HomeMy WebLinkAboutTPM20-0006 ZA Approval Letter Department of Development Services Paula M. Daneluk, AICP, Director Curtis Johnson, Assistant Director 7 County Center Drive T: 530.552.3700 Oroville, California 95965 F: 530.538.7785 buttecounty.net/dds
October 18, 2023 Dan Vrijmoet danvrij@gmail.com
42091 McKenzie Highway
Springfield, OR 97478 Re: Zoning Administrator Approval – TPM20-0006 (Vrijmoet); APN: 056-240-038
Dear Mr. Vrijmoet: Your request for a Tentative Parcel Map was approved at the Zoning Administrator meeting on October 18, 2023. Please note corrections to the condition set (#3 Mitigation BIO-2 and #27 Cal-Trans) Should you desire to appeal the decision of the Zoning Administrator, you must do so in
writing, before 4:00 p.m., Monday, October 30, 2023, to the following:
Department of Development Services Planning Division 7 County Center Drive
Oroville, California, 95965
The appeal fee of $761.43 must be paid at that time. If you do not appeal within the 10 calendar-day appeal period, the action of the Zoning Administrator is final. Once the approval has become final, please contact the Butte County Public Works Department to complete the conditions of approval and record the Parcel Map. Public Works is located at 7 County Center Dr., Oroville, CA 95965, or can be reached by phone at 530.538.7681.
The conditions of approval for your project must be met within twenty-four (24) months from the date of approval. If the conditions of approval have not been met within this time, your map will expire and become null and void unless a map extension is applied for prior to the expiration of the tentative map (Butte County Code §20-67).
Should you have any questions, please contact me at (530) 552-3685 or by email at
tweems@buttecounty.net between 8:00 a.m. and 4:00 p.m., Monday through Friday. Sincerely,
Tristan “Ernest” Weems, AICP, Senior Planner
CC: Wes Gilbert, Mike Evans “Evans Fun Works”
ATTACHMENT A: ZONING ADMINISTRATOR DETERMINATION WITH CONDITIONS OF APPROVAL
BUTTE COUNTY ZONING ADMINISTRATOR DECISION ZDN23-0015 TENTATIVE PARCEL MAP TPM22-0006
(Dan Vrijmoet)
Dan Vrijmoet is requesting approval of a Tentative Parcel Map to subdivide one parcel of
approximately 96 acres, zoned FR-5 (Foothill Residential with a 5-acre minimum), into four lots (9.9,
9.6, 7.5 and 70-acres, respectively). The property is represented by Assessor Parcel Number 056-240-
038. Parcels 1-3 would be located on the west side of State Highway 32. Parcel 4 would be located
on the east side of State Highway 32 and on the east and west side of Stage Road. A portion of Parcel
4 would remain located between the State Highway 32 and Stage Road. The project parcel is currently
undeveloped. Wastewater disposal on would be provided by individual on-site septic systems.
Domestic water service would be provided by new wells on each parcel. Access to Parcels 1-3 would
be via a private road from State Highway 32. Access to Parcel 4 would be via Stage Road.
APN 058-240-038
October 18, 2023
I. In compliance with Section 15073(a), the Zoning Administrator adopts the Initial
Study/Mitigated Negative Declaration (IS/MND).
II. Approves Tentative Parcel Map TPM22-0006 for Dan Vrijmoet, subject to the conditions found in Exhibit “A” and the following findings:
A. The proposed map is consistent with the FR-5 zone.
Proposed lots for the FR-5 meet minimum parcels sizes and will support single-family
residential development, consistent with purpose and allowed uses in the FR-5 zone (BCC
§24-18A).
B. The project is substantially consistent with applicable Goals and Policies of the Butte
County General Plan based on the consistency review in the staff report. In addition, there
is no substantial evidence in the whole record to support any of the findings in Government
Code Section 66474 requiring denial of the tentative parcel map.
C. The design and improvements of the proposed parcel map are consistent with County standards and policies provided all conditions of project approval are met.
Comments / conditions received from Butte County Departments and other Agencies were
reviewed and incorporated into the project analysis and proposed project conditions.
Design and improvements of the Proposed Parcel Map are consistent with County
standards and policies.
D. The project site is physically suitable for the use and density of the proposed development.
The Proposed Parcel sizes are consistent with the minimum parcel size requirement of the FR-5 (5.0-acre minimum) zone.
