Loading...
HomeMy WebLinkAboutTPM23-0002 Will Serve Ltr. to Butte County Farm Bureau (09.07.2022)DURHAi IRRIGATION DISTRIC SffviNi; CUD CDUM'.^i'r ;;iu( iS4!l September 1,2022 Colleen Cecil, Executive Director - colleen@buttefarmbureau.com Butte County Farm Bureau P.O. Box 360 Durham CA 95938 Ed and Debra McLaughlin - USPS P.O. Box 1 Durham CA 95938 Transmitted vio USPS and electronic mail "Will Serve" letter for Potable Water Service to APN 040-180-041 9412 Jones Avenue RE: Dear Ms. Cecil and Mr. McLaughlin, This is to inform you that the above-referenced real property lies within the Durham Irrigation District's current boundaries. Water service by the District to this project will be provided contingent upon compliance with all rules, regulations, policies, resolutions, fees, and specifications that are in effect at the time connection to the District's water system is requested and any payment by the applicant of all fees and costs incurred by the District in connection therewith. in particular, the District calls your attention to its policy requiring a backflow device for buildings that have fire sprinkler systems and the requirement that such devices be tested annually. (Appendix A) Additionally, the District also advises that total hydrant fire flow is currently limited to 1,200 gpm at this location. The District requires receipt of the following, as applicable: 1. Final maps for the real property or use permit applications, as the case may be; 2. Payment of the applicable connection fee for a 2" meter ($30,800.00 per attached Appendix A - Rates, Fees and Charges updated January 1, 2022); and, 3. Review and acceptanceof completed water system improvements whether on-site or off-site and which are associated with this property. Connection of water service as provided in a Will Serve Letter shall be contingent upon the District, at the time of request for connection, having sufficient water and shall further be contingent upon the District having sufficient treatment and delivery capacity to comply with all laws and regulations concerning the delivery of domestic water. All District commitments to deliver water shall, during water supply shortage 9418-C Midway / PO Box 98 - Durham, CA 95938 (530) 343-1594 l info@didwater.org l www.didwater.org "Will Serve" letter for Potable Water Service to APN 040-180-041 September 7, 2022 Page 2 of 2 conditions, be subject to the provisions of the then-current District Water Shortage Contingency Plan and/or Adopted Water Shortage Emergency Measures. This Will Serve Letter shall terminate at the sooner to occur of either five (5) years after the date of the Will Serve Letter or upon the termination or expiration of any building permit issued to the applicant for construction of improvements on the real property which is the subject of the Will Serve Letter (unless connection to the District water system has been made prior to the termination or expiration of any use permit, tentative map or parcel division approval). Should you require additional information, please contact the District office. Sincerely, Jeannie Trizzino Administrative Assistant Filecc: Mark Adams, Contract Engineer Jeff Carter, Legal Counsel Page 2  Appendix A  Rates, Fees and Charges  Flat and Metered Rates Effective January 1, 2022  Other Fees and Charges Effective March 1, 2021  (updated/adopted at the Regular Board Meeting of January 19, 2021)      1 Connection Fees, Flat Rates, Metered Rates for Services  Fee  Meter Charges     Flat Rate Conversion Fee (at time of transfer of title, if applicable)1  $650  Flat Rate Services2     ¾” Service  $63.78   1” Service  $84.16   1‐1/2” Service  $134.74   2” Service  $194.21   Development  $1,084.20  Meter Rate Base Fee3*        ¾” Service  $35.07   1” Service  $46.43   1‐1/2” Service  $72.02   2” Service  $102.50   3” Service  $192.91   4” Service  $309.88   6” Service  $602.05   Miscellaneous Service  $701.49   *Quantity Fee per centum cubic feet (CCF) (748 gallons)    $1.00/CCF  Connection Fees     ¾” Meter Size  $5,810   1” Meter Size  $9,617   1‐1/2” Meter Size  $19,181   2” Meter Size  $30,800   3” Meter Size  $53,846   4” Meter Size  $90,011   6” Meter Size  $179,469         1 Assumes that the parcel is an existing District customer with Flat Rate Service.  