Loading...
HomeMy WebLinkAboutMUP23-0003 APPLICATIONButte County Department of Development Services PLANNING DIVISION 7 County Center Drive, Oroville, CA 95965 Planning Center Phone 530.552.3701 Fax 530.538.7785 dsplanning@buttecounty.net PROJECT INFORMATION FORM Project # (Staff Use Only) APPLICANT’S NAME: (If applicant is different from owner an affidavit is required.) ASSESSOR’S PARCEL NUMBER: - - ADDRESS: STREET, CITY, STATE, & ZIP CODE TELEPHONE: ( E-MAIL:FAX: ( ) - FISCAL CONTACT: (the party that will handle permit fees, invoices and other financial concerns for this application) ADDRESS: STREET, CITY, STATE, & ZIP CODE TELEPHONE: ( E-MAIL: OWNER’S NAME: TELEPHONE: ( ) - ADDRESS: STREET, CITY, STATE, & ZIP CODE: PROPERTY INFORMATION NAME OF PROPOSED PROJECT (if any) SITE SIZE (in square feet or acres) LOCATION OF PROJECT (major cross streets and address, if any) ZONE GENERAL PLAN EXISTING LAND USE PROPOSED LAND USE EXISTING STRUCTURES (square feet) PROPOSED STRUCTURES ( square feet) UNDER WILLIAMSON ACT CONTRACT Yes No (Check One) PROPERTY IS OR PROPOSED TO BE SEWERED PROPERTY IS OR PROPOSED TO BE ON SEPTIC (Check One) PROPERTY IS OR PROPOSED TO BE ON PUBLIC WATERPROPERTY IS OR PROPOSED TO BE ON WELL WATER APPLICATION TYPE (check all that apply)  ADMINISTRATIVE PERMIT  MINOR VARIANCE  CERTIFICATE OF CORRECTION LEGAL LOT DETERMINATION  VARIANCE  REZONE CONDITIONAL USE PERMIT  CERTIFICATE OF MERGER  GENERAL PLAN AMENDMENT MINOR USE PERMIT  TENTATIVE SUBDIVISION MAP  MINING AND RECLAMATION PLAN COMMUNICATIONS FACILITY UP/MUP  TENTATIVE PARCEL MAP  DEVELOPMENT AGREEMENT LOT LINE ADJUSTMENT  WAIVER OF PARCEL MAP OTHER __________________________ PROJECT DESCRIPTION FULL DESCRIPTION OF PROPOSED PROJECT (Attach necessary sheets. If this application is for a land division, describe the number and size of parcels.) I CERTIFY THAT I AM PRESENTLY THE LEGAL OWNER OR THE AUTHORIZED AGENT OF THE OWNER OF THE ABOVE DESCRIBED PROPERTY. FURTHER, I ACKNOWLEDGE THE FILING OF THIS APPLICATION AND CERTIFY THAT ALL OF THE ABOVE INFORMATION IS TRUE AND ACCURATE. (If an agent is to be authorized, execute an affidavit of authorization and include the affidavit with this application.) DATE: SIGNATURE: Please contact Planning Division Staff with any questions. OWNER CERTIFICATION FORM NO DPL-01 SACWireless Site Address: 2379 Durham Dayton Hwy Durham CA 95938 julie.warden@sacw.com 333 University Ave, Suite 200, Sacramento, CA 95825 R & R DURHAM LLC 530-592-5141 South Durham - Verizon Cell Tower 900 sq ft GI General Industrial Plant and store Same Processing plant/ store 90' cell tower 6/30/2023 SACWireless - Julie Warden julie.warden@sacw.com 3441 Roning Ave Chico CA 95938 2379 DURHAM-DAYTON Hwy Durham CA 95938 THIS PROJECT IS A VERIZON WIRELESS UNMANNED TELECOMMUNICATION WIRELESS FACILITY. Toni Vanella, tvanellafarmstore@gmail.com Julie Warden 040-200-091-000 541-510-7178541-510-7178541-510-7178 541-510-7178 Introduction Operational Statement Proposed Verizon Wireless Facility 2379 Durham Dayton Hwy Durham CA 95938 Butte County APN: 029-070-060-000Verizon Wireless proposes a new wireless facility at the corner of Highway 99 and Nelson, in the city of Oroville and the County of Butte. This facility will enhance and expand the Verizon Wireless network in order to improve communication service for its existing customers, as well as emergency services. Public Safety and Community Benefits Wireless Communication has become increasingly