E. The design and improvements of the project will not conflict with easements acquired by the public at large for access through or use of property within the proposed parcel map provided the attached conditions are met.
No easements will be abandoned with the proposed TPM.
F. The project site is not located within an earthquake fault zone.
The Cleveland Hill fault is the only known active fault within Butte County and it is located
approximately 20 miles to the south.
G. Approval of this project will not be detrimental to the public health, safety, and welfare provided the required conditions and mitigation measures are complied with.
No adverse or detrimental effects to the environment or public health, safety, and welfare
have been identified as resulting from the project, from agency and departmental review,
or from staff analysis.
H. The roads in the project area have the capacity to handle the increase in vehicular traffic generated by the project.
The addition of up to 8 new residential dwellings would have a negligible effect on local
or regional traffic.
Approved By: Curtis Johnson, Zoning Administrator
Date: October 18, 2023
EXHIBIT A Tentative Parcel Map for Dan Vrijmoet on APN 058-240-038, File # TPM22-0006: The applicant is requesting a Tentative Parcel Map to subdivide an approximately 96-acre property located in the FR-5 zone into four parcels. Parcel 1 (9.9 acres), Parcel 2 (9.6 acres), Parcel 3 (7.5 acres) and Parcel 4 (70 acres). Proposed Parcels1-3 will have access via a private road off of State Highway 32, Parcel 4 will
have access of County maintained Stage Road. Wastewater will be provided by onsite individual
waste water systems (septic tank and leach field). Water will be provided by private wells.
I. Conditions of Approval: Planning Division:
1. Mitigation Measure AIR-1
The following best practice measures to reduce impacts to air quality shall be incorporated by the
project applicant, subject property owners, or third-party contractors during construction activities on
the project site. These measures are intended to reduce criteria air pollutants that may originate from
the site during the course of land clearing and other construction operations.
Diesel PM Exhaust from Construction Equipment and Commercial On-Road Vehicles Greater than
10,000 Pounds
• All on- and off-road equipment shall not idle for more than five minutes. Signs shall be posted
in the designated queuing areas and/or job sites to remind drivers and operators of the five-
minute idling limit.
• Idling, staging and queuing of diesel equipment within 1,000 feet of sensitive receptors is
prohibited.
• All construction equipment shall be maintained in proper tune according to the manufacturer’s
specifications. Equipment must be checked by a certified mechanic and determined to be
running in proper condition before the start of work.
• Install diesel particulate filters or implement other CARB-verified diesel emission control
strategies.
• Shall not operate a diesel-fueled auxiliary power system (APS) to power a heater, air
conditioner, or any ancillary equipment on that vehicle during sleeping or resting in a sleeper
berth for greater than 5 minutes at any location when within 100 feet of a restricted areas.
• To the extent feasible, truck trips shall be scheduled during non-peak hours to reduce perk
hour emissions.
Operational TAC Emissions
• All mobile and stationary Toxic Air Contaminants (TACs) sources shall comply with
applicable Airborne Toxic Control Measures (ATCMs) promulgated by the CARB
throughout the life of the project (see http:www.arb.ca.gov/toxics/atcm/atcm.htm).
• Stationary sources shall comply with applicable District rules and regulations.
Fugitive Dust
Construction activities can generate fugitive dust that can be a nuisance to local residents and
businesses near a construction site. Dust complaints could result in a violation of the District’s
“Nuisance” and “Fugitive Dust” Rules 200 and 205, respectively. The following is a list of measures
that may be required throughout the duration of the construction activities:
• Reduce the amount of the disturbed area where possible.
• Use of water trucks or sprinkler systems in sufficient quantities to prevent airborne dust from
leaving the site. An adequate water supply source must be identified. Increased watering
frequency would be required whenever wind speeds exceed 15 mph. Reclaimed (non-potable)
water should be used whenever possible.
• All dirt stockpile areas should be sprayed daily as needed, covered, or a District approved
alternative method will be used.
• Permanent dust control measures identified in the approved project revegetation and landscape
plans should be implemented as soon as possible following completion of any soil disturbing
activities.
• Exposed ground areas that will be reworked at dates greater than one month after initial
grading should be sown with a fast-germinating non-invasive grass seed and watered until
vegetation is established.
• All disturbed soil areas not subject to re-vegetation should be stabilized using approved
chemical soil binders, jute netting, or other methods approved in advance by the Butte County
Air Quality Management District.
