Loading...
HomeMy WebLinkAboutFAI15-0050 041-130-044 Butte College Welding Dry Qtr Sprink 6.21.24 Dry Pipe California Code of Regulations -Title 19 Quarterly and 1 of 3 Fire Sprinkler System Inspection, Testing, and Maintenance Annual Report Property Information ��CF Ca�7fiO��F Contractor or Licensed Owner Information 1 Z/ �'z''f 'Building Name Butte College Welding. I i t 15/ Name Voltage Specialists 'Address 3536 Butte Campus Drive I Address 370 Apple Lane I ��. F �` City Paradise St. CA Zip 95969 (City Oroville, CA. (License# 880862 (Phone (530)624-4514 Contact Person Mark Allen I ❑ SFM IJob# Phone (530)893-7590 I ❑■ CSLB 'Misc. Riser Information . Main Drain Test(Annual) M Riser Location Riser Main Drain Initial Static Residual Final Static p F,N/A No. Diameter Diameter Pressure Pressure Pressure 1 Riser room 4" 2" I I I I I I I I I I I I I I I I I I I I I I I I I I I ❑ This building has more than 5 risers. See additional AES 2.9 form attached Number of AES 2.9 forms attached: Quarterly Inspections =Inspection T=Test M=Maintenance P=Pass F=Fail N/A =Not Applicable Mr— Item Description NFPA 25 CA ed. Date _ Date Date Date Reference 03/22/24 6/21/24 1.1 I Control Valves—Identification Sign 13.3.1 P P 1.2 I 'Control Valves—Inspection 13.3.2 I P I P 1.3 I IWaterflow Alarm Devices 5.2.5 I P I P I I 1.4 I 'Supervisory Devices 5.2.5 I P I P I I 5.2.4.2, 5.2.4.3 1.5 I Gauges(Dry Pipe Systems) 5.2.4.4 P P Pass=Normal Pressures 13.4.4.1.2 5.2.4.2, 5.2.4.3 1.6 I Air Pressure 5.2.4.4 1 15 psi 15 psi psi psi 13.4.4.2.5.1 1.7 I Water Supply Pressure 13.4.4.2 5.1 80 psi' 80 psil psil psi 1.8 I Hydraulic Design Information Sign 5.2.6 P P (for hydraulically designed systems) 1.9 I General Information Sign 5.2.8 P P (not required for system prior to 2007 edition of NFPA 13) 1.10 I Heat Tape 5.2.7 N/A I N/A I N/A I N/A 1.11 I Spare Sprinklers 5.2.1.4 P I P I I 1.12 I Fire Department Connections 13.7 P I P I I 1.13 I Dry Pipe Valves—Exterior Inspection 13.4.4.1.4 P P 1.14 I Pressure Reducing Valves 13.5.1 N/A N/A N/A N/A 1.15 Backflow Preventers 13.6.1 P I P I I 1.16 PRV—Fire Sprinkler Systems 13.5.1 N/A I N/A I N/A I N/A Form AES 2.3 Sept.3,2013 Dry Pipe California Code of Regulations -Title 19 Quarterly and 2 of 3 Fire Sprinkler System Inspection, Testing, and Maintenance Annual Report Property Information ff:,�tjr p i Contractor or Licensed Owner Information V1/ 'Building Name Butte College Welding. [ 17'0 Name Voltage Specialists 'Address 3536 Butte Campus Drive '�tN __s � Job# 'City Oroville, CA. �y;7RE tAN'= ANNUAL INSPECTION, TESTING,AND MAINTENANCE Include ALL Quarterly I• • - -•a - - - :., -. • - I = Inspection T =Test M=Maintenance _ P=Pass F=Fail N/A =Not Applicable Item Description NFPA 25 CA ed. Date Comments Only P,F,N/A Reference 1.17 I Buildings(Freeze Protection) 4.1.1.1 Owner's Responsibility 1.18 I Sprinklers 5.2.1 f 1.19 I Pipe and Fittings 5.2.2 l 1.20 I Hangers 5.2.3 1.21 I Seismic Braces 5.2.3 1.22 I Small Hose Connections* 13.5.6.2.2 Field Service Test Required If REQUIRED, Enter'F' until 