important way of life and a way of conducting business. With the increased use of “smart phones”, and data speeds have become increasingly important to Verizon's customers. Verizon's customers rely on smartphones and devices to have immediate access to make phone calls, text, email, and access the Internet wherever they are. Wireless Devices, such as cell phones, have become a common tool used to contact public safety personnel, and loved ones in the event of a crisis. Having increased wireless service in this area will benefit those in emergency situations to reach out for help. Coverage CapacityVerizon Wireless Performance Engineers have determined that there is a significant gap in coverage and capacity in this particular area of Butte County. The coverage maps are attached showing a need for additional coverage in this area. The objective of this site is to provide RAN Capacity Metro Root service for the area. The site lies entirely within the jurisdiction of Butte County. The surrounding area is primarily flat Agricultural zoned parcels to the East and South and Industrial to the North and West. Aesthetics The site will be accessed from the public Public ROW, Durham Dayton Hwy. We are proposing a new monopole on a "General Industrial" zoned parcel to meet the 3 carrier requirement of Butte County. The TWELVE (12) antennas are proposed in three sectors at the top center line of 86'. Verizon's equipment will be located on the ground on a 30'x30'' lease area on the South end of the parcel. This is an approve-able use with a Minor Use permit on a "General Industrial zoned parcel. Compliance with FCC Standards This project will comply with all FCC rules and regulations and will be in accordance with Verizon Wireless’ FCC License to operate radio frequencies. Construction Verizon Wireless will comply with all applicable regulations regarding the construction of the proposed site. Property Owner Information R & R DURHAM LLC VANELLA FARMS tvanellafarmstore@gmail.com 530-592-3801 3441 Roning Ave. Chico CA 95938 Applicant Information Julie Warden SAC Wireless, 333 University Ave, Suite 200, Sacramento, CA 95825 C: 541-510-7178 Julie.Warden@sacw.com | www.sacw.com 1 of 2 PROJECT SETTING DESCRIPTION INSTRUCTIONS Applicant Name: _________________________Project Number: __________________ Please address the following in the space provided. Attach a separate sheet of paper, if needed: 1.Identify any applicable proposed development schedule, including anticipated, incremental, or phased development and all associate projects. 2.List and describe any other related permits and other public approvals required for this project, including those required by city, regional, state and federal agencies. 3.Describe the site as it exists before the project, including information on topography, soil stability, plants, animals, and any cultural, historical, or scenic aspects. Describe any existing structures on the site and the use of the structures. Butte County Department of Development Services PLANNING DIVISION 7 County Center Drive, Oroville, CA 95965 Planning Center Phone 530.552.3701 Fax 530.538.7785 dsplanning@buttecounty.net FORM NO DPL-04 2 of 2 5.Include any special studies prepared for the project site including, but not limited totraffic, biology, wetlands delineation, archaeology, etc. Please contact Planning Division Staff with any questions. An EME report and a coverage map report will be included in the