• All roadways, driveways, sidewalks, etc. to be paved should be completed as soon as possible.
In addition, building pads should be laid as soon as possible after grading unless seeding or
soil binders are used.
• Vehicle speed for all construction vehicles shall not exceed 15 mph on any unpaved surface
at the construction site.
• All trucks hauling dirt, sand, soil, or other loose materials are to be covered or should maintain
at least two feet of freeboard (minimum vertical distance between top of load and top of trailer)
in accordance with local regulations.
• Install wheel washers where vehicles enter and exit unpaved roads onto streets, or wash off
trucks and equipment leaving the site.
• Sweep streets at the end of each day if visible soil material is carried onto adjacent paved
roads. Water sweepers with reclaimed water should be used where feasible.
• Post a sign in prominent location visible to the public with the telephone numbers of the
contractor and the Butte County Air Quality Management District - (530) 332-9400 for any
questions or concerns about dust from the project.
All fugitive dust mitigation measures required should be shown on grading and building plans. In
addition, the contractor or builder should designate a person or persons to monitor the dust control
program and to order increased watering, as necessary, to prevent transport of dust offsite. Their duties
shall include holidays and weekend period when work may not be in progress. The name and
telephone number of such persons shall be provided to the District prior to land use clearance for map
recordation and finished grading of the area.
Please note that violations of District Regulations are enforceable under the provisions of California
Health and Safety Code Section 42400, which provides for civil or criminal penalties of up to $25,000
per violation.
Plan Requirements: The note shall be placed on a separate document which is to be recorded
concurrently with the map or on an additional map sheet. This note shall also be placed on all building
and site development plans.
Timing: Requirements of the condition shall be adhered to throughout all grading and construction
periods.
Monitoring: The Butte County Department of Development Services and the Public Works
Department shall ensure that the note is placed on a separate document which is to be recorded
concurrently with the map or on an additional map sheet. Building inspectors shall spot check and
shall ensure compliance on-site. Butte County Air Pollution Control District inspectors shall respond
to nuisance complaints.
2. Mitigation Measure BIO-1
If project construction activities, including ground disturbance or vegetation removal occur during the
nesting season for birds protected under the Migratory Bird Treaty Act (MBTA) and California
Department Fish & Game Code (CDFC) (approximately February 1 – August 31), the project
proponent shall retain a qualified biologist to perform preconstruction surveys for nesting bird species.
Surveys to identify active bird nests shall be conducted within and 250 feet around the footprint of
proposed construction site. The survey shall be conducted within 7 days prior to the initiation of
construction activities. In the event that an active nest is observed, a species protection buffer shall be
established. The species protection buffer will be defined by the qualified biologist based on the
species, nest type and tolerance to disturbance. Construction activity shall be prohibited within the
buffer zones until the young have fledged or the nest fails. Nests shall be monitored by a qualified
biologist once per week and a report submitted to the Butte County Department of Development
Services.
Plan Requirements: Perform protocol-level surveys for migratory birds protected by the California
Department Fish & Game Code and the Migratory Bird Treaty Act. This measure shall be recorded
on an additional map sheet to the Parcel Map.
Timing: Requirements of the condition shall be adhered to prior to and during construction activities
planned to occur during nesting seasons for CDFC and MBTA species (between February 1 and
August 31).
Monitoring: The Butte County Department of Development Services and the Public Works
Department shall ensure that the note is recorded an additional map sheet of the Parcel Map.
Department of Development Services shall ensure the condition is met at the time of construction
activities.
