Loading...
HomeMy WebLinkAboutB18-0609 PW NOTIFICATION 26-12 B18-0605 B18-0609 Department of Public Works Dennis Schmidt, Director Shawn H. O’Brien, Assistant Director 7 County Center Drive T: 530.538.7681 Oroville, California 95965 F: 530.538.7171 buttecounty.net/publicworks March 29, 2018 YEZBICK, MICHELLE 746 MOSS AVE CHICO, CA 95926 RE: Building Permit No. B18-0605, APN 005-417-016 Dear: YEZBICK, MICHELLE Plans for the above referenced project have been routed to the Department of Public Works for review of compliance with Butte County Code Section 26-12 (available on line at http://municipalcodes.lexisnexis.com/codes/butteco/). Based on our initial review of the information provided, the Department of Public Works has determined that the following items will be required: 1. Drainage plans and calculations shall be submitted to and approved by the Department of Public Works. Engineering plans shall detail existing drainage conditions and specify how storm water runoff will be either detained or retained onsite and/ or conveyed to the nearest natural drainage channel or publicly maintained facility. Engineering calculations shall show there is no increase in peak flow runoff leaving the property. 2. Dedication of 30’ rights-of-way from the physical centerlines of Guill Street and Cleveland Avenue along the entire property frontage. 3. The construction of an enclosure for containers used to hold solid waste and/or recyclable materials for collection. Please submit sufficient information to the Land Development Division of the Public Works Department, 7 County Center Drive, Oroville, CA 95965 that demonstrates compliance with County Code Section 26-12. Submit construction plans and/or engineering analysis in duplicate in accordance with county improvement standards (available on line at http://www.buttecounty.net/publicworks/Services/ImprovementStandards.aspx) along with a $700.00 minimum plan checking deposit. If you have any questions, please contact this office at (530) 538-7266, Monday through Friday, 8:00 a.m. to 4:00 p.m. Sincerely, Eric Schroth, P.E., L.S. Associate Civil Engineer