Comments:
The project is a proposed new telecommunication facility at 1527 16th Street in the sphere of influence of Oroville within the Thermalito area. The site is accessed from 16th Street,
a private road on the south side of Grand Avenue, via Grand Avenue, a County-maintained road. The project area is within Flood Zone X, outside the 500-year flood. The project consists
of installing a 95-foot monopole cell tower inside a fenced 2,500 sf compound with appurtenant ground equipment and a 25kW backup diesel powered generator.
Application Completeness:
The project application has been reviewed against the application checklist and is considered incomplete complete.
Other Items Needed Prior to Recommendation for Hearing:
The Public Works Department verifies that secondary access/dead-end road standards have been met. All roads exceeding the State-defined dead-end road lengths must provide legal secondary
access. See Butte County Code of Ordinances 20-133 for standards.
The Public Works Department verifies that the property has legal primary and secondary access (direct access to a publicly maintained road or deeded access to private roads out to
the nearest publicly maintained road).
The Public Works Department has reviewed the sight distance from all proposed driveway and road approaches.
Conditions of Approval
Prior to issuance of improvement permits, obtain an encroachment permit, submit road and drainage improvement plans to the Public Works Department, and improve the existing road approach
at 16th Street and Grand Avenue as specified in County Improvement Standard S-18A and the terms of the encroachment permit.
Coverage under the stormwater Construction General Permit (CGP) will be required by the State Water Resources Control Board if the project results in ground disturbance, including clearing,
excavation,
filling, and grading of one or more acres or disturbs less than one acre but is part of a larger common plan or development that disturbs more than one acre in total. Coverage under
this General Permit must be obtained from the State Water Resources Control Board prior to starting construction. If coverage under the CGP is required, engineering plans shall show
the Waste Discharge Identification (WDID) number on the title sheet of the plans and a copy of Storm Water Pollution Prevention Plan (SWPPP) shall be provided to the Land Development
Division of the Public Works Department. Submit with improvement or grading plans the estimated areas to be disturbed to the Department of Public Works for consistency with the SWPPP.
The access and utility easements shall be submitted to the Public Works Department and fire agency for review and approval of width and turnaround requirements prior to recording. Upon
approval by the Public Works Department and fire agency, and prior to issuance of improvement permits, the easement shall be recorded and a copy of the recorded access deed provided
to the Department of Public Works.
Show all easements of record on the site improvement plans.