3. Mitigation Measure BIO-2
Place the following note to be recorded on an additional map page of the Parcel Map that states:
“Prior to any development activity or the issuance of any permit or approval removing or
encroaching upon oak trees on the project site (this generally includes the canopy drip-line of
trees within the area of ground disturbance and trees subject to changes in hydrologic regime),
the applicant/developer shall complete one of the following measures to the satisfaction of the
Director of Development Services or is/her designee:
A. An Oak Tree Evaluation Plan shall be prepared for areas that are proposed for
development (e.g., dwelling, accessory structures, yards, driveways) by a qualified
professional having experience in California Oak Woodlands and is either a certified arborist,
qualified wildlife biologist or registered professional forester shall be submitted for review
and approval by the Director of Development Services or his/her designee that includes the
following:
1) A survey showing the location of oak trees 5 inches or more in diameter at
breast height, as defined by PRC §21083.4(a);
2) The removal of all oak trees 5 inches or more in diameter at breast height shall
be mitigated. It shall be mitigated by one or more of the following: replanting
and maintaining oak trees, establishing conservation easements, contributing
funds for off-site oak woodlands conservation, and/or other mitigation
measures developed by Butte County. Replanting oak trees cannot account for
more than one-half of the mitigation. Replanted oak trees shall be maintained
for a period of seven years after they are planted. If any of the replanted oak
trees die or become diseased, they shall be replaced and maintained for seven
years after the new oak trees are planted;
3) A replanting schedule and diagram for trees removed or encroached upon by
permit activities consistent with PRC §21083.4(b)(2), applicable mitigation
measures, and Butte County Ordinance, if any, shall be submitted to and
approved by the Director of Development Services or his/her designee.
Replanted trees shall be planted in areas deemed appropriate by the Plan,
considering future lot development, interference with foundations, fencing,
roadways, driveways, and utilities. Trees planted shall be protected from
livestock and other animals;
4) Oak Tree protection measures for trees to be retained within the project site
shall be included in construction specifications. Prior to construction or surface
disturbance, a protective fence or brightly colored staked boundary shall be
placed 5 feet beyond the established critical rooting zone (CRZ) of the oak or
group of oaks being protected. A warning sign shall be prominently displayed
on each fence. The sign should be a minimum of 16 x 24 inches, brightly
colored and be clearly visible, even from vehicles. The sign must clearly
indicate that the CRZ is a restricted area. Orange safety triangles may suffice
if other signage cannot be constructed. A high visibility plastic mesh fence is
recommended to maximize the visibility of protected tree areas. Wire with
bright-colored flags placed at equal intervals can also be a suitable barrier so
long as it maintains high visibility. Protective fencing shall remain in place
until final inspection by the qualified professional. No vegetation removal, soil
disturbance, or other development activities shall occur within the tree zone in
order to protect root systems and minimize compaction of the soil, unless
authorized by Oak Tree Mitigation Plan; and
5) Conservation easements or funds for off-site oak woodlands conservation shall
be proposed to and approved by the Director of Development Services or
his/her designee; or
B. Provide proof of compliance with the adopted Butte County Oak Woodland Mitigation
Ordinance currently under preparation; or
C. Provide proof of compliance with all required avoidance and minimization measures,
and payment of all applicable fees to mitigate for blue oak woodland impacts as provided in
the Butte Regional Conservation Plan, as adopted by Butte County.
Plan Requirements: No vegetation removal, grading, road construction, or other earthwork resulting
in the removal or encroachment upon oak trees on the project site shall be permitted until the
mitigation measure is satisfied by the applicant/developer completing one of the specified measures
to the satisfaction of the Director of Development Services or their designee.
Timing: Requirements of the condition shall be satisfied prior to any development activity or the
issuance of any grading, building, or the approval of any improvement plans on the parcels.
Monitoring: The Butte County Department of Development Services and Department of Public
Works shall ensure that the note is placed on a separate document which is to be recorded concurrently
with the map or on an additional map sheet. At the time of building permit application, the
Development Services Department will reference this requirement on any grading, or building permit
site plans and verify that an Oak Tree Mitigation Plan has been submitted to and approved by the
Director of Development Services or his/her designee. Butte County building inspectors shall ensure
compliance on-site.
4. Mitigation Measure CUL-1
If grading activities reveal the presence of prehistoric or historic cultural resources (i.e., artifact
concentrations, including arrowheads and other stone tools or chipping debris, cans glass, etc.;
structural remains; or human skeletal remains) work within 50 feet of the find shall immediately cease
until a qualified professional archaeologist can be consulted to evaluate the find and implement
appropriate mitigation procedures. If human skeletal remains are encountered, State law requires
immediate notification of the County Coroner (530.538.7404). If the County Coroner determines that
the remains are in an archaeological context, the Native American Heritage Commission in
Sacramento shall be notified immediately, pursuant to State Law, to arrange for Native American
participation in determining the disposition of such remains. The provisions of this mitigation shall
be followed during construction of all improvements, including land clearing, road construction,
utility installation, and building site development.
Plan Requirements: This note shall be placed on a separate document which is to be recorded
concurrently with the map or on an additional map sheet and shall be shown on all site development
and building plans.
