT LABOR 0.00 200.00 654 -06/ 0 4%°—"ZI Gy�� SPECIAL ORDER ITEMS: Special Orders(items not normally stocked)are non-returnable unless they can Taxable Amount: 0.00 be resold to others or are accepted for return by our vendor.There will be a minimum restock fee of Non-Taxable Amount: 200.00 15%of the item value,or amount charged by vendor,whichever is higher,plus any applicable freight incurred. All special sale/close-out item sales are final,no returns. Thank you. Net Invoice: 200.00 Less Discount: 0.00 Sales Tax: 0.00 Signature N /A Invoice Total: 200.00 Less Deposit: 0.00 Invoice Balance: 200.00 Di// n �''. Pow PUMP CHECK REPORT 2313 Durham-Dayton Hwy. Durham, CA 95938 530.891.4821 CSA#172 Autumn Park Subdivision CUSTOMER NAME: Butte County Fire Dept. DATE: 7/7/22 Motor Mfg: Franklin HP: 2 Meter#: RPM Volts 240 Phase 1 Rated Amps: TM 80 Yes No Serial# PG &E Acct. # Other: Panel Mfg: Franklin control box NEMA Size: Type: << X/L P/W Other: Pump Mfg: Serial#: Non-Running Checks: Pump Model Manufacturer na Lubricant Levels - Service and Change if Necessary na Oiler Unit and/or Packing Electrical Leads & Connections - Repair and Tighten as Necessary Incoming Idle Voltage: W/I Acceptable Limits Unacceptable ✓ Fuses- Replace if Necessary Replaced Size: 15 amp Perform General Clean-Up of Electrical Panel and Motor Running Checks: Motor winding resistance: Excessive or Unusual Noise / Ok • Excessive or Unusual Vibration Ok • Control Devices: X H.O.A. Start Switch Time Clock n Frost Start Time Delay Other: Press. Sw. 40-60 Amperage: Expected: 9.8 Actual:Red: 2.6 Yellow: 11.3 Black: 11.3 Average: 8.4 Overload Underload -' Even Load Bowl Adjustment: N/A Yes No Comments: GPS: 39°48'7.51"N 121°53'40.31"W The above readings reflect the site and pump conditions at the time of inspection. This report does not guarantee the continuation of these conditions,nor warranty any part of the existing system. S:\Pump Dept. Files\PUMP TESTS&INSPECTIONS\Cal Fire CSA's\172 Autumn Park\172 Reports . Aim PUMP CHECK REPORT 2313 Durham-Dayton Hwy. Durham, CA 95938 530.891.4821 CSA#172 Autumn Park Subdivision CUSTOMER NAME: Butte County Fire Dept. DATE: 7/7/22 Motor Mfg: Franklin HP: 25 Meter#: X11162 RPM 3450 Volts 460 Phase 3 Rated Amps: 75max TM 801-7Yes nNo Serial# PG &E Acct. # Other: Panel Mfg: Furnas NEMA Size: 3 Type: X/L n P/W Other: Discharge Mfg: Fabricated steel 6" Serial#: Non-Running Checks: Pump Model Manufacturer na Lubricant Levels - Service and Change if Necessary na Oiler Unit and/or Packing - Electrical Leads & Connections- Repair and Tighten as Necessary Incoming Idle Voltage: nW/I Acceptable Limits Unacceptable Fuses- Replace if Necessary Replaced Size: 100 amp MCP Perform General Clean-Up of Electrical Panel and Motor Running Checks: Motor winding resistance: 1.2 Megs to ground Excessive or Unusual Noise nOk Excessive or Unusual Vibration Ok (Control Devices: X H.O.A. X Start Switch Time Clock Frost Start nTime Delay Other: Pres. Sw. Amperage: Expected: 75.0 max Actual: L1: 75 L2: 74.5 L3: 75.6 Average: 75.03 Overload Underload Even Load Bowl Adjustment: N/A Yes nNo Comments: Idle voltage back down to around 485-487V Gate broken. Fence broken, hard to open. Lock changed, but left unlocked GPS: 39°48'7.51"N 121°53'40.31"W The above readings reflect the site and pump conditions at the time of inspection. This report does not guarantee the continuation of these conditions,nor warranty any part of the existing system. S:\Pump Dept. Files\PUMP TESTS&INSPECTIONS\Cal Fire CSA's\172 Autumn Park\172 Reports