HomeMy WebLinkAbout12.30.22 Board Correspondence - FW Annual Spill Gate Testing Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company,et al.From:Clerk of the BoardTo:BOS
Subject:Board Correspondence - FW: Annual Spill Gate Testing Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company,et al.Date:Friday, December 30, 2022 3:13:55 PM
Please see Board Correspondence below.
Shaina PaulsenAssociate Clerk of The BoardButte County Administration25 County Center Drive, Suite 200, Oroville, CA 95965T: 530.552.3304 | F: 530.538.7120
-----Original Message-----From: 'FERC eSubscription' <eSubscription@ferc.gov>Sent: Friday, December 30, 2022 2:36 PMSubject: Annual Spill Gate Testing Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 12/30/2022, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent)
Docket(s): P-2107-000Lead Applicant: Pacific Gas and Electric CompanyFiling Type: Annual Spill Gate Testing ReportDescription: Pacific Gas and Electric Company submits the 2022 Annual Spillway Gate Operation Certificate for the Poe Dam of the Poe Hydroelectric Project under P-2107.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20221230-5353__;!!KNMwiTCp4spf!HhMux8RUIiawjLd1PgOjnJPamoJ8E9z8ejQFWgnMZaslTJqXXprpgxp0etSwNEqf6_HJCCKe1nzfkm9LVG3IDBUL4zMnV3aCUrKK$
To modify your subscriptions, click here:https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!HhMux8RUIiawjLd1PgOjnJPamoJ8E9z8ejQFWgnMZaslTJqXXprpgxp0etSwNEqf6_HJCCKe1nzfkm9LVG3IDBUL4zMnV-KOHcb6$
------------------------------------------------------------------------Please do not respond to this email.Online help is available here:https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!HhMux8RUIiawjLd1PgOjnJPamoJ8E9z8ejQFWgnMZaslTJqXXprpgxp0etSwNEqf6_HJCCKe1nzfkm9LVG3IDBUL4zMnVzm5Yk_8$or for phone support, call 866-208-3676.
Power Generation
77 Beale Street
San Francisco, CA 94105
Mailing Address:
Mail Code N11D
P.O. Box 770000
San Francisco, CA 94177
December 30, 2022
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: Poe Hydroelectric Project, FERC No. 2107
Poe Dam, NATDAM No. CA00328
2022 Annual Spillway Gate Operation Certificate
ENCLOSURES CONTAIN CUI/CEII – DO NOT RELEASE
Dear Frank L. Blackett:
Enclosed is Pacific Gas and Electric Company’s (PG&E) notarized certificate for the 2022
spillway gate operations for the following dam:
FERC Project Dam Name Gate Type No. of
Gates
Poe Hydroelectric Project, FERC No. 2107 Poe Dam Radial 5
The certificate (Enclosure 1) is being submitted pursuant to Part 12, Subpart E, Section
12.44(b) of the Federal Energy Regulatory Commission’s (FERC) regulations. In accordance
with Chapter 14, Appendix L, of the FERC guidelines, the amperage readings and apparent
trends are provided in Enclosure 2 and phase current and voltage plots are provided in
Enclosure 3 of this letter.
Should you have technical questions concerning this matter, please contact Roy Arnold, gates
and valves asset management lead engineer for PG&E, at (559) 575-5122. For general
questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosures: CUI/CEII – DO NOT RELEASE
1. Annual Spillway Gate Operation Certificate
2. Summary of the Amperage Readings and Apparent Trends
3. Phase Current and Voltage Plots