HomeMy WebLinkAbout8.26.22 Board Correspondence - FW_ Colusa Subbasin Projects and Management Action Submittal Form now open.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening
attachments, clicking on links, or replying..
From:Paulsen, Shaina
To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Hironimus, Patrizia; Kimmelshue,
Tod; Lucero, Debra; Paulsen, Shaina; Pickett, Andy; Reaster, Kayla; Ritter, Tami; Stephens, Brad J.; Sweeney,
Kathleen; Teeter, Doug; Valencia, Shyanne
Cc:Loeser, Kamie; Hatcher, Casey
Subject:Board Correspondence - FW: Colusa Subbasin Projects and Management Action Submittal Form now open
Date:Friday, August 26, 2022 10:34:32 AM
Attachments:22.08.23 PMA Submittal Form for Colusa Subbasin FINAL.pdf
22.08.23 PMA Submittal Form for Colusa Subbasin FINAL.docx
Please see Board Correspondence below.
Shaina Paulsen
Associate Clerk of The Board
Butte County Administration
25 County Center Drive, Suite 200, Oroville, CA 95965
T: 530.552.3304 | F: 530.538.7120
From: Lisa Hunter <LHunter@countyofglenn.net>
Sent: Friday, August 26, 2022 9:41 AM
Subject: Colusa Subbasin Projects and Management Action Submittal Form now open
The Colusa Subbasin Groundwater Sustainability Agencies have re-opened the Colusa Subbasin
Projects and Management Actions Submittal form. The purpose of this form is to gather ideas for
potential projects and management actions (PMAs) that could be evaluated and possibly be included
in the Colusa Subbasin GSP. The initial Colusa Subbasin GSP was submitted in January 2022 and
contains PMAs that were submitted during the GSP development process. Now that the GSP has
been submitted and we are looking toward implementation, the GSAs have re-opened the PMA
Submittal Form to collect additional suggestions and ideas to help the Colusa Subbasin reach and
maintain sustainability. It is important to recognize the GSP is a living document and must be
adaptive.
Potential PMAs may fall under several categories, including but not limited to the following:
Recharge projects
Supply augmentation projects
Water conservation projects
Projects to reduce non-beneficial consumptive use
Groundwater pumping allocations
Monitoring programs (groundwater pumping, water levels, stream flows, etc.)
Please note: the online submittal is the preferred option; however, printed or emailed submissions
may also be submitted.
For more information and access to the submittal form (also attached), please visit
https://www.countyofglenn.net/resources/groundwater-authority-groundwater-authority-technical-
advisory-committee-groundwater-0
Sincerely,
Lisa Hunter
Water Resource Coordinator, Glenn County
Program Manager, Glenn Groundwater Authority
(530) 934-6540 (office)
COLUSA SUBBASIN
1 8/25/2022
Colusa Subbasin GSP Projects and Management Actions (PMAs) Submittal Form
Overview
The purpose of this form is to gather ideas for potential projects and management actions
(PMAs) that could be evaluated and possibly be included in the Colusa Subbasin GSP. The initial
Colusa Subbasin GSP was submitted in January 2022 and contains PMAs that were submitted
during the GSP development process. Now that the GSP has been submitted and we are looking
toward implementation, the GSAs have re-opened the PMA Submittal Form to collect
additional suggestions and ideas to help the Colusa Subbasin reach and maintain sustainability.
It is important to recognize the GSP is a livin g document and must be adaptive.
Potential PMAs may fall under several categories, including but not limited to the following:
• Recharge projects
• Supply augmentation projects
• Water conservation projects
• Projects to reduce non-beneficial
consumptive use
• Groundwater pumping allocations
• Monitoring programs (groundwater
pumping, water levels, stream flows,
etc.)
Please provide supporting documentation and/or links to that documentation for each
question, if available. NOTE: It is recognized that much of the requested information may not
be available at this time. Please provide as much information as you can.
An online version of this form can be accessed at https://arcg.is/eWTbn or use the QR code
below. This is the preferred submittal method.
Submit completed forms to LHunter@countyofglenn.net.
Project Name and Contact
Project or Management Action Name:
Contact Person:
Organization/Affiliation (Project Proponent):
Contact Phone:
Contact Email:
COLUSA SUBBASIN
2 8/25/2022
Project or Management Action Description and Status
Project or Management Action Description:
Project or Management Action Location (please provide a map if available):
Which Sustainability Indicator(s) does this Project or Management Action address:
1. Groundwater levels
2. Groundwater Storage
3. Groundwater Quality
4. Land Subsidence
5. Surface Water Interaction
Project or Management Action Status (Conceptual, In Design, Ready for Implementation):
Has a feasibility assessment been conducted? If so, please list the agency and provide the
documentation (or provide web link to download).
Estimated Cost:
Potential Funding Sources:
Management Action or Project Yield (e.g. water contributed to the groundwater system, acre-
feet per year):
Please describe any required Permitting and Regulatory Process and status of permitting and
CEQA/NEPA compliance:
Does this Management Action or Project serve a disadvantaged community? If so, which
one(s)?
Additional Information Sources:
Other Information:
COLUSA SUBBASIN
1 8/25/2022
Colusa Subbasin GSP Projects and Management Actions (PMAs) Submittal Form
Overview
The purpose of this form is to gather ideas for potential projects and management actions
(PMAs) that could be evaluated and possibly be included in the Colusa Subbasin GSP. The initial
Colusa Subbasin GSP was submitted in January 2022 and contains PMAs that were submitted
during the GSP development process. Now that the GSP has been submitted and we are looking
toward implementation, the GSAs have re-opened the PMA Submittal Form to collect
additional suggestions and ideas to help the Colusa Subbasin reach and maintain sustainability.
It is important to recognize the GSP is a living document and must be adaptive.
Potential PMAs may fall under several categories, including but not limited to the following:
• Recharge projects
• Supply augmentation projects
• Water conservation projects
• Projects to reduce non-beneficial
consumptive use
• Groundwater pumping allocations
• Monitoring programs (groundwater
pumping, water levels, stream flows,
etc.)
Please provide supporting documentation and/or links to that documentation for each
question, if available. NOTE: It is recognized that much of the requested information may not
be available at this time. Please provide as much information as you can.
An online version of this form can be accessed at https://arcg.is/eWTbn or use the QR code
below. This is the preferred submittal method.
Submit completed forms to LHunter@countyofglenn.net.
Project Name and Contact
Project or Management Action Name:
Contact Person:
Organization/Affiliation (Project Proponent):
Contact Phone:
Contact Email:
COLUSA SUBBASIN
2 8/25/2022
Project or Management Action Description and Status
Project or Management Action Description:
Project or Management Action Location (please provide a map if available):
Which Sustainability Indicator(s) does this Project or Management Action address:
1. Groundwater levels
2. Groundwater Storage
3. Groundwater Quality
4. Land Subsidence
5. Surface Water Interaction
Project or Management Action Status (Conceptual, In Design, Ready for Implementation):
Has a feasibility assessment been conducted? If so, please list the agency and provide the
documentation (or provide web link to download).
Estimated Cost:
Potential Funding Sources:
Management Action or Project Yield (e.g. water contributed to the groundwater system, acre-
feet per year):
Please describe any required Permitting and Regulatory Process and status of permitting and
CEQA/NEPA compliance:
Does this Management Action or Project serve a disadvantaged community? If so, which
one(s)?
Additional Information Sources:
Other Information: