Loading...
HomeMy WebLinkAbout4870 Boettcher_SD-1 Rev #3SHEAR TRANSFER N.T.S. EN 1 3 6 7 1.8d @ 6" o.c. 2.ROOF SHEATHING PER PLAN 3.OUTLOOKER PER PLAN 4.SOLID ROOF FRAMING PER PLAN 5.RAFTER PER PLAN 6.INTERIOR FINISH PER PLAN 7.WALL WITH EXTERIOR FINISH PER PLAN 8.BLOCK EA. BAY, FASTEN TO TOP PLATES W/ 16d @ 6" o.c. 2 4 (530)892-1100PHONE:ENERGY ADA COMPLIANCECOMMERCIALRESIDENTIALSTRUCTURAL SUBMITTAL SET SD-1 N.T.S.TOP PLATE PENETRATIONS NOTES: 1.Notches & penetrations greater than 13 width of top plate are not allowed. 2.Max diameter of penetration to be 13 width of top plate. 3.All penetrations are required to be within middle 13 of top plate. 4.Minimum spacing between penetrations shall be 3-times the diameter of the largest penetration.1/3 1/3 1/3 2 WALL / FOOTING REINFORCING 1.NOTE THESE DIMENSIONS APPLY TO MASONRY OR CONCRETE CONSTRUCTION AND FOR SINGLE OR DOUBLE CURTAIN N.T.S. AND/ORWALLS FOOTINGSFOOTINGS AND/ORWALLS "LAP" - SEE REINFORCING STEEL GENERAL NOTES FOR REQUIRED. LAP AND BENDS BAR SIZE #3 - #8 #14 - #18 #9 - #11 STANDARD BAR HOOKS 180° MIN INSIDE BEND ~ "D" 16GA MIN TIE WIRE GENERAL NOTES FOR REQD LAP "LAP" - SEE REINFORCING STEEL TYPICAL STIRRUPS 6d 10d 8d 1 6 MIN INSIDE BEND ~ "D" 4d 6d #3 - #5 #6 - #8 BAR SIZE AND TIES 90°135°90° 4d (2 1 2" MIN.)d12dD TYP dD6d4" MIN LAP LAP LAP12"12"12"12"TOP PLATE SPLICE MIN. LAP = 4'-0" TYP. 1.DOUBLE TOP PLATE ASSEMBLY PER PLAN 2.12-16d NAILS EACH SIDE OF SPLICE 3.16d @ 16" O.C. 4.SPLICES TO OCCUR ONLY OVER CENTERLINE OF STUD 5.STUDS PER PLAN TYP. TYP. 5 N.T.S.TYPICAL WOOD WALL FRAMING 3 1.MINIMUM SPACING PER NOTE 4 4N.T.S. N.T.S.8"MIN.10"3 4 6 1.SIMPSON TITEN HD SPACING PER S.W. SCHED AND SN-1 FOR RETROFIT ANCHORS 2.HOLDOWN SIZE PER PLAN 3.POST OR DOUBLE STUD PER PLAN. EDGE NAIL REQUIRED INTO POST OR DOUBLE STUD FROM SILL PLATE TO TOP PLATE. ATTACH DOUBLE STUDS TOGETHER FULL HEIGHT WITH 2 ROWS 16d SINKERS @ 12" o.c. (MIN. 16 NAILS TOTAL) 4.P.T. SILL PER PLAN 5.EXISTING CONCRETE FOOTING 6.38"Ø THREADED ROD (ASTM 1554 GR 36) W/ 10" EMBEDMENT. EPOXY ANCHOR WITH SET 3G BY SIMPSON. INSTALL PER MFG. REQ'MTS. SPECIAL INSPECTION DURING INSTALLATION IS REQUIRED AND WILL BE PROVIDED BY STREAMLINE ENGINEERING. PROVIDE 24 HR. NOTICE PRIOR TO INSTALLATION. 7.PROVIDE COUPLING NUT AND TRANSITION TO 5 8"Ø A.B. AS REQ'D PER HOLDOWN 1 5 2 RETRO-FIT HOLDOWN 7 1.12-16d EA. SIDE OF SPLICE TYP. 2.SPLICE OVER STUD WHERE OCCURS 3.2x KING STUD OR DBL 2x HOLD DOWN STUDS PER PLAN 4.BLOCKING PER WALL SCHEDULE WHERE OCCURS 5.STUDS @ 16" o.c. U.O.N. 6.SILL PLATE 7.STAGGER TOP PLATE SPLICES 4'0" MIN 8.DBL. TOP PLATES 9.16d @ 16" o.c. STAGGERED 10.E.N. PLYWOOD TO HEADER & TO FULL-HEIGHT OF KING POSTS, TYP. 11.DOUBLE 2x SILL 12.FRAMING WINDOWS 13.HEADER PER PLAN 14.2x TRIMMER U.O.N. ON PLAN 15.16d @ 12" o.c. 1 2 3 4 6 7 10 11 12 