Loading...
HomeMy WebLinkAboutB22-3933 SITE PLAN Revised 12-21-221 inch = ft. ( IN FEET ) GRAPHIC SCALE 020 20 40 20 8010W WWWWWWWEEEEE E E GASGA SG ASG AS(E) SEPTIC TANK LOC. BY BUTTE CO. AS-BUILT AND (E) LEACH FIELD APPROXIMATED PER BUTTE CO. AS-BUILT (CONTRACTOR TO VERIFY LOCATION OF TANK AND LEACH FIELD PRIOR TO CONSTRUCTION) CONTRACTOR TO VERIFY INLET OF SEPTIC TANK TO ENSURE MIN. 1/4" PER FT. FALL FOR WASTE WATER SYSTEM OF NEW HOMES IS REQUIRED AND TO ESTABLISH FINISH FLOOR ELEVATION TO ALLOW FOR PROPER DRAIN LINE SLOPE TO (E) TANK. FOUNDATION TO BE MIN. 5' FROM SEPTIC & LEACH FIELD (N) WATER LINES TO BE MIN. 5' FROM (N) OR (E) LEACH FIELD ALL (N) PG&E UTILITIES TO BE MIN 10' FROM (E) LEACH FIELD (E) LEACH TRENCH APPROX. PER BUTTE CO. AS-BUILT (N) POWER LINE P R O P ER TY LIN EPR OPERTY LINE (E) WATER METER 1 1/4" PVC SCHED. 40 WATER LINE APPROX. UTILITY TIE COORIDINATED w/ PG&E BY OTHERS PROPOSED RESIDENCE 13' - 3 1/2"18' - 3 1/2"(E) CONC. SEPTIC TANK APPROX. PER BUTTE CO. AS-BUILT (N) CONC. DRIVE (E ) C O N C . D R IV E 10' P.U.E.10 ' S ETB A C K 10 ' S ETB A C K P R O P E R TY LIN E P R OPE RTY LINE 20' MIN. BUILDING SETBACK 5' MIN.(N) PROPANE TANK BY OTHERS 28'PROJECT SITE Engineering,RANCHOInc.RANCHO ENG. JOB:RANCHO ENGINEERING INC. DOES NOT REPRESENT THAT THESE PLANS OR ANY SPECIFICATIONS IN CONNECTION THEREWITH ARE SUITABLE WHETHER OR NOT MODIFIED, FOR ANY OTHER SITE THAN THE ONE FOR WHICH THEY WERE SPECIFICALLY PREPARED. RANCHO ENGINEERING INC. DISCLAIMS RESPONSIBILITY FOR THESE PLANS AND SPECIFICATIONS IF THEY ARE USED WHOLE OR IN PART AT ANY OTHER SITE. PLANS ARE NOT VALID UNTIL REVIEWED AND APPROVED BY APPROPRIATE GOVERNMENTAL AGENCIESDRAWN BY: CKD. BY: DATE: REVISION:6067 SKYWAY, PARADISE, CA 95969Phone: (530) 877-3700Fax: (530) 877-3700DRAWING NUMBERCIVIL - STRUCTURAL - SEPTIC DESIGN JARROD HOLLIDAY, P.E. RANCHO ENGINEERING INC. 6067 SKYWAY PARADISE, CA 95969 530.877.3700 ranchoengineering@gmail.com STRUCTURAL/DESIGNER ENGINEER GROUND IMMEDIATELY ADJACENT TO THE FOUNDATION SHALL BE SLOPE AWAY FROM THE BUILDING AT A SLOPE OF NOT LESS THAN 6" WITHIN THE FIRST 10 FT. (5% SLOPE). PER 2019 CRC SECTION R401.3 SCOPE OF WORK: NOTE: THE BMP'S (BEST MANAGEMENT PRACTICES) LISTED BELOW MUST BE IN PLACE DURING THE RAINY SEASON (OCTOBER 15 THROUGH APRIL 15) AND MAY BE REQUIRED AT OTHER TIMES BASED ON WEATHER AND SITE CONDITIONS THROUGHOUT THE YEAR. THE BMP'S LISTED ARE MINIMUM REQUIREMENTS AND ADDITIONAL BMP'S COULD BE REQUIRED BASED ON SITE CONDITIONS. 1. STABILIZED ENTRY: PROVIDE MINIMUM 3" TO 6" FRACTURED ROCK 50' LONG x 15' WIDE BY 6" DEEP OVER CONSTRUCTION GRADE FABRIC. 2. ALL SOILS TRACKED ONTO PAVED ROADWAYS MUST BE CLEANED ON A DAILY BASIS. WHEN STREETS ARE WET OR DURING A RAIN EVENT THERE SHALL BE NO TRACKING OF SOILS ONTO THE STREET. 3. WATTLES SHALL BE INSTALLED PROPERLY, BEHIND CURB OR SIDEWALKS. 4. ROCK BAGS (MINIMUM 2 PER SIDE) AT ALL DRAIN INLET LOCATIONS WITHIN 150' OF THE PROJECT SITE. 5. INTERNAL FILTERS SHALL BE PLACED INSIDE EACH DRAIN INLET. 