Loading...
HomeMy WebLinkAbout5.2.22 Board Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. (2) From:Paulsen, Shaina To:BOS Subject:Board Correspondence - FW: Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. Date:Monday, May 2, 2022 8:18:23 AM Please see Board Correspondence below. Shaina Paulsen Associate Clerk of The Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 T: 530.552.3304 | F: 530.538.7120 -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Sunday, May 1, 2022 10:45 AM Subject: Project Operations Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 4/29/2022, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Description: Pacific Gas and Electric Company submits Construction Schedule re Reservoir Remote Monitoring Installation in Response to Comments in FERC April 21, 2022 for Round Valley Dam for DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20220429-5586__;!!KNMwiTCp4spf!GnuhXvFoipatbNHSlAfdeMrNrIRj- nMTg4i0Taguu29axuq_ODHY8NIY71aKfNyKHCpWKjv4RififVk6Mt2Ps-6CEeiJQ2QZE5u2$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!GnuhXvFoipatbNHSlAfdeMrNrIRj- nMTg4i0Taguu29axuq_ODHY8NIY71aKfNyKHCpWKjv4RififVk6Mt2Ps-6CEeiJQ4p5ewmw$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!GnuhXvFoipatbNHSlAfdeMrNrIRj- nMTg4i0Taguu29axuq_ODHY8NIY71aKfNyKHCpWKjv4RififVk6Mt2Ps-6CEeiJQ8BxaEwD$ or for phone support, call 866-208-3676. tƚǞĻƩ DĻƓĻƩğƷźƚƓ 245 Market Street San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 San Francisco, CA 94177 April 29, 2022 Via Electronic Submittal (E-file) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Round Valley Dam, NATDAM No. CA00346 Reservoir Remote Monitoring Installation Comment Responses Dear Frank L. Blackett: This ) responses to Federal Energy Regulatory Commission (FERC) comments regarding the submittal package for installation of remote monitoring equipment at Round Valley Reservoir, which is part of DeSabla-Centerville Hydroelectric Project, FERC No. 803. PG&E received and conditional authorization to proceed with construction in a letter dated April 21, 2022. this letter (Enclosure 1). has been adequately addressed and no further action is necessary. Should you have s dam safety engineer, Kaitlyn Daniels, at (707) 342- coordinator, Jackie Pope, at (530) 254-4007. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: 1. Response to FERC Comment Regarding Reservoir Remote Monitoring Installation ENCLOSURE 1 Enclosure 1 DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Round Valley Dam, NATDAM No. CA00346 Response to FERC Comment Regarding Reservoir Remote Monitoring Installation In a letter to Pacific Gas and Electric Company (PG&E) dated April 21, 2022, the Federal Energy Regulatory Commission (FERC) provided a comment regarding the installation of remote monitoring equipment at Round Valley Reservoir, which is part of PG DeSabla-Centerville Hydroelectric Project, FERC No. 803is response. Comment 1: Please provide a detailed construction schedule including milestone dates and durations for completing the various work tasks associated with this project. PG&E has prepared a construction schedule, below, which includes major milestone dates and durations for the various work tasks associated with the project. PG&E plans to perform this work when the reservoir is empty. Based on historic trends, construction activities are expected to begin as soon as mid-July of 2022; however, these dates depend on the reservoir level at these times and may shift slightly. Phases and Key Milestones Target Completion Date FERC approval (received conditional authorization) April 21, 2022 Permitting complete / environmental release to May 13, 2022 construction Mobilization of construction crews July 18, 2022 Construction July 25, 2022 Project construction cleanup/demobilization October 5, 2022 FERC submission of final construction report February 1, 2023 1