HomeMy WebLinkAbout04.15.2024 Board Correspondence - FW_ Lake Oroville Community Update - April 12, 2024From:Clerk of the Board
To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Hancock, LeAnne; Jessee, Meegan;
Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; McDonnell, Susan; Paulsen, Shaina; Pickett, Andy; Ritter, Tami; Stephens, Brad J.;
Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie
Cc:Nevers, Dawn
Subject:Board Correspondence - FW: Request for Delay of Action/Extension of Time submitted in FERC P-2107-000 by Pacific Gas and
Electric Company,et al.
Date:Monday, April 15, 2024 10:27:39 AM
Please see Board correspondence -
LeAnne Hancock
Management Analyst I
Butte County Administration
T. 530.552.3314
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Monday, April 15, 2024 5:36 AM
Subject: Request for Delay of Action/Extension of Time submitted in FERC P-2107-000 by Pacific Gas and Electric Company,et
al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments,
clicking on links, or replying..
On 4/15/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
PG&E Corporation (as Agent)
Docket(s): P-2107-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Request for Delay of Action/Extension of Time
Description: Pacific Gas and Electric Company submits Request for Extension of Time until 12/15/2025 to submit Redesign and
Installation of Hoist Gate Components re the Poe Dam part of the Poe Hydroelectric Project under P-2107.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?
accession_num=20240415-5017__;!!KNMwiTCp4spf!HS7-
VBB7twW1VjYu5gTdAv6lpxzKYp77lAoqhmnFlYL_VkkLQL0Th5fXgH0Ayuj2cpuDZrppqf3ct3S3qNUW70Ayj2CiI2BCpDaJ$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!HS7-
VBB7twW1VjYu5gTdAv6lpxzKYp77lAoqhmnFlYL_VkkLQL0Th5fXgH0Ayuj2cpuDZrppqf3ct3S3qNUW70Ayj2CiI36h0XCa$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!HS7-
VBB7twW1VjYu5gTdAv6lpxzKYp77lAoqhmnFlYL_VkkLQL0Th5fXgH0Ayuj2cpuDZrppqf3ct3S3qNUW70Ayj2CiI7mZyhNS$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
April 12, 2024
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: Poe Hydroelectric Project, FERC No. 2107-CA
Poe Dam, NATDAM No. CA00328
Redesign and Installation of Hoist Gate Components
Extension of Time Request
ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE
Dear Frank L. Blackett:
This letter presents Pacific Gas and Electric Company’s (PG&E) request for an extension
of time to redesign and install the hoist gate components for Poe Dam, which is part of
Pacific Gas and Electric Company’s (PG&E) Poe Hydroelectric Project, Federal Energy
Regulatory Commission (FERC) No. 2107. Included with PG&E’s extension of time
request is a reasoned basis for the request, per Title 18 of the Code of Federal
Regulations, Section 12.40(d). PG&E submitted its original evaluation of a radial bypass
gate hoist at Poe Dam in a letter to your office dated April 22, 2021, and provided its most
recent update regarding a redesign package of the new hoist gate components in a letter
dated January 31, 2023.
The extension of time request and reason for the request are en closed with this letter
(Enclosure 1).
Should you have technical questions concerning this matter, please contact Chris Tomes,
dam safety engineer for PG&E, at (818) 584-9944. For general questions, please contact
Sky Ramirez-Doble, license coordinator for PG&E, at (530) 250-7002.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosure: CUI//CEII – DO NOT RELEASE
1. Extension of Time Request
Document Accession #: 20240415-5017 Filed Date: 04/15/2024