Loading...
HomeMy WebLinkAboutADM23-0012_Application(Permit Requirements – Reverse) 1 of 2 TELECOMMUICATION FACILITY – CO-LOCATION ADMINISTRATIVE PERMIT (BCC 24-184 ET SEQ.) APPLICANT INFORMATION APPLICANT’S NAME PHONE NUMBER ( ) MAILING ADDRESS CITY STATE ZIP CODE E-MAIL PROPERTY INFORMATION PROPERTY OWNER (if different from the applicant) ASSESSOR’S PARCEL NUMBER SITE ADDRESS CITY ZIP CODE ZONING APPROVED UP/MUP # FOR EXISTING COMMUNICATION FACILITY CO-LOCATION DESCRIPTION ACKNOWLEDGEMENT I certify that all of the information submitted is true and correct to the best of my knowledge. I have read and acknowledge the permit requirements as set forth below (page 2) and agree to comply with them. I further understand that should the design of the sign be modified or if the sign expands beyond the requirements of this permit, that I will notify the county to obtain any necessary approvals. APPLICANT’S SIGNATURE DATE STAFF USE ONLY PROJECT NUMBER ADM_____-________ BUILDING PERMIT?  YES  NO  N/A BUILDING PERMIT NUMBER BP_____-_________ EH CLEARANCE  YES  NO  N/A ZONING ADMINISTRATOR APPROVAL DATE Butte County Department of Development Services PLANNING DIVISION 7 County Center Drive, Oroville, CA 95965 Planning Center Phone 530.552.3701 Fax 530.538.7785 dsplanning@buttecounty.net FORM NO PLA-26 2 of 2 PERMIT REQUIREMENTS 1. The installation of co-location facilities allowed requires the issuance of a building permit from the Building Division. The Building Division, based upon engineered calculations submitted by the applicant, may determine that the wireless telecommunications facility cannot safely physicallysuppor the requested co-location facility. If this is the case, the colocation facility allowed on the wireless telecommunications facility shall only be commensurate with what can be safely physically supported by the wireless communications facility, as determined by the Building Division. 2. All equipment shelters, cabinets, or structures utilizied or built in connection with the facilities shall be located within the building being utilized for the facility,or on the ground outside of any setback area. 3. The antennas and array shall be painted to match the color of the existing antennas and pole or tower. 4. Additional facilities shall not extend out horizontally from the pole more than the widest existing projection. The use of proximity designs is encouraged. Approval of this permit is final and effective after 5:00 p.m. on the 10th day following the date the decision is rendered, when no appeal to the decision or call for review has been filed. In the event the completion of appeal period falls on a weekend or County recognized holiday, the decision shall be effective after 5:00 p.m. on the first business day following completion of the appeal period. A permit or approval not exercised within two years after the date of approval shall expire and become void, except wher an extension of time is approved as allowed by BCC §24-247 C. The Zoning Administrator may revoke its approval of this Administrative Permit, if any of the following applies: a. The applicant or property owner has altered the circumstances under which the permit was granted to a degree that one or more of the findings required to grant the original permit can no longer be made; b. Permit issuance was based on misrepresentation by the applicant through the omission of a material statement in the application; c. One or more of the permit conditions of approval have not been complied with or fulfilled; d. The applicant or property owner has failed or refused to allow inspections for compliance; e. Improvements authorized by the permit are in violation of the Zoning Ordinance or any law, ordinace, regulation, or statute; or f. The use is being operated in a manner which constitutes a nuisance. _______________ Applicant’s Initials