application. The proposed Tower will have no affect on the Traffic in the area. 4. Describe the surrounding properties, including information on plants, animals and any cultural, historical, or scenic aspects. Indicate the type of land use (residential, commercial, etc.), intensity of land use (one-family, apartment houses, shops, department stores, etc.), ontage, setback, rear yard, etc.). The Surrounding parcels are zoned General Industrial and approved for small business. This Message Is From an External Sender This message came from outside your organization. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. From:Johnson, Uriah To:Julie Warden Subject:RE: Zoning Submittals - Verizon Wireless Date:Monday, June 26, 2023 3:45:15 PM Attachments:image001.png Julie, I wouldn’t necessarily classify it as asking for approval. But you need to notify them of the intention of putting a cell tower in a location where they doing a lot of low flying for crops. I suppose the companies could protest the project if they felt it was going to interfere with their business or be a safety issue since the crop duster planes are flying very low and making quick turns. Historically our department has not been involved in a lot of these situations, so I wouldn’t say there is necessarily a template for the letter. But we do need proof that you have notified these companies of your intentions to get a permit for these two locations. Something else you might want to look into is the minimum parcel size, I think the Hwy 99 parcel is only 1.7 acres. In Agriculture zones, the minimum size of a parcel on which a facility may be located shall be ten (10) acres. Uriah Johnson Deputy Agricultural Commissioner Butte County Department of Agriculture 316 Nelson Ave. Oroville CA, 95965 530-552-4091 From: Julie Warden <Julie.Warden@sacw.com> Sent: Monday, June 26, 2023 3:18 PM To: Johnson, Uriah <ujohnson@buttecounty.net> Subject: RE: Zoning Submittals - Verizon Wireless I am so sorry – this is my first Butte County submittal Can you please dumb this down for me – I need to send the drawings to all the people on this list and ask for approval? Thanks! Julie Warden SAC Wireless, 333 University Ave, Suite 200, Sacramento, CA 95825 C: 541-510-7178 Julie.Warden@sacw.com | www.sacw.com .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. From: Johnson, Uriah <ujohnson@buttecounty.net> Sent: Monday, June 26, 2023 3:13 PM To: Julie Warden <Julie.Warden@sacw.com> Subject: RE: Zoning Submittals - Verizon Wireless Julie, Attached is a list of the registered aerial applicators in Butte County. A letter notifying them of the proposed facilities and locations is required. I will review the zoning ordinance for any other requirements in regards to the projects Julie, Attached is a list of the registered aerial applicators in Butte County. A letter notifying them of the proposed facilities and locations is required. I will review the zoning ordinance for any other requirements in regards to the projects being in Agricultural zones. Uriah Johnson Deputy Agricultural Commissioner Butte County Department of Agriculture 316 Nelson Ave. Oroville CA, 95965 530-552-4091 From: Julie Warden <Julie.Warden@sacw.com> Sent: Monday, June 26, 2023 3:03 PM To: Johnson, Uriah <ujohnson@buttecounty.net> Subject: Zoning Submittals - Verizon Wireless Hi Uriah – I understand these zoning drawings need to be submitted to you prior to submitting to Butte County? Your help