13 14 15 8 9 5 HOLDOWN @ SLAB AT SSTB34, SSTB28,& SSTB24 A.B.dc 5" MAX.3" MIN.8"MIN.Le1 4 5 30" WHERE OCCURS 32" MIN.1.POST OR DOUBLE STUD PER PLAN. EDGE NAIL REQUIRED INTO POST OR DOUBLE STUD FROM SILL PLATE TO TOP PLATE. ATTACH DOUBLE STUDS TOGETHER FULL HEIGHT WITH 2 ROWS 16d SINKERS @ 12" o.c. (MIN. 16 NAILS TOTAL) 2.HOLDOWN TYPE PER PLAN INSTALLED PER MFG. 3.ANCHOR BOLT SIZE AND SPACING PER "SHEARWALL" SCHEDULE. 4.2x OR 3x P.T. SILL PER PLAN 5.INSTALL SSTB WITH ARROW ON TOP OF BOLT POINTING IN THE DIRECTION REQUIRED BY SIMPSON STRONG-TIE. Le AND dc PER MFG. 6.REBAR TOP AND BOTTOM PER PLAN N.T.S.3"CLR.6 3 3 2 2571 CALIFORNIA PARK DRIVECHICO, CALIFORNIA 95928SUITE 210N.T.S.PLYWOOD ROOF SHEATHING 1.ROOF FRAMING, TYP. 2.BLOCKING @ WALL LINE, TYP. 3.ROOF SHEATHING PER NOTES. STAGGER PLYWOOD w/ FACE GRAIN PERPENDICULAR TO FRAMING NOTES: 1.All roof sheathing to be 1532" CDX, 5 ply min. Panel index 3216. 2.Use edge nailing of 8d @ 6"o.c. @ all panel edges, shear walls, ties, and blocking. Field nail @ all interior bearings w/ 8d @ 12"o.c. on roofs. 3.Place panels continuous over two or more spans and provide 18" gap @ all panel edges. 4.Face plys are not to be broken by nail heads. The min edge distance for nails shall be 38" in the plywood and the receiving member. 5.ICBO accepted & APA rated PERFORMANCE RATED SHEATHING panels may be substituted for plywood. Panel thickness and span rating shall be equal to that noted on these plans. SHEAR TRANSFER AT EAVE 1 2 3 4 11 6 7 8 9 10 1.ROOF FRAMING PER PLAN 2.H2.5A EA. ROOF RAFTER 3.INTERIOR FINISH PER PLAN 4.WALL SHEATHING & EDGE NAILING PER "SHEARWALL SCHEDULE" 5.ROOF SHEATHING PER PLAN 6.8d @ 6" o.c. 7.EXTERIOR EAVE FRAMING & FINISH PER PLAN 8.2x BLOCK w/ LS CLIP PER S.W. SCHED (MIN. 24" O.C. ENTIRE WALL LINE) PROVIDE VENTILATION PER CODE 9.EDGE NAIL 10.EXTERIOR FINISH PER PLAN WHERE OCCURS 11.3-SDS25300 EA. RAFTER TO CEILING JOIST N.T.S. 5 13 1 PLANS FORBOETTCHER RESIDENCE4387 KATHY LANECHICO, CALIFORNIA614 EN 8 STRUCTURAL SECTION N.T.S. 1.ROOFING PER ARCH (EXISTING AND/OR NEW PER PLAN) 2.EXISTING ROOF SHEATHING 3.EXISTING ROOF FRAMING 4.VERIFY (E) COLLAR TIE, 1x6 @ 4'-0" O.C MAX. PROVIDE NEW AS REQ'D 5.RE-FRAME RAFTER KICKERS AND PLATES IN-KIND AS REQ'D. 4'-0" O.C. MAX 6.NEW ROOF SHEATHING PER PLAN & SN-1 7.NEW ROOF FRAMING PER PLAN 8.EAVE DETAIL PER 13/SD-1 9.INTERIOR FINISH PER PLAN 10.NEW CEILING JOIST PER PLAN. FASTEN TO ROOF RAFTERS TO MATCH 13/SD-1 11.CS16 STRAP @ 4'-0" o.c., 16" MIN. END LENGTH EA. CEILING JOIST 12.EXISTING / NEW BEAM PER PLAN 13.NEW BLOCKING EA. BAY 14.NEW CRIPPLE WALL, 2x4 14" MIN. LENGTH @ 24" o.c. 15.NEW BUILT-UP BEAM PER PLAN. SISTER MEMBERS PER PLAN 16.EXISTING CEILING RAFTER 17.LU SERIES HANGER OR EQUIV. 