Timing: This measure shall be implemented during all site preparation and construction activities.
Monitoring: The Department of Development Services and/or Public Works Department shall
ensure the note is placed on a separate document which is to be recorded concurrently with the map
or on an additional map sheet. Should cultural resources be discovered, the landowner shall notify the
Planning Division and a professional archaeologist. The Planning Division shall coordinate with the
developer and appropriate authorities to avoid damage to cultural resources and determine appropriate
action. State law requires the reporting of any human remains.
5. Mitigation Measure NOI-1
To reduce construction-generated noise the developer shall implement the following measures to mitigate construction noise throughout all construction periods:
1. Construction activities shall not take place during the following hours: Sunset to sunrise on
weekdays and non-holidays; Friday commencing at 6:00 p.m. through and including 8:00
a.m. as well as not before 8:00 a.m. on holidays; Saturday commencing at 6:00 p.m. through
and including 10:00 a.m. on Sunday; and Sunday after the hour of 6:00 p.m.
2. Use best available noise suppression devices and properly maintain and muffle diesel
engine-driven construction equipment.
3. Construction equipment shall not be idled for long periods of time.
4. Locate stationary equipment as far as possible from sensitive receptors.
5. Designate a Disturbance Coordinator and post the name and phone number of this person
conspicuously at the entrance(s) to the project site so it is clearly visible to nearby residents
most likely to be affected by construction noise. This person would manage complaints
resulting from construction noise. The Disturbance Coordinator shall contact noise sensitive
receptors and advise them of the schedule of construction.”
Plan Requirements: The measure shall be placed on an additional map sheet which is to be
recorded with the Parcel Map. This note shall also be placed on all building and site development
plans.
Timing: The mitigation shall be applicable during all construction activities.
Monitoring: The developer and the Disturbance Coordinator shall be responsible for ensuring
compliance with this mitigation and shall respond to all complaints of noise. Department of
Development Services shall investigate all complaints of excess construction-related noise.
Environmental Health Division:
Conditions to be met prior to final map being recorded:
6. Parcel Map must show Minimum Useable Wastewater Area (MUWA) of 12,000 square feet
for standard gravity system for each resultant parcel 1, 2, 3 and 4 per PREAP21-0089.
7. Parcel Map must show proposed water well locations showing a minimum of 100-foot
setback to MUWA.
8. Prove water adequacy by drilling at least one well within the division at a location approved
by the County Health Department which will produce a flow of not less than five (5) gallons
per minute if tested during the period from January 1 through June 30 or not less than three
(3) gallons per minute if tested during the period from July 1 through December 31. The well
log and/or an approved pump test certifying to the flows shall be reviewed by the County
Health Department before filing of the final map. Existing on-site well can be used to
determine water adequacy by providing a pump test.
9. Prove water quality by providing a water sample for total and fecal coliform and nitrate.
Butte County Fire Department:
10. Construction, installation, or development of buildings and/or roads, driveways, gates and
bridges on parcels/lots shall comply with current adopted California Building Standard
Codes, the California Fire Safe Regulations—Public Resources Code 4290, 4291 and current
Butte County Improvement Standards, whichever is stricter.
11. Prior to building construction, provide an all-weather access road, 20 foot wide that will
allow for ingress and egress and accommodate a 75,000-pound fire apparatus.
12. Place a note on a separate document, which is to be recorded concurrently with the Parcel or
Final map, or on an additional map sheet stating, “Building identification and/or addresses
shall be installed in conformance with Public Resources Code 4290 and shall be posted at
the time of permit issuance and maintained continuously thereafter.
Butte County Public Works:
A. STREETS
13. Prior to the recordation of the final map, provide a fully executed road maintenance agreement (RMA) for all non-publicly maintained access roads on the county-approved form. A note shall be placed on a separate document which is to be recorded concurrently with the map or
on an additional map sheet of the final map stating: "In accordance with Civil Code Section
845, maintenance of the road as shown hereon shall be shared by those properties with a legal
interest in it." Prior to the recordation of the final map, the developer must establish an RMA or other entity approved by the Public Works Director for the maintenance of roads.
14. Prior to the recordation of the parcel map, the location of driveway access points for Parcel 4 onto Stage Road shall be approved by the Department of Public Works and shown on the Parcel Map. Adequate site distance shall be demonstrated prior to the recordation of the Parcel Map.
