Loading...
HomeMy WebLinkAbout12.23.22 Board Correspondence - FW Annual Spill Gate Testing Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:BOS Subject:Board Correspondence - FW: Annual Spill Gate Testing Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. Date:Tuesday, December 27, 2022 8:47:31 AM Please see Board Correspondence below. Shaina Paulsen Associate Clerk of The Board Butte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 T: 530.552.3304 | F: 530.538.7120 -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, December 23, 2022 11:05 AM Subject: Annual Spill Gate Testing Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 12/23/2022, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Annual Spill Gate Testing Report Description: Pacific Gas and Electric Company submits 2022 Annual Spillway Gate Operation Certificate for the DeSabla-Centerville Hydroelectric Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20221223- 5106__;!!KNMwiTCp4spf!GJcoW-x4uC9hBOgm45EfSP3rz8m44-gEj-0NirnV0qMR4__ZmgFOq- eGv7bJ0NzTthmhRkqWsQSgt646hBcFMB7Demk60sXQecfW$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!GJcoW- x4uC9hBOgm45EfSP3rz8m44-gEj-0NirnV0qMR4__ZmgFOq- eGv7bJ0NzTthmhRkqWsQSgt646hBcFMB7Demk60hrkzeYX$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!GJcoW- x4uC9hBOgm45EfSP3rz8m44-gEj-0NirnV0qMR4__ZmgFOq- eGv7bJ0NzTthmhRkqWsQSgt646hBcFMB7Demk60lulWsXr$ or for phone support, call 866-208-3676. Power Generation 77 Beale Street San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 San Francisco, CA 94177 December 23, 2022 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA Philbrook Dam, NATDAM No. CA00345 2022 Annual Spillway Gate Operation Certificate ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: Enclosed is Pacific Gas and Electric Company’s (PG&E) notarized certificate for the 2022 spillway gate operations for the following dam: FERC Project Dam Name Gate Type No. of Gates DeSabla-Centerville Hydroelectric Project, FERC No. 803 Philbrook Dam Radial 1 The certificate (Enclosure 1) is being submitted pursuant to Part 12, Subpart E, Section 12.44(b) of the Federal Energy Regulatory Commission’s (FERC) regulations. Should you have technical questions concerning this matter, please contact Roy Arnold, gates and valves asset management lead engineer for PG&E, at (559) 575-5122. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Annual Spillway Gate Operation Certificates