Loading...
HomeMy WebLinkAbout05.13.2024 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-2088-000 by Individual No Affiliation,et al.From:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nevers, Dawn Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-2088-000 by Individual No Affiliation,et al. Date:Tuesday, May 14, 2024 8:30:58 AM Please see Board correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, May 13, 2024 1:26 PM Subject: Dam Safety Compliance Report submitted in FERC P-2088-000 by Individual No Affiliation,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 5/13/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Individual No Affiliation South Feather Water & Power Agency (as Agent) Docket(s): P-2088-000 Lead Applicant: South Feather Water & Power Agency Filing Type: Dam Safety Compliance Report Description: South Feather Water and Power Agency submits 2023 Dam Safety Surveillance and Monitoring Report re the South Feather Power Project under P-2088. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240513- 5272__;!!KNMwiTCp4spf!BcJZY7_jenP7omFjGMnoebxFJ8rhwOeu2yN4sVxD_vr-tMHrP3EXdqgMhKnyBdpYjZZ9TZ-_- ibkFyQI6ZJiKx1PjO0CpPcQdwN4$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!BcJZY7_jenP7omFjGMnoebxFJ8rhwOeu2yN4sVxD_vr- tMHrP3EXdqgMhKnyBdpYjZZ9TZ-_-ibkFyQI6ZJiKx1PjO0CpKSyJvAT$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!BcJZY7_jenP7omFjGMnoebxFJ8rhwOeu2yN4sVxD_vr- tMHrP3EXdqgMhKnyBdpYjZZ9TZ-_-ibkFyQI6ZJiKx1PjO0CpG2Ndcgm$ or for phone support, call 866-208-3676. May 13, 2024 Frank L. Blackett, P.E., Regional Engineer Filed electronically Federal Energy Regulatory Commission San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105 RE: South Feather Power Project (SFPP/FERC No. 2088) Submittal of 2023 Calendar Year Dam Safety Surveillance and Monitoring Report Dear Mr. Blackett, This letter serves as the transmittal of the South Feather Water and Power Agency’s 2023 Calendar Year Dam Safety Surveillance and Monitoring Report (DSSMR) for