From:Paulsen, Shaina
To:BOS
Subject:Board Correspondence - FW: EAP Testing Report submitted in FERC P-619-000,et al. by Pacific Gas and Electric Company,et al.
Date:Monday, May 23, 2022 3:53:28 PM
Please see Board Correspondence below.
Shaina Paulsen
Associate Clerk of The Board
Butte County Administration
25 County Center Drive, Suite 200, Oroville, CA 95965
T: 530.552.3304 | F: 530.538.7120
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Monday, May 23, 2022 3:45 PM
Subject: EAP Testing Report submitted in FERC P-619-000,et al. by Pacific Gas and Electric Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 5/23/2022, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Pacific Gas and Electric Company (as Agent)
Docket(s): P-619-000
P-803-000
P-1962-001
P-2105-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: EAP Testing Report
Description: Pacific Gas and Electric Company submits Emergency Action Plan Functional and Tabletop Exercises Report at the Feather River Watershed for the Bucks Creek Hydroelectric
Project et. al. under P-619
et. al.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20220523-
5197__;!!KNMwiTCp4spf!FsbJ8W4yZwnjyXAQYWSupTArcXvMwkKKAVhnuzCxOpEqrMYXEspmVVHBBkWcgqCrG157__LBFRwc1fZ5rZdb-g7SqPh6SE_3b4-P$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!FsbJ8W4yZwnjyXAQYWSupTArcXvMwkKKAVhnuzCxOpEqrMYXEspmVVHBBkWcgqCrG157__LBFRwc1fZ5rZdb-
g7SqPh6SI78_35s$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!FsbJ8W4yZwnjyXAQYWSupTArcXvMwkKKAVhnuzCxOpEqrMYXEspmVVHBBkWcgqCrG157__LBFRwc1fZ5rZdb-
g7SqPh6SO-DlUEz$
or for phone support, call 866-208-3676.
245 Market Street
tƚǞĻƩ DĻƓĻƩğƷźƚƓ
San Francisco, CA 94105
Mailing Address:
Mail Code N11D
P.O. Box 770000
San Francisco, CA 94177
May 23, 2022
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E.
Regional Engineer
Federal Energy Regulatory Commission
San Francisco Regional Office
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: Feather River Watershed (FERC Project Nos. 619, 803, 1962, 2105)
2022 EAP Tabletop Exercise 60-Day Evaluation Report
ENCLOSURES CONTAIN CUI//CEII DO NOT RELEASE
Dear Frank L. Blackett:
The purpose of this letter is to submit the 60-Day Emergency Action Plans (EAP)
Tabletop Exercise Evaluation Report for the March 24, 2022, Tabletop Exercise for the
Pacific Gas and Electric (PG&E) EAP dams within the Feather River Watershed,
applicable to the projects listed below containing the EAP dams listed in enclosure 1:
Bucks Creek Hydroelectric Project, FERC No. 619-CA
DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA
Rock Creek-Cresta Hydroelectric Project, FERC No. 1962-CA
Upper North Fork Feather River Hydroelectric Project, FERC No. 2105-CA
The exercise evaluation report is provided in Enclosures 2-3, wherein we have included
all comments and recommendations that we received from participants during the
exercise. The report was prepared on behalf of PG&E by a consultant and PG&E
concurs with the content of the report. This report was completed in compliance with
6-
4.2.3.H: Tabletop Exercise: Reporting Requirements.
Frank L. Blackett, P.E., Regional Engineer
May 23, 2022
Page 2
If you have any questions, please contact me at (530)-616-1079 or awh9@pge.com .
Sincerely,
Andrew Hagen
EAP Coordinator
Principal, Public Safety Specialist
Enclosures:
1. Dams included in the EAP Tabletop Exercise
2. EAP Evaluation Report Part 1 of 2 (CUI // CEII DO NOT RELEASE)
3. EAP Evaluation Report Part 2 of 2 (CUI // CEII DO NOT RELEASE)
EAP Dams Included in Tabletop Exercise Enclosure 1
FERC Project No. Dam Name NATDAM No.
619 Bucks Diversion Dam CA00331
619 Bucks Lake (Storage) Dam CA00332
619 Grizzly Forebay Dam CA00333
619 Three Lakes Dam CA00334
803 Philbrook Dam CA00345
803 Round Valley Dam CA00346
1962
Rock Creek Dam CA00330
1962
Cresta Dam CA00329
2105 Butt Valley Dam CA00326
2105 Lake Almanor Dam CA00327
2105 Belden Forebay Dam CA00413