in understanding the process is Greatly appreciated. Thanks! Julie Warden SAC Wireless, 333 University Ave, Suite 200, Sacramento, CA 95825 C: 541-510-7178 Julie.Warden@sacw.com | www.sacw.com From:Julie Warden To:SUTTERBUTTEDUSTERS@GMAIL.COM; kim@AVAG1.COM; r_d_anderson32@yahoo.com;WILLIAMSAG@DIGITALPATH.NET; cssdjones@yahoo.com Subject:Verizon Cell site proposed cell tower locations Date:Monday, June 26, 2023 4:18:00 PM Attachments:5000918268_HWY 99 AND NELSON_100ZD_NSB_20230608.pdf 5000918266_SOUTH DURHAM_NSB_100ZDs_20230501.pdf I have been asked by Butte county to alert you of the proposal for a new cell tower at these 2 locations. Please review and let me know if you have any questions. Thanks! Julie Warden SAC Wireless, 333 University Ave, Suite 200, Sacramento, CA 95825 C: 541-510-7178 Julie.Warden@sacw.com | www.sacw.com Test Date 60 480 416 Sunny Temp º F 58 30.65 2-4 Muffler Test Location Fuel 0kW 240 Volt 7 Meters 31.5 63 125 250 500 1000 2000 4000 8000 dBA 24.9 50.0 55.5 49.6 55.1 47.5 45.7 41.5 33.9 61.2 25.0 52.0 55.5 50.5 56.5 48.2 50.4 42.3 38.4 61.8 26.8 47.4 52.5 52.1 56.5 51.5 48.3 44.8 35.8 62 24.0 43.4 54.6 48.0 57.2 46.6 46.7 43.6 36.9 61.8 25.2 48.2 54.5 50.0 56.3 48.4 47.8 43.0 36.3 61.7 30 kW 240 Volt 7 Meters Distance Engine Alternator LEFT REAR RIGHT SD030 2.4 Liter Test Request # 30 kW 390 mm 240V 1 Ø Engine Firing Frequency Alt Fan Frequency Cooling Fan Frequency Test ConditionsLevel 2 A Verizon Test Load: Test Load: Octave Band Sound Data SD030 2.4 Liter Diesel Generator Model Enclosure 3/14/2013 OCTAVE BAND CENTER FREQUENCY Wind Speed mph A-2-3738A- T12 MICROPHONE OCTAVE BAND CENTER FREQUENCY Instrument MICROPHONE LOCATION #2 Diesel Standard Waukesha TES1358 Engine Speed 1800 2.4 Liter Generac Diesel Unit Dimensions Distance Barometric Pres FRONT Average SD030   2.4 Liter  Level 2A 31.5 63 125 250 500 1000 2000 4000 8000 dBA 21.7 59.7 54.3 49.1 56.1 47.5 46.5 42.1 34.5 62.7 21.3 58.5 56.4 52.5 55.4 50.7 53.0 44.2 38.8 63.0 24.1 55.9 51.9 53.1 56.7 52.0 48.8 45.0 34.8 62.9 26.6 47.7 53.5 48.8 57.5 47.2 48.1 43.4 37.4 62.6 23.4 55.5 54.0 50.9 56.4 49.4 49.1 43.7 36.4 62.8 Rev 0 Prelim 3/12 RIGHT FRONT Average MICROPHONE LOCATION LEFT REAR 3. Data subject to change without notice 2. Test conducted on a 100 foot diameter asphault surface. GENERAC POWER SYSTEMS, INC 1. All positions at 23 feet (7 meters) from side faces of generator set.FRONTREARRIGHT LEFT AlternatorEngine RadiatorControl Panel 60 60.5 61 61.5 62 62.5 63 63.5 Front Right Rear Left 30 kW No Load DBA   L2A Enclosure  3.4 L NOISE LEVEL OF OUR GENERATOR DOES NOT EXCEED 65 SAC Wireless, a Nokia Company Site Development, Architecture and Engineering, Construction and Commissioning 333 University Ave, Suite 200, Sacramento, CA 95825 www.sacw.com SOUTH DURHAM - ALTERNATIVE SITE ANALYSIS 1 1.BERTAGNA FAMILY TRUST - Almendra Winery and Distillery, 9275 Midway Durham CA 95938 APN 040-234-004-000 a. RF Ranked Candidate as #1, however LL not interested. 2.Hoath Trust Westgate Hardwoods 9296 Midway, Durham CA . 95938 040-200-006-000 a.RF Ranked Candidate #2, however LL not interested 3.DUBOSE DAN M TRUST 2361 DURHAM-DAYTON Hwy, Durham CA 95938 APN 040-200-071-000 a. location does not meet the objective 4.Kidd Jo Anne Trust 8999 HOLLAND Ave, Durham CA 95938 APN 039-250-068-000 " a. No response from LL 5.SLIGHTOM DAVID R & KATHY S ETAL 8834 TAYLOR Ave. Durham CA 95938 APN 038-170-003-000 a. location does not meet the objective