6. TRASH BARS SHALL BE PLACED ACROSS THE BACK OF ALL DRAIN INLETS. 7. STABILIZE ALL DISTURBED SOILS IN THE FRONT YARD AREAS WITHIN 15' OF THE BACK CURB OR SIDEWALK. (STRAW OR EROSION BLANKETS MAY BE USED FOR THIS APPLICATION) 8. STABILIZE ALL SLOPES WHERE EROSION COULD OCCUR AND CAUSE SILT RUN OFF. (STRAW, VISQUEEN OR EROSION BLANKETS MAY BE USED FOR THIS APPLICATION) 9. ALL PAINT, FUEL, CONSTRUCTION PRODUCTS ETC. SHALL BE STORED IN A COVERED LOCATION AWAY FROM SIDEWALKS AND STORM DRAIN INLETS. 10. PORTABLE CHEMICAL TOILETS IF PROVIDED ON THE SITE MUST BE KEPT OFF OF STREETS AND SIDEWALKS AND A LEAST 50' FROM THE NEAREST STORM DRAIN. 11. ALL TRASH MUST BE COLLECTED AND STORED PROPERLY. DO NOT LET ITEMS SUCH AS DRYWALL MUD BOXES, PAINT BUCKETS, CLEANING MATERIAL CONTAINERS, ETC. COME IN CONTACT WITH ANY RAINFALL OR STORM WATER RUNOFF. 12. PROVIDE A DESIGNATED AREA FOR CONCRETE WASHOUT. HAY BAILS LINED WITH VISQUEEN MAY BE USED FOR THIS APPLICATION. ROLLAWAY BINS MAY ALSO BE USED. ALL CONCRETE WASHOUT SYSTEMS SHALL BE PLACED OFF OF THE PAVED STREETS. 13. AFTER INSTALLATION OF THE ABOVE ITEMS ARE COMPLETE, A MAINTENANCE PROGRAM NEEDS TO BE DEVELOPED TO INSURE THE CONTINUED EFFECTIVENESS OF YOUR BMP'S. MINIMUM EROSION AND SEDIMENT CONTROLS FOR PROJECTS DISTURBING LESS THAN ONE ACRE G-10 CODE ANALYSIS: PROPOSED RESIDNCE: USE CODE: R3 & U ZONING: RR-5 USE: SINGLE FAMILY RESIDENTIAL CONSTRUCTION TYPE: VB SETBACKS: ZONE: RR-5 FRONT: 20' SIDE: 10' REAR: 10' MAX HEIGHT STRUCT.: 35' KNOW WHAT'S BELOW CALL BEFORE YOU DIG (800) 227-2600 CALL TWO WORKING DAYS BEFORE YOU DIG. www.usanorth.org 811 NOTE: SITE SURVEY WAS NOT CONDUCTED BY E.O.R. FEATURES LOCATED (INCLUDING SEPTIC TANK) VIA DRONE IMAGERY PROVIDED BY THE REBUILD PARADISE FOUNDATION. THE ENGINEER IS NOT RESPONSIBLE FOR KNOWING THE CONDITION OF THE EXISTING SEPTIC SYSTEM, NOR SHALL THE ENGINEER WARRANTY OR GUARANTEE THE PERFORMANCE OR LIFE SPAN OF SAID SYSTEM. WATER CONSERVATION IS VITAL IN PRESERVING THE EXISTING LEACH FIELDS FOR AS LONG AS POSSIBLE. ANY FUTURE REPAIRS TO THIS SEPTIC SYSTEM DUE TO LEACH FIELD FAILURE WILL SURELY RESULT IN A COSTLY REPLACEMENT SEPTIC SYSTEM. PROJECT DATA: JURISDICTION: BUTTE COUNTY ASS. PARCEL NO.: 066-100-023 (0.23 ACRES) PROJECT DESCRIPTION: NEW RESIDENCE (1,316 SQFT.) OWNER: KEVIN RATTERMAN/ERIC RAMIREZ PLAN INFO BUTTE CREEK (MASTER PLAN) MP21 - 0017 GARAGE LEFT DEN OPT. 2 BED/2 BATH THIS PROJECT WILL CONSIST OF THE CONSTRUCTION OF A 1,316 SQFT. 2-BED/2-BATH TO REPLACE STRUCTURE PREVIOUSLY LOST TO FIRE IN MAGALIA, CA. THIS PROJECT HAS APPROVED MASTER PLAN PER THE "PLAN INFO" BOX ON THIS PAGE SITE PLANC1 TG JPH 22-2506385 GLENDALE DR.MAGALIA CA, 95954APN# 066-100-023RATTERMAN /RAMIREZ -GLENDALE11/29/2022 1" = 20'-0" SITE PLAN N.T.S. SITE LOCATION MAP Applicant will install five (5) feet of non-combustible material extending five (5) feet horizontally from the furthest extent of the building to meet the same practical effect as the required 30 foot set back per CCR Sec. 1276.01