Loading...
HomeMy WebLinkAbout4.25.22 Board Correspondence - FW_ Delegated Order issued in FERC P-619-172 (2) From:Paulsen, Shaina To:BOS Subject:Board Correspondence - FW: Delegated Order issued in FERC P-619-172 Date:Monday, April 25, 2022 9:19:27 AM Please see Board Correspondence from FERC. Shaina Paulsen Associate Clerk of The Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 T: 530.552.3304 | F: 530.538.7120 -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, April 25, 2022 8:15 AM Subject: Delegated Order issued in FERC P-619-172 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 4/25/2022, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-172 Lead Applicant: Pacific Gas and Electric Company Filing Type: Delegated Order Description: Order Approving as-Built Exhibit F Drawing re City of Santa Clara, California et al under P-619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20220425-3040__;!!KNMwiTCp4spf!BhN46KT- Cb5tniinRuxXsqP1fvUXZUA1xJu56SpEy9m5QKFESDOdutKAtP_ntVHto7sTXgqYs1Dogb_MaI0l14Ddby5pHlEM3sIc$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!BhN46KT- Cb5tniinRuxXsqP1fvUXZUA1xJu56SpEy9m5QKFESDOdutKAtP_ntVHto7sTXgqYs1Dogb_MaI0l14Ddby5pHl0vV- Fn$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!BhN46KT- Cb5tniinRuxXsqP1fvUXZUA1xJu56SpEy9m5QKFESDOdutKAtP_ntVHto7sTXgqYs1Dogb_MaI0l14Ddby5pHte1d8KQ$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov 179 FERC ¶ 62,057 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION City of Santa Clara, California Project No. 619-172 Pacific Gas & Electric Company ORDER APPROVING AS-BUILT EXHIBIT F DRAWING (Issued April 25, 2022) 1. On August 16, 2021, the City of Santa Clara, California and Pacific Gas & 1 Electric Company, licensees for the Bucks Creek Hydroelectric Project No. 619, filed a revised Exhibit F drawing to reflect as-built changes to the Grizzly intake structure. The project is located on the North Fork Feather River and Bucks and Grizzly creeks in Plumas County, California, and occupies federal land within the Plumas National Forest administered by the U.S. Forest Service. Licensees’ Filing 2. In its August 16, 2021 filing, the licensees state they completed installing a standby generator at the Grizzly powerhouse intake structure on May 18, 2021. The licensees include one Exhibit F drawing showing the new generator and its ancillary equipment. Review 3. Commission staff’s review shows the drawing conforms to the Commission’s rules and regulations and should be approved. Ordering paragraph (B) of this order requires the licensees to file the approved exhibit drawing in electronic file format. The Director orders: (A) The following Exhibit F drawing filed on August 16, 2021 for the Bucks Creek Hydroelectric Project No. 619, conforms to the Commission's rules and regulations, and is approved and made part of the license as labeled and numbered below. This order supersedes the previous Exhibit F-3 (drawing no. P-619-173) and deletes it from the license. 1 Pacific Gas and Electric Company, 52 FPC 1898 (1974). Project No. 619-172 2 FERC Drawing ExhibitDrawing Title 2 Drawing No.Filename Plan and Sections – Grizzly Intake Plan F-3 P-619-217 Intake Structure Grizzly & Sects Powerhouse (B) Within 45 days of the issuance date of this order, as directed below, the licensees must file the approved exhibit drawing in electronic file format. The licensees must prepare a digital image of the approved exhibit drawing in electronic format. Prior to preparing the digital image, the licensees must add the FERC Project-Drawing Number (i.e., P-619-217) in the margin below the title block of the corresponding approved drawing. The licensees must label and file the Exhibit F drawing as Critical Energy Infrastructure Information (CEII) material under 18 CFR § 388.113 (The submission should be comprised of: 1) a public portion consisting of a cover letter; and 2) a CEII portion containing only the Exhibit F drawing). Each drawing must be a separate electronic file, and the file name must include: FERC Project- Drawing Number, FERC Exhibit Number, Drawing Filename, date of this order, and file extension in the following format \[P-619-217, F-3, Grizzly Intake Plan & Sects, MM- DD-YYYY.TIFF\]. All digital images of the exhibit drawing must meet the following format specification: IMAGERY: black & white raster file FILE TYPE: Tagged Image File Format, (TIFF) CCITT Group 4 (also known as T.6 coding scheme) RESOLUTION: 300 dots per inch (dpi) desired, (200 dpi minimum) DRAWING SIZE: 22” x 34” (minimum), 24” x 36” (maximum) FILE SIZE: less than 1 megabyte desired (C) This order constitutes final agency action. Any party may file a request for rehearing of this order within 30 days from the date of its issuance, as provided in section 313(a) of the Federal Power Act, 16 U.S.C. § 825 l, and the Commission’s regulations at 18 C.F.R. § 385.713 (2021). The filing of a request for rehearing does not operate as a stay of the effective date of this order, or of any other date specified in this 2 The licensees must use this exact drawing title when filing the electronic file format drawing required in ordering paragraph (B). Commission staff shortened the drawing title due to filename character limits. There is no need to modify the title as it appears on the drawing. Project No. 619-172 3 order. The licensees’ failure to file a request for rehearing shall constitute acceptance of this order. Kelly Houff Chief, Engineering Resources Branch Division of Hydropower Administration and Compliance