HomeMy WebLinkAboutADM23-0010 PERMIT_RCI Signed ApprovedTEMPORARY ADMINISTRATIVE PERMIT BUTTE COUNTY ZONING ADMINISTRATOR May 12, 2023
DATE: ADM23-0010
PERMIT NO.
041-090-050, 041-090-051
ASSESSOR’S PARCEL NO.
Pursuant to the provisions of Chapter 24-174 of Butte County Code and the special conditions set forth below, RGI General Engineering, Inc. is hereby granted approval for a temporary
construction/lay down yard to accommodate heavy equipment operated from Monday to Friday, 7 a.m. to 5:30 p.m. The temporary construction/lay down yard must be removed within 10 days of the end of the Paradise Irrigation District MISLR (Meter Installation and Service Lateral Replacement) Phase 3 Project or October 31, 2025, whichever comes first. The two parcels are
zoned Recreation Commercial (RC). APN 041-090-050 is 12.99 acres, and APN 041-090-051 is 5 acres, located north of Neal Road 8 miles southeast of the City of Chico, at 5000 Neal Road.
I. GENERAL REQUIREMENTS, CONDITIONS, AND RESTRICTIONS:
1. Failure to comply with the conditions specified herein as the basis for approval of
application and issuance of Permit constitutes cause for the revocation of said permit in
accordance with the procedures set forth in the Butte County Zoning Ordinance, including Butte County Code Sec. 24-174.
3. The terms and conditions of this Permit shall run with the land and shall be binding upon and to the benefit of the heirs, legal representatives, successors, and assigns of the Permittee.
4. Neither the applicant, nor any agent nor representative of the applicant shall intentionally omit or misrepresent any material fact in connection with the application. Any alleged
material misrepresentation shall constitute grounds for the Director of Development Services to commence a revocation hearing, and, if proven to exist, shall constitute
sufficient grounds to revoke the Permit.
5. The approved use shall be developed and maintained in substantial conformance with the
approved site plan and operations plan on file with the Butte County Planning Division. Minor changes to the plans may be allowed subject to the approval of the Director of Development Services, if found to be in substantial conformance to the approved project.
II. CONDITIONS OF APPROVAL:
Butte County Department of Development Services.
1. Prior to the implementation of this Administrative Permit, obtain an encroachment permit for a paved approach from Butte County Public Works.
2.Any lighting shall be located, adequately shielded, and directed such that no direct
light falls outside the property line, or into the public right-of-way.
3.The construction yard shall be immediately removed within 10 days of competition
of the construction project or expiration of the building permit.
Dated: ___________ __________________________________ Applicant
__________________________________ Approved by: Mark Michelena, Principal Planner
5/15/2023