Loading...
HomeMy WebLinkAbout04.19.2024 Board Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Hancock, LeAnne; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; McDonnell, Susan; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nevers, Dawn Subject:Board Correspondence - FW: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Friday, April 19, 2024 11:15:16 AM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, April 19, 2024 10:15 AM Subject: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 4/19/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company No Organization Found (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Description: Pacific Gas and Electric Company submits Notification of 2024 Outage Schedule Update for Bucks Powerhouse Unit 2 for the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240419- 5094__;!!KNMwiTCp4spf!CyI8FxOcr-zvc8bXERzIeOvPIz1DpItvRjOBaC8Qs__r0QsYR6wnU0sgM- UlBM23PCWLpVHibm0zs7lz_G9QanF0pvS7FirrHcdm$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!CyI8FxOcr- zvc8bXERzIeOvPIz1DpItvRjOBaC8Qs__r0QsYR6wnU0sgM- UlBM23PCWLpVHibm0zs7lz_G9QanF0pvS7FsddAjeO$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!CyI8FxOcr- zvc8bXERzIeOvPIz1DpItvRjOBaC8Qs__r0QsYR6wnU0sgM- UlBM23PCWLpVHibm0zs7lz_G9QanF0pvS7Fu1eHkPF$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 April 19, 2024 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Powerhouse Update to 2024 Outage Schedule – Bucks Creek U2 Dear Frank L. Blackett: This letter presents an update to Pacific Gas and Electric Company's (PG&E) schedule of planned outages in 2024 which require dewatering of tunnels, conduits, or penstocks. Penstock dewatering is required for the Bucks Powerhouse Unit 2, which is part of PG&E’s Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. PG&E submitted the 2024 outage schedule to FERC on October 26, 2023. Table 1: Current Outage Schedule and Updated Outage Schedule Current Outage Schedule FERC No. Region Location Description of Work Dewatered Start Date End Date 619 DeSabla Bucks Creek U2 Annual, Replace Shaft and Bearings, Rewind and Restack Unit, TSV Refurbish, Grizzly Frby Dam LLO Repair, Grizzly Frby Subsurface Debris Removal, Xfmr Mgmt Relay/Protection package upgrade Penstock 1/1/2023 4/30/2024 Updated Outage Schedule FERC No. Region Location Description of Work Dewatered Start Date End Date 619 DeSabla Bucks Creek U2 Annual, Replace Shaft and Bearings, Rewind and Restack Unit, TSV Refurbish, Grizzly Frby Dam LLO Repair, Grizzly Frby Subsurface Debris Removal, Xfmr Mgmt Relay/Protection package upgrade Penstock 1/1/2023 6/30/2024 Frank L. Blackett, P.E., Regional Engineer April 19, 2024 Page 2 The Bucks U2 outage extension is needed due to delays in obtaining drawings and performing SCADA updates. The extension will also allow for extensive testing prior to returning the unit to service. This routine maintenance outage will follow the previously executed procedures that have been coordinated with your office. If you have questions or comments regarding this matter, please contact Jamie Visinoni, senior license coordinator for PG&E, at (530) 215 -6676. Sincerely, Matthew Joseph Supervisor, Hydro License Management