Loading...
HomeMy WebLinkAbout12.27.22 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific GasFrom:Clerk of the Board To:Bennett, Robin; Boatwright, JP; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Kimmelshue, Tod; Paulsen, Shaina; Pickett,Andy; Reaster, Kayla; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Townsend, Joan Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Tuesday, December 27, 2022 8:49:24 AM Please see Board Correspondence Shaina PaulsenAssociate Clerk of The BoardButte County Administration 25 County Center Drive, Suite 200, Oroville, CA 95965 T: 530.552.3304 | F: 530.538.7120 -----Original Message-----From: 'FERC eSubscription' <eSubscription@ferc.gov>Sent: Friday, December 23, 2022 8:35 AM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 12/23/2022, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection ReportsDescription: Pacific Gas and Electric Company submits Status Update in efforts to address Recommendations 1 and 17 from the 11th 5-year Part 12D Safety Inspection Report for Bucks Storage Dam, part of Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20221223-5040__;!!KNMwiTCp4spf!FgRdIHbW8eFxgjCBaTxr1PcN9O_j3L4Zuh7IZtg7Ds- IkQtBhO2VAt3AL0oxwtOON0XMLacNWDDIYlzXWMS0zgUBkj3eDB_hi7zZ$ To modify your subscriptions, click here:https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!FgRdIHbW8eFxgjCBaTxr1PcN9O_j3L4Zuh7IZtg7Ds- IkQtBhO2VAt3AL0oxwtOON0XMLacNWDDIYlzXWMS0zgUBkj3eDL_71adB$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here:https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!FgRdIHbW8eFxgjCBaTxr1PcN9O_j3L4Zuh7IZtg7Ds-IkQtBhO2VAt3AL0oxwtOON0XMLacNWDDIYlzXWMS0zgUBkj3eDCu_Uiaz$ or for phone support, call 866-208-3676. Power Generation 77 Beale Street San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 San Francisco, CA 94177 December 22, 2022 Via Electronic Submittal (E-file) Frank L. Blackett P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Storage Dam, NATDAM No. CA00332 11th 5-Year Part 12D Safety Inspection Report Status Update for Recommendations 1 and 17 ENCLOSURES CONTAIN CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents an update on the status of Pacific Gas and Electric Company’s (PG&E) efforts to address Recommendations 1 and 17 (R-1 and R-17) from the 11th 5-year Part 12D safety inspection report (dated October 2020) for Bucks Storage Dam, which is part of PG&E’s Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. PG&E submitted its original plans and schedules for addressing R-1 and R-17 in a letter to your office dated December 31, 2020. PG&E requested an extension of time for R-1 in a letter dated on August 31, 2021, and for R-17 in a letter dated December 30, 2021. PG&E's status updates for R-1 and R-17 are provided in Enclosure 1. Drawings 51971 and 51994 (Enclosure 2) are provided in support of PG&E’s status updates, as described in Enclosure 1. Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762-9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosures: CUI//CEII – DO NOT RELEASE 1. Status Update to Address R-1 and R-17 from the 11th Part 12D Safety Inspection Report 2. Bucks Storage Dam Outlet Tower Details, Drawing 51971 and 51994, prepared by Consant Angle Arch Dam Co. and dated 1926