Loading...
HomeMy WebLinkAbout9.14.22 Board Correspondence - FW_ Compliance Directives issued in FERC P-619-000From:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Hironimus, Patrizia; Kimmelshue, Tod; Lucero, Debra; Paulsen, Shaina; Pickett, Andy; Reaster, Kayla; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Valencia, Shyanne Subject:Board Correspondence - FW: Compliance Directives issued in FERC P-619-000 Date:Wednesday, September 14, 2022 2:49:31 PM Please see Board Correspondence below. Shaina Paulsen Associate Clerk of The Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 T: 530.552.3304 | F: 530.538.7120 -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, September 14, 2022 12:25 PM Subject: Compliance Directives issued in FERC P-619-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 9/14/2022, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 Lead Applicant: Pacific Gas & Electric Company Filing Type: Compliance Directives Delegated Order Description: Letter order authorizing Pacific Gas and Electric Company to immediately proceed with the elements described in comment No.1 at the Lower Bucks Lake Dam, part of the Bucks Creek Project under P-619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20220914- 3063__;!!KNMwiTCp4spf!CKVXn1xUZxOnSqw95o_hSFlQEJVS2x3M_60aeVXWXhCTMehdHwhP0dRysG_j5V8Ne6071y3XaDC722af6FwV5cUA9N1pE3gn9Q1S$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!CKVXn1xUZxOnSqw95o_hSFlQEJVS2x3M_60aeVXWXhCTMehdHwhP0dRysG_j5V8Ne6071y3XaDC722af6FwV5cUA9N1pE6H70e0l$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!CKVXn1xUZxOnSqw95o_hSFlQEJVS2x3M_60aeVXWXhCTMehdHwhP0dRysG_j5V8Ne6071y3XaDC722af6FwV5cUA9N1pE74K8xtN$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections – San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 (415) 369-3300 Office – (415) 369-3322 Facsimile September 14, 2022 In reply refer to: Project No. 619-CA Mr. Jan Nimick, Vice President Pacific Gas and Electric Company (PG&E) Mail Code: N11E PO Box 770000 San Francisco, CA 94177-0001 Re: Preconstruction Activities on Lower Bucks Lake Dam Spillway Dear Mr. Nimick: This is in response to a letter dated July 28, 2022 from Mr. Robert Ellis that submitted an Authorization Request for Preconstruction Activities for Spillway Rehabilitation Project at Lower Bucks Lake Dam, which is part of the Bucks Creek Project, FERC No. 619. We have reviewed the submittal, and we have the following comments: 1. We authorize PG&E to proceed with only the following two work items: a. removing vegetation (approximately 67 trees) within the project boundary b. the installation of the piping components for the low-level outlet bypass system. Please notify us if you plan to proceed with this work. All other proposed work required engineering and design services and includes some permanent work components. Your submittal was incomplete and did not include what we require for construction submittal packages. No other work outlined in your submittal is authorized until the following comments are satisfactorily addressed and we receive a complete and typical construction submittal package that address our typical requirements, including the following items, which are not intended to be all-inclusive. 2 2. For developing the access road and crane pad, please provide us with engineering analyses, specifications, and PE stamped drawings for these items, as these are engineered features. The crane pad was designed based on the preliminary product guide for a grove GRT9165, six-wheel steer crane. Include an explanation of how a geotechnical engineer will verify the stability of the pad. 3. Provide excavation plans and stability analyses for the crane pad section (excavating to ~20 ft high with 0.5H:1V) and the access road section (excavating to ~24 ft high with 0.5H:1V). 4. Provide us with the signed drawings indicated to be issued for construction or 100- percent complete. 5. Provide a QCIP for all proposed work, other than the work included in Comment No. 1. PG&E is authorized to immediately proceed with the elements described in Comment No. 1. No other work is authorized until our comments are adequately addressed and we issue authorization for construction of those elements of the work. PG&E is responsible for ensuring completion of any necessary environmental coordination with resource agencies as well as the procurement of any federal, state, or local permits required for the work. Within 45 days of this letter, please address our comments or provide a plan and schedule to address our comments. All required filings should be submitted using the Commission’s eFiling system at https://www.ferc.gov/ferc-online/overview. For all Dam Safety and Public Safety Documents, select Hydro: Regional Office and San Francisco Regional Office from the eFiling menu. The cover page of the filing must indicate that the material was eFiled. For assistance with eFiling, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). We appreciate your continued efforts in this aspect of the Commission’s dam safety program. If you have any questions, please contact Ms. Eunhye Kim at (415) 369-3332. Sincerely, Frank L. Blackett, P.E. Regional Engineer 3 cc: Ms. Sharon Tapia, Division Manager CA Dept. of Water Resources Division of Safety of Dams P.O. Box 942836 Sacramento, CA 94236-0001