Loading...
HomeMy WebLinkAboutXB24-2474 INTAKE FORMSBuilding Permit Intake Forms Permit Information and Form(s) Selection Permit Number * APN* Property Address Permit Type Permit SubType Permit Description Property Owner Applicant Email * Select Required Forms* B24-2474 064-340-041 14144 ELMIRA CIR RESIDENTIAL SFD-CUSTOM/MODEL REPL SFD (1283) GAR (472) COVD (221) CAMP FIRE SACH & RO CAPITAL PARTNERS LLC RAVEEN@SACHANDRO.COM ISSUE PERMIT FIRE RESIDENTIAL BUILDING REQUIREMENTS NPDES (<1 Acre) NPDES (>1 Acre) NOTICE TO BUILDERS NOTICE TO BUILDERS FOR OVER-THE-COUNTER PW - 26.12 Environmental Health North Chico Flood Disc Camp Fire Donation Wildfire Notice 9/30/24, 10:33 AM Submission Completed https://eforms.buttecounty.net/Forms/Form/Submit 1/8 Fire Residential Building Requirements To meet the requirements of Government Code Section 51182, Butte County/CAL Fire Department is required to provide the below Building and Site Requirements to a property owner requiring a permit to build. A pre-construction site visit is not needed unless requested by the owner and/or authorized agent (contrator). However, all below requirements need to be satisfied and an on-site inspection completed prior to final permit being issued. Additionally, a plan review of your project will be completed by this office. A review letter will emailed to you using the email address you provided at intake. If no email is provided, a letter will be sent to the address on file. Your property is located within Butte County Fire Department’s jurisdiction and must meet the below Building and Site Requirements: Public Resources Code 4290 (emergency access, signing/addressing, fuel modification, standards) Public Resources Code 4291 (defensible space) California Fire Code LPG tank protection Butte County Improvement Standards More information regarding the above requirements can be found at: https://www.buttecounty.net/fire/FireFacilities/Fire-Marshal 9/30/24, 10:33 AM Submission Completed https://eforms.buttecounty.net/Forms/Form/Submit 2/8 National Pollutant Discharge Elimination System (NPDES) Phase II Construction Storm Water Permit and Storm Water Pollution Prevention Plan (SWPPP) Acknowledgment By signing below, I the project owner/owners’ agent, certify that this project WILL NOT DISTURB 1 acre or more of land and that I therefore, do not need to apply for a Construction Storm Water Permit from the State of California Regional Water Quality Control Board. Phased projects that contain multiple site buildouts of less than one acre but when combined with subsequent phases total more than one acre of disturbed soil will require a Construction Storm Water Permit from the State of California Regional Water Quality Board. 9/30/24, 10:33 AM Submission Completed https://eforms.buttecounty.net/Forms/Form/Submit 3/8 Notice To Builders Before your building permit can be issued, your plans must be checked for compliance with the California Building Codes. In addition, your plans are routed to other regulatory entities including but not limited to Planning, Public Works, Environmental Health, and the California Department of Forestry for their clearances and approvals. There are some things you can do to expedite your permit: Make sure your application is complete. Be responsive to requests from County departments for any additional materials or requirements. The plan check fees collected at permit intake cover up to three reviews. Plan review time beyond the third review will be billed on a time and material basis. The Building Division places its highest priority on processing building permits as quickly as possible and each day that passes without a complete application adds to processing time. Every permit issued by the Building Official shall expire and become null and void if the work authorized by such permit is not started or completed within one year from the date of issuance of such permit (per Butte County Code Chapter 26, Article 1, Section 263.1). A permit may be renewed (for a fee) prior to expiration a maximum of two (2) times, provided construction progress has been documented by the Building Division during each year during scheduled inspections. No changes may be made in the original plans and specifications for such work. In order to reinstate action on a permit after expiration, the permittee shall pay a new full permit fee and additional plan checking and documentation may be required. Upon completion of work covered by this permit, please contact this office for final inspection. As a reminder to you, it is illegal to occupy this building or any portion of the building for which this permit is issued without a final inspection. EXPIRATION OF PERMIT APPLICATION AND REFUND POLICY** Application for which a permit has not been issued will expire one year after date of application.Refunds may only be made upon written request by the person who originally paid