Loading...
HomeMy WebLinkAbout5.27.22 Board Correspondence - FW_ Supplemental_Additional Information submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. (2) From:Paulsen, Shaina To:BOS Subject:Board Correspondence - FW: Supplemental/Additional Information submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. Date:Friday, May 27, 2022 8:26:51 AM Please see Board Correspondence below. Shaina Paulsen Associate Clerk of The Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 T: 530.552.3304 | F: 530.538.7120 -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, May 27, 2022 7:25 AM Subject: Supplemental/Additional Information submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 5/27/2022, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Supplemental/Additional Information Description: Pacific Gas and Electric Company submits Revised Drilling Program Plan and Drilling Personnel Resumes for Philbrook Dam for the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20220527- 5044__;!!KNMwiTCp4spf!EGQ_3Fo-1zpTfbaVwjZG-Hp8Z0-JOUmaAMr53GYFWXhC-3dwWmlxdqEFYp- pbAzSS_DGKDFSYii1bjIHCVJkwV9A7_QTRHwDA47l$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!EGQ_3Fo- 1zpTfbaVwjZG-Hp8Z0-JOUmaAMr53GYFWXhC-3dwWmlxdqEFYp- pbAzSS_DGKDFSYii1bjIHCVJkwV9A7_QTRNpjG7iH$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!EGQ_3Fo-1zpTfbaVwjZG- Hp8Z0-JOUmaAMr53GYFWXhC-3dwWmlxdqEFYp-pbAzSS_DGKDFSYii1bjIHCVJkwV9A7_QTRPzLMvsZ$ or for phone support, call 866-208-3676. 245 Market Street tƚǞĻƩ DĻƓĻƩğƷźƚƓ San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 San Francisco, CA 94177 May 26, 2022 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Philbrook Dam, NATDAM No. CA00345 Supplemental Response to FERC Comments Revised Drilling Program Plan ENCLOSURE CONTAINS CUI//CEII DO NOT RELEASE Dear Frank L. Blackett: This letter presents additional information to supplement our revised drilling program plan (DPP) for Philbrook Dam, which is part of DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803. PG&E filed our most-recent revised DPP with FERC on February 18, 2022. Revised Tables 4-1 and 6-1 are included with this filing as Enclosure 1 and are intended to supersede Table 4-1 and Table 6-1 of the DPP filed on February 18, 2022. Additionally, updated resumes for drilling personnel are included with this filing as Enclosure 2. Tom Scott with Geo-Ex will perform the responsibilities of lead driller on-site and will perform all sonic drilling work. Resumes for supplemental drilling personnel, Paul Britton and Nick Maher, are also included with this filing. These individuals will support drilling operations if sonic drilling and mud rotary drilling need to be performed concurrently. In this case, Tom Scott will perform sonic drilling while either Paul Britton or Nick Maher performs mud rotary borings. In response to the COVID-19 pandemic, nonessential PG&E staff continue to work remotely, and hard copy filings are not practical at this time. If FERC requires hard copies of this letter and enclosures, please contact the license coordinator identified below. If necessary, hard copies will be sent after PG&E staff return to their normal work locations. Frank L. Blackett, P.E., Regional Engineer May 26, 2022 Page 2 Should you have technical questions concerning this matter, please contact Kaitlyn Daniels, dam safety engineer for PG&E, at (707) 342-7885. For general questions, please contact Jackie Pope, license coordinator for PG&E, at (530) 254-4007. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosures: 1. Revised Tables 4-1 and 6-1 from the Philbrook Dam Drilling Program Plan, prepared by Gannett Fleming for PG&E (CUI//CEII DO NOT RELEASE) 2. Drilling Personnel Resumes cc: With Enclosures Sharon Tapia, Chief Department of Water Resources Division of Safety of Dams 2720 Gateway Oaks Drive, Suite 300 Sacramento, CA 95833 Enclosure