2.1 T (Send Report to Fire Code Official) 5.3.1 results are returned from Lab 2.2 T Recalled Sprinklers Title 19 If not present=Pass; If present=Fail 904.1(c) Water Flow Alarm Devices 5.3.3 2.3 T 90 sec. maximum - (Enter Time) 13.2.6 sec. 2.4 T Main Drain Test 13.2.5 (Enter data on Page 1 of this form) 13.3.3.4 2.5 T Priming Water Level Test 13.4.4.2.113.4.4 Dry Pipe Valve Trip Test 3.4.4. .2. I I 2.2 2.6 T (Partial trip test is acceptable) 13.4.4.2.2.3 13.4.4.1.5 2.7 T Valve Trip Time 13.4.4.2.5.2 sec. 2.8 T Trip Air Pressure 13.4.4.2.5.1 psi 2.9 T Quick-Opening Device Test 13.4.4.2.4 N/A 2.10 T Low Air Pressure Alarm Test 13.4.4.2.6 2.11 T Low Temperature Alarm Test 13.4.4.2.7 N/A 2.12 T Automatic Air Pressure Maintenance Device Test 13.4.4.2.8 2.13 T Control Valve—Operation 13.3.3 2.14 T Valve Supervisory Devices 13.3.3.5 2.15 T Backflow Preventer Assemblies 13.6.2 N/A 2.16 T PRV—Partial Flow 13.5.1.3 Full flow preformed *Small hose connections are hose valves and optional hose supplied by the fire sprinkler system. They do not include Class I, II, or III standpipe systems. Form AES 2.3 Sept.3,2013 Dry Pipe California Code of Regulations -Title 19 Quarterly and 3 of 3 Fire Sprinkler System Inspection, Testing, and Maintenance Annual Report Property Information ,sue CAS--b,4$. Contractor or Licensed Owner Information (Building Name Butte College Welding. .?„. Name Voltage Specialists 'Address 3536 Butte Campus Drive '1Mj4'S Job# 'City Oroville, CA. 1_ fliE MP AMII ANNUAL INSPECTION, TESTING, AND MAINTENANCE Include ALL Quarterly Inspections(See Quarterly Inspections Page) I = Inspection T =Test M= Maintenance P=Pass F=Fail N/A =Not Applicable NFPA 25 CA ed. Item Description Reference Date Comments Only P,F,N/A 3.1 M Control Valves 13.3.4 3.2 I M (Maintenance I 13.4.4.3 I I I 3.3 I M IDry Pipe Valve Interior Cleaned I 13.4.4.3.1 I I I 3.4 I M (Low Points in System Drained I 13.4.4.3.2 I I I 3.5 I M UBackflow Preventer I 13.6.3 I I I N/A Obstruction Investigation Required Yes 3.6 M (If"Yes" see Deficiencies and Comments Section 14.3 No N/A for Results.) ID 3.7 I M (System Returned to Service I 4.5.3 15.7 I IV YesNo I ❑ D=Deficiency C=Comment (Indicate type) Deficiencies and Comments Indicate all equipment,devices and parts that were repaired or replaced ❑Check here if additional Deficiencies and Comments are listed on Form AES9 Number attached: IIISee Correction Form AES 10 for corrected deficiencies. Number attached: I hereby certify that the fire protection equipment listed above has been fully inspected, tested,and maintained on this date by the company indicated above,in accordance with CCR, Title 19,Sections 901 to 906 and that the equipment is fully operable except as noted in the "Deficiencies and Comments"section of this form. Check box if Annual Inspection, Testing&Maintenance Items are Completed in the Indicated Quarter Quarter 1st ❑ Annual 2nd ❑ Annual 3rd ❑Annual 4th ❑ Annual Date 03/22/24 06/21/24 Print Name 'Wyatt C. Wyatt C. I I Signature I �'� , / Form AES 2.3 Sept.3,2013