2 Effective January 1, 2021.  3 Effective January 1, 2021   Appendix A  Rates, Fees and Charges  Flat and Metered Rates Effective January 1, 2022  Other Fees and Charges Effective March 1, 2021  (updated/adopted at the Regular Board Meeting of January 19, 2021)      2 Customer Service and Noticing  Fee  Customer Set Up Fee / New Account Fee  $25  Duplicate Bill4  $2.75  Water Bill Late Fee/Penalty Fee  1.5% of late balance  Delinquency4 (unpaid bill after 45 days)  $20  Closing Account Fee  $25  Lock‐Off Notice4    $20  Fifteen Day Notice (non‐residential property)  $15  Delivery of 48‐hour Notice (non‐residential property)  $25  Disconnection Fee4  $32.50  Reconnection Fee4  $32.50  Returned Check4  $25  Meter Inspection / Testing (refundable if accuracy differs +/‐ 5%)  $50  Transfer of Ownership, Special Meter Reading, Title Company Payoff  Demand Request (demand requests, processing, meter reading, etc.)   $30  Credit Card Transaction Fees for Online Payments     Online Payments  No Charge  Wasteful Use Fees (non‐compliance related)     Notification Fee (non‐compliance related)  $25   Compliance Review (non‐compliance related)  $25  Work Orders     Service Trip Charge (resulting in owner/occupant repair)  $50   After Hours Call‐out (between 5:00pm‐8:00am, $65/hr, 2hr min.)  $130 +  Backflow Fees:     Annual Testing/Re‐Testing   LEMO5 plus administrative  processing fee of $40.00  Meter Tampering     First Offense5    $50 plus repair costs   Second Offense5  $250 plus repair costs   Subsequent Offenses5  $250 plus repair costs and  meter removal cost  Meter Removal & Re‐Installation  LEMO plus administrative  processing fee of $40.00      4 Adopted 11‐12‐15  5 LEMO ‐ Labor, Equipment, Materials, Overhead   Appendix A  Rates, Fees and Charges  Flat and Metered Rates Effective January 1, 2022  Other Fees and Charges Effective March 1, 2021  (updated/adopted at the Regular Board Meeting of January 19, 2021)      3     Operations, Administrative & Engineering  Fee     Will‐Serve Letters & Processing    Preliminary Review ‐ District  Administrative Overhead Filing and  Research   $850 deposit required, 100% actual cost, plus outside  professional and agency processing fees   Subdivisions $5000 deposit required, 100% actual cost, plus outside  professional and agency processing fees     Legal Document Preparation  $850 deposit required, 100% actual cost, plus outside  professional and agency processing fees     Annexation Processing  100% actual cost, deposit required, plus outside  professional and agency processing fees     District Overhead Charges     Administrative/Operations/Labor 100% actual cost    Engineering Fees     Planning Review Fee, Parcel Maps &  Other  $2500 deposit required, 100% actual cost, including  outside professional and agency processing fees     Other Services (Planning, Legal)    Planning Review Fee, Subdivision Maps $5000 deposit required, 100% actual cost, including  outside professional and agency processing fees     Duplication Fees    Fee   Photocopy General Business Documents (B&W up to 11x17)  $0.25   Photocopy General Business Documents (Color up to 11x17)  $1.50   Engineering Drawings & Maps ‐ Large Format Printing    Line work, < 10% Coverage **     $5.00 / file + $1 / sq. ft. paper    Areas > 10% Coverage **     $5.00 / file + $2 / sq. ft. paper   Engineering Drawings & Maps*‐ Digital Copies Processing  $5.00 + $1 / file   Bid Documents       Regular Copy Fee    District Specifications (hardcopies)     Regular Copy Fee   ** Existing Files – Ready to Print