15. Prior to the recordation of the parcel map, provide street name signs per requirements of the
Department of Public Works for the new private road providing access to resulting Parcels 1, 2, and 3. A minimum of five alternate names for each new street shall be submitted on the approved form and reviewed by the county address coordinator. One name for the new roadway will then be recommended to the Board of Supervisors for approval prior to the
recordation of the parcel map.
16. Prior to the recordation of the parcel map, deed to Butte County in fee simple the 60-foot-wide strip of right-of-way (30 feet of right-of-way from the physical centerline on both sides of the roadway) of Stage Road along the entire property frontage of Parcel 4.
17. Prior to the recordation of the Parcel Map, relinquish the abutter's rights of access to Butte
County along the Stage Road frontage of Parcel 4 except at approved driveway access points.
18. Prior to the recordation of the parcel map, provide approved access to each parcel being created. Construct or provide a performance, labor, and material bond for the construction of interior roads in conformance with county improvement standard RS-8 LD-II, 20 feet wide with 4″ of class II aggregate base and single seal coat. Submit road and drainage plans to the
Department of Public Works for approval prior to the start of construction.
19. Prior to the issuance of building or development permits, obtain an encroachment permit and construct the standard S-18B road approach and drainage improvements in accordance with county improvement standards. Right-of-way required for construction of road approach and roadside drainage shall be provided. Roadway drainage improvement shall be constructed
along the Stage Road for the frontage of Parcel 4 which has not been identified on the Parcel
Map as a driveway access area. 20. Provide a cul-de-sac or building-free turnaround area
designed and constructed as specified in the county improvement standards.
21. The parcel map shall show the cul-de-sac or building-free turnaround area.
22. Prior to the final road inspection, install all necessary traffic safety signs including stop signs.
B. COMPLIANCE WITH BUTTE COUNTY STORMWATER ORDINANCE
23. Coverage under the stormwater Construction General Permit (CGP) will be required by the State Water Resources Control Board if the project results in ground disturbance, including clearing, excavation, filling, and grading of one or more acres or disturbs less than one acre but are part of a larger common plan or development. Coverage under this General Permit
must be obtained from the State Water Resources Control Board prior to starting construction.
If coverage under the CGP is required, engineering plans shall show the Waste Discharge Identification (WDID) number on the title sheet of the plans and a copy of Storm Water Pollution Prevention Plan (SWPPP) shall be provided to the Land Development Division of the Public Works Department. Submit with improvement or grading plans the estimated areas
to be disturbed to the Department of Public Works for consistency with the SWPPP. Additionally, place a note on a map sheet that states: “The development of this parcel (or subdivision) map required coverage under the Stormwater Construction General Permit.
Construction activities that result in a land disturbance of less than one acre, but which are part of a larger common plan of development, also require coverage under this permit.
Development of individual lots may require an additional permit coverage.”
C. PARCEL MAP
24. Show all easements of record on the parcel map.
25. Prior to recordation of the parcel map, pay in full all delinquent, current and estimated taxes
and assessments as specified in Article 8 of Chapter 4 of Division 2 of Title 7, of the California
Government Code commencing with Section 66492.
26. Pay the recording fees in effect at the time the parcel map and related documents are
recorded.
Cal Trans:
27. Encroachment Permit: Any project or work, including access modification and drainage
work, that takes place along or within the State’s ROW requires an encroachment permit
issued by Caltrans. make sure some slopes cut back, adequate sight distance needs to be
showed for all driveways, show embankment, strapping striping modification, and a stop
sign or fog line. These changes will also align the encroachment permitting program
business processes with Caltrans’s Strategic Management Plan values of Engagement,
Equity, and Innovation. To apply, a completed encroachment permit application,
environmental documentation, and five sets of plans clearly indicating State ROW must be
submitted to:
Hikmat Bsaibess
California Department of Transportation District 3, Office of Permits
703 B Street
Marysville, CA 95901
II. NOTATION A. Minor changes may be approved administratively by the Directors of Development Services,
Environmental Health, or Public Works upon receipt of a substantiated written request by the
applicant, or their respective designee. Prior to such approval, verification shall be made by each Department or Division that the modification is consistent with the application, fees paid and environmental determination as conditionally approved. Changes deemed to be major or significant in nature shall require a formal application for amendment.