Loading...
HomeMy WebLinkAbout12.30.22 Board Correspondence - FW Annual Spill Gate Testing Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company,et al.From:Clerk of the BoardTo:BOS Subject:Board Correspondence - FW: Annual Spill Gate Testing Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company,et al.Date:Friday, December 30, 2022 3:13:55 PM Please see Board Correspondence below. Shaina PaulsenAssociate Clerk of The BoardButte County Administration25 County Center Drive, Suite 200, Oroville, CA 95965T: 530.552.3304 | F: 530.538.7120 -----Original Message-----From: 'FERC eSubscription' <eSubscription@ferc.gov>Sent: Friday, December 30, 2022 2:36 PMSubject: Annual Spill Gate Testing Report submitted in FERC P-2107-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 12/30/2022, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-2107-000Lead Applicant: Pacific Gas and Electric CompanyFiling Type: Annual Spill Gate Testing ReportDescription: Pacific Gas and Electric Company submits the 2022 Annual Spillway Gate Operation Certificate for the Poe Dam of the Poe Hydroelectric Project under P-2107. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20221230-5353__;!!KNMwiTCp4spf!HhMux8RUIiawjLd1PgOjnJPamoJ8E9z8ejQFWgnMZaslTJqXXprpgxp0etSwNEqf6_HJCCKe1nzfkm9LVG3IDBUL4zMnV3aCUrKK$ To modify your subscriptions, click here:https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!HhMux8RUIiawjLd1PgOjnJPamoJ8E9z8ejQFWgnMZaslTJqXXprpgxp0etSwNEqf6_HJCCKe1nzfkm9LVG3IDBUL4zMnV-KOHcb6$ ------------------------------------------------------------------------Please do not respond to this email.Online help is available here:https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!HhMux8RUIiawjLd1PgOjnJPamoJ8E9z8ejQFWgnMZaslTJqXXprpgxp0etSwNEqf6_HJCCKe1nzfkm9LVG3IDBUL4zMnVzm5Yk_8$or for phone support, call 866-208-3676. Power Generation 77 Beale Street San Francisco, CA 94105 Mailing Address: Mail Code N11D P.O. Box 770000 San Francisco, CA 94177 December 30, 2022 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Poe Hydroelectric Project, FERC No. 2107 Poe Dam, NATDAM No. CA00328 2022 Annual Spillway Gate Operation Certificate ENCLOSURES CONTAIN CUI/CEII – DO NOT RELEASE Dear Frank L. Blackett: Enclosed is Pacific Gas and Electric Company’s (PG&E) notarized certificate for the 2022 spillway gate operations for the following dam: FERC Project Dam Name Gate Type No. of Gates Poe Hydroelectric Project, FERC No. 2107 Poe Dam Radial 5 The certificate (Enclosure 1) is being submitted pursuant to Part 12, Subpart E, Section 12.44(b) of the Federal Energy Regulatory Commission’s (FERC) regulations. In accordance with Chapter 14, Appendix L, of the FERC guidelines, the amperage readings and apparent trends are provided in Enclosure 2 and phase current and voltage plots are provided in Enclosure 3 of this letter. Should you have technical questions concerning this matter, please contact Roy Arnold, gates and valves asset management lead engineer for PG&E, at (559) 575-5122. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosures: CUI/CEII – DO NOT RELEASE 1. Annual Spillway Gate Operation Certificate 2. Summary of the Amperage Readings and Apparent Trends 3. Phase Current and Voltage Plots