the fees. Refunds for permit applications, if the permit has not issued, but not after 180 days from the date of fee payment. Fees paid at the time of application are for Plan Check and administration. The Plan Check portion of fees is refundable only if the permit is cancelled or withdrawn before any plan checking is done. Building Division costs will be deducted prior to authorizing a refund and a charge to process the refund application will be assessed. A refund processing fee will be charged equal to the Building Division hourly rate(s).. Refunds on permits (issued) may be requested prior to the expiration of the permit, provided no work has been done pursuant to the permit. An Inspection may be required (and deducted from any refund amount) to determine no work was done. Fee/refund information can be read on-line at http://municipalcodes.lexisnexis.com/codes/butteco/ **When filed, this application and all supporting material becomes subject to the California Public Records Act. All public information related to this application is subject to public inspection and will be posted on the County's website for electronic access. 9/30/24, 10:33 AM Submission Completed https://eforms.buttecounty.net/Forms/Form/Submit 4/8 Butte County Code Section 26-12 To meet the requirements of Butte County Code Section 26-12 (available on line at http://municipalcodes.lexisnexis.com/codes/butteco ), one or more of the following may be required before a building permit can be issued for the above referenced project. The construction of curbs, gutters, sidewalks or walkways, public roads, proper access from public roads, and drainage facilities; Dedication of any necessary rights of way; and For commercial or industrial uses or for multiple living uses having three (3) or more living units per parcel, the construction of an enclosure for containers used to hold solid waste and/or recyclable materials for collection. Requirements prior to issuance of building permit: Submit sufficient information to: Land Development Division of the Public Works Department, 7 County Center Drive Oroville, CA 95965, that demonstrates compliance with County Code Section 26-12. If construction plans and/or engineering analysis are required, submit information in duplicate in accordance with County Improvement Standards (available on line at http://www.buttecounty.net/publicworks/divisions/landdevelopment ) with a minimum plan checking deposit of $690.40. Important Note If improvements in compliance with County Code Section 26 12 are required, any construction plans and/or engineering analysis must be reviewed and approved by the Land Development Division of the Public Works Department prior to construction of the improvements and the required improvements must be constructed, bonded, or guaranteed with a deposit of an in lieu fee prior to issuance of this building permit. The process can require significant time and must be completed prior to issuance of the building permit. If you have any questions, please contact the Land Development Division at 530.538.7266, Monday through Friday, 8:00 a.m. to 4:00 p.m. I have read and understand the above requirements. 9/30/24, 10:33 AM Submission Completed https://eforms.buttecounty.net/Forms/Form/Submit 5/8 Environmental Health Environmental Health has a review for clearance on water and sewer/septic for your property. Before your building permit can be issued, this review must be approved by Environmental Health. *CAMP FIRE NOTICE* If your property was affected by the Camp Fire, there is a separate process for the Debris Removal Program with Public Health. You will need to obtain Clearance from the Debris Removal Program as well as a separate approval on your building permit review. It is important to understand that these are two separate processes yet both must be completed in order to issue your building permit. Upon completion of your Phase II Debris Removal program, you will be provided with a clearance signed by Environmental Health. you can track the progress on your property in your prospective program by visiting https://buttecountyrecovers.org/phase2/ If you have any questions or concerns please contact Environmental Health at 530.552.3880 9/30/24, 10:33 AM Submission Completed https://eforms.buttecounty.net/Forms/Form/Submit 6/8 Camp Fire Donation Camp Fire Donation “A poron of your permit fees have been paid for by generous donaons donated to North Valley Community Foundaon and the Bue Strong Fund, Golden State Finance Authority, and Rural County Representaves of California (RCRC), to support the rebuild in our community!” 9/30/24, 10:33 AM Submission Completed https://eforms.buttecounty.net/Forms/Form/Submit 7/8 Final Page By signing here I agree and understand the forms that have been provided to me above: Signature * 9/30/24, 10:33 AM Submission Completed https://eforms.buttecounty.net/Forms/Form/Submit 8/8