12 2 3 4 5 1 1 6 8 9 7 10 11 9 10 12 14 15 13 14 13 16 17 13 BEAM DETAIL N.T.S. 1.ROOFING PER PLAN 2.ROOF SHEATHING PER PLAN & SD-1 3.ROOF FRAMING PER PLAN 4.BLOCKING EA. BAY 5.CRIPPLE WALL, 2x4 @ 24" o.c. 6.INTERIOR FINISH PER ARCH 7.NEW CEILING JOIST PER PLAN 8.NEW BUIT-UP BEAM PER PLAN, RECESSED. SISTER MEMBERS W/ 3-SDS25300 @ 12" O.C. 9.CS16 STRAP @ 4'-0" O.C.. PROVIDE 16" END LENGTH EA. CEILING JOIST 10.EXISTING ROOF RAFTER, HANG TO NEW BEAM W/ THA SERIES HANGER, PROVIDE LENGTH TO WRAP OVER TOP OF BEAM 11.EXISTING CEILING JOIST. HANG TO NEW BEAM W/ LU SERIES OR EQUIV 15 1 6 7 8 10 11 2 3 4 5 9 3" CLR.PER PLAN 1 SPREAD FOOTING N.T.S. 1.POST PER PLAN 2.SIMPSON PBS POST BASE FOR STAND-ALONE POSTS. SILL PLATE FOR IN-WALL POSTS 3.OPTIONAL CONSTRUCTION JOINT ROUGH, CLEAN, WET 4.CONCRETE SLAB, BASE, AND REINFORCEMENT PER PLAN 5.UNDISTURBED SOIL 6.REINFORCING PER "FOOTING SCHEDULE" 7.EXISTING SLAB TO REMAIN 8.#3 DOWEL, 6" EMBED. MIN. 2 PER SIDE OF (N) FOOTING 2 3 4 5 6SEE FOOTINGSCHEDULE8N.T.S.FOOTING DETAIL 12" 4 1 1 2 1.CONCRETE SLAB AND BASE PER PLAN 2.REINFORCEMENT WHERE OCCURS CENTERED IN SLAB 3.#4 CONTINUOUS TOP & BOTTOM 4.WALL PER PLAN 5.UNDISTURBED SOIL OR ENGINEERED FILL. NOTE: FOR EMBEDDING FOOTING INTO ENGINEERED FILL, A GEOTECHNICAL REPORT / EVALUATION IS REQUIRED PRIOR TO CONSTRUCTION 6.OPTIONAL CONSTRUCTION JOINT 7.#3 VERTICAL w/ 18" LEG INTO SLAB @ 18" O.C. TIED TO REINF. IN SLAB SPACED @ 18" O.C. (ONLY REQUIRED WHEN CONSTRUCTION JOINT IS USED) 8.#4 CONTINUOUS @ 12" O.C. (MIN. 1 BAR AT FTG TOP AND BOTTOM) WITH 20" MIN. LAP AT ALL CORNERS 9.WALL SHEATHING PER S.W. SCHED (WHERE APPLICABLE) 10.A.B. PER S.W. SCHED AND SN-1 2 5 8 6 7 18" TYP.OR3'-0" PER PLANFOOTING DETAIL 1.WALL PER PLAN 2.INTERIOR FINISH PER PLAN 3.SHEATHING PER "SHEARWALL SCHEDULE" 4.ANCHOR BOLT PER PLAN. SEE "SHEARWALL SCHEDULE" FOR SPACING OR NOTES ON SN-1 FOR NON SHEARWALLS. PROVIDE TITEN HD. OF EQUIV. SIZE FOR EXISTING CONDITIONS 5.SLAB AND BASE PER PLAN 6.REINFORCEMENT PER PLAN WHERE OCCURS CENTERED IN SLAB 7.UNDISTURBED SOIL OR ENGINEERED FILL PER PLAN 8.#4 CONTINUOUS TOP AND BOTTOM WITH 20" MIN. LAP AT ALL CORNERS 9.DOWEL PER PLAN. EPOXY BARS W/ SET-3G INSTALLED PER MFR. REQ'MENTS 10.(E) FOUNDATION TO REMAIN N.T.S. 12"3" CLR.5 6 1 2 4 3 9 EN 9 10 MATCH DEPTH7 8 9 10 7 8 10 FOOTING DETAIL N.T.S. 1.IN-WALL POST PER PLAN 2.INTERIOR FINISH PER PLAN 3.SHEATHING PER "SHEARWALL SCHEDULE" 4.ANCHOR BOLT PER PLAN. SEE "SHEARWALL SCHEDULE" FOR SPACING OR NOTES ON SN-1 FOR NON SHEARWALLS. 5.EXISTING SLAB TO REMAIN, TYP. 6.SLAB POUR-BACK PER BUILDER. IF TWO-POUR W/ FOOTING, PROVIDE REBAR DOWEL FROM (N) SLAB INTO (E) SLAB 7.LONGITUDINAL REINFORCEMENT PER PLAN 8.4- #4 DOWELS W/ 6" EMBED INTO (E) FOOTING 9.EXISTING FTG. VERIFY MIN. 12" WIDTH, TYP. PER PLAN EXISTING 7 6" MAX.6 11 2-1/2"7 1 1-3/4" MINFROM EDGE9" MIN. FROM CORNER / END 6 1 PLAN 1 1 1 1 3 3 3