Loading...
HomeMy WebLinkAboutSD Pump Design Letter 115 YELLOWSTONE DRIVE  CHICO, CALIFORNIA 95973-5811  TELEPHONE 530-895-1422  www.rarcivil.com T:\Data\PROJECTS\24122\Pre-application\24122_2552 Clark Road Pre-app RAR summary.docx April 24, 2025 Joel White (530) 360-1484 jw@calidozer.com SUBJECT: PRE-APPLICATION MEETING PROJECT SUMMARY CIVIL DESIGN IMPROVEMENT PLANS FOR BUTTE VALLEY SUPPLY/EARTHWORM SOIL FACTORY 2552 CLARK ROAD, BUTTE VALLEY, CA Dear Mr. White: The civil improvement plans will consist of a grading plan sheet, utility plan sheet, site plan, erosion control plan and detail & notes sheet. All storm water runoff from the site will be captured and conveyed to the retention storage tank which is to be located on the south side of the project. The retention tank will be sized to contain the 100-year post construction storm. The tank will be connected to a pump and force main to allow water to be pumped from the tank to the inoculation area for use on the compost bunkers. A driveway entrance is proposed near the south side of the site and will be designed per Caltrans standards and specifications. The design will be submitted to Caltrans for review and approval. Sincerely, ROLLS, ANDERSON & ROLLS Lauren J. McSwain PE 72210