Loading...
HomeMy WebLinkAbout04.15.2024 Board Correspondence - FW Compliance Direct Request for Delay of Action_Extension of Time submitted in FERC P-2107-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:BOS; Loeser, Kamie Cc:Nevers, Dawn Subject:Board Correspondence - FW: Request for Delay of Action/Extension of Time submitted in FERC P-2107-000 by Pacific Gas and Electric Company,et al. Date:Monday, April 15, 2024 10:27:35 AM Please see Board correspondence - LeAnne Hancock Management Analyst I Butte County Administration T. 530.552.3314 -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, April 15, 2024 5:36 AM Subject: Request for Delay of Action/Extension of Time submitted in FERC P-2107-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 4/15/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company PG&E Corporation (as Agent) Docket(s): P-2107-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Request for Delay of Action/Extension of Time Description: Pacific Gas and Electric Company submits Request for Extension of Time until 12/15/2025 to submit Redesign and Installation of Hoist Gate Components re the Poe Dam part of the Poe Hydroelectric Project under P-2107. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20240415-5017__;!!KNMwiTCp4spf!HS7- VBB7twW1VjYu5gTdAv6lpxzKYp77lAoqhmnFlYL_VkkLQL0Th5fXgH0Ayuj2cpuDZrppqf3ct3S3qNUW70Ayj2CiI2BCpDaJ$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!HS7- VBB7twW1VjYu5gTdAv6lpxzKYp77lAoqhmnFlYL_VkkLQL0Th5fXgH0Ayuj2cpuDZrppqf3ct3S3qNUW70Ayj2CiI36h0XCa$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!HS7- VBB7twW1VjYu5gTdAv6lpxzKYp77lAoqhmnFlYL_VkkLQL0Th5fXgH0Ayuj2cpuDZrppqf3ct3S3qNUW70Ayj2CiI7mZyhNS$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 April 12, 2024 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Poe Hydroelectric Project, FERC No. 2107-CA Poe Dam, NATDAM No. CA00328 Redesign and Install ation of Hoist Gate Components Extension of Time Request ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) request for an extension of time to redesign and install the hoist gate components for Poe Dam, which is part of Pacific Gas and Electric Company’s (PG&E) Poe Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 2107. Included with PG&E’s extension of time request is a reasoned basis for the request, per Title 18 of the Code of Federal Regulations, Section 12.40(d). PG&E submitted its original evaluation of a radial bypass gate hoist at Poe Dam in a letter to your office dated April 22 , 2021 , and provided its most recent update regarding a redesign package of the new hoist gate components in a letter dated January 31 , 2023. The extension of time request and reason for the request are enclosed with this letter (Enclosure 1). Should you have technical questions concerning this matter, please contact Chris Tomes, dam safety engineer for PG&E, at (818) 584-9944. For general questions, please contact Sky Ramirez-Doble, license coordinator for PG&E, at (530) 250-7002. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Extension of Time Request Document Accession #: 20240415-5017 Filed Date: 04/15/2024 Document Content(s) PGE20240412_2107_PoeDam_Redesign_Pkg_of_Hoist_EOT_Ltr.pdf .................1Document Accession #: 20240415-5017 Filed Date: 04/15/2024