HomeMy WebLinkAbout04.18.2024 Board Correspondence - FW_ Compliance Directives issued in FERC P-619-000From:Clerk of the Board
To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Hancock, LeAnne; Jessee, Meegan;
Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; McDonnell, Susan; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen;
Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie
Cc:Nevers, Dawn
Subject:Board Correspondence - FW: Compliance Directives issued in FERC P-619-000
Date:Thursday, April 18, 2024 4:02:58 PM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Thursday, April 18, 2024 1:55 PM
Subject: Compliance Directives issued in FERC P-619-000
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking
on links, or replying..
On 4/18/2024, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document:
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Compliance Directives
General Correspondence
Description: Letter to Pacific Gas and Electric Company providing a comment on the 03/12/2024 response to FERC's comment
for the Bucks Creek Penstock Alignment Improvement Project, part of the Bucks Creek Hydroelectric Project under P-619.
To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?
accession_num=20240418-3079__;!!KNMwiTCp4spf!ClGOibtgnYCk69ITN8eWnWC7lp-O-
mC2hlkrzpIS8KTRbrW8Pa5uHIcH873pM8CrFwvgFgmcecTnIwkiPioijrBpaDkr82J6Q896$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!ClGOibtgnYCk69ITN8eWnWC7lp-
O-mC2hlkrzpIS8KTRbrW8Pa5uHIcH873pM8CrFwvgFgmcecTnIwkiPioijrBpaDkr8-X5Hncc$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!ClGOibtgnYCk69ITN8eWnWC7lp-O-
mC2hlkrzpIS8KTRbrW8Pa5uHIcH873pM8CrFwvgFgmcecTnIwkiPioijrBpaDkr8-09wHu1$
or for phone support, call 866-208-3676.
Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov
FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections – San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 (415) 369-3300 April 18, 2024 In reply refer to: Project No. 619-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland , CA 94612-3534 Re: Bucks Creek Penstock Alignment Improvement Project Dear Mr. Cruzen: This is in response to a letter dated March 12, 2024, from Mr . Kyle Ingvoldsen, that submitted a response to our comment for the Bucks Creek Penstock Alignment
Improvement Project, which is part of the Bucks Creek Hydroelectric Project, FERC No. 619 . We have reviewed the response, and we have the following comment: • Back calculated strength parameters (38 degrees and 390 psi for cohesion) for
the decomposed granite were utilized for stability analysis of the anchor block.
We disagree with the use of back calculated strength parameters and require
that additional information be provided to support the assumed strengths for
the onsite foundation material. Within 45 days of the date of this letter, please address our comment or provide a
plan and schedule to address our comment. File your submittal using our eFiling system
at https://www.ferc.gov/ferc-online/overview. When eFiling, select Hydro: Dam Safety;
San Francisco Regional Office from the eFiling menu. The cover page of the filing must
indicate that the material was eFiled. For assistance with eFiling, contact FERC Online
Supp ort at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659
(TTY). Document Accession #: 20240418-3079 Filed Date: 04/18/2024
2 We appreciate your continued efforts in this aspect of our dam safety program. If
you have any questions, please contact Ms. Eunhye Kim at (415) 369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer cc: Ms. Sharon Tapia, Division Manager CA Dept. of Water Resources Division of Safety of Dams P.O. Box 942836 Sacramento, CA 94236-0001 Frank L Blackett, P.E.Digitally signed by Frank L Blackett,
P.E.
Date: 2024.04.18 11:01:17 -07'00'
Document Accession #: 20240418-3079 Filed Date: 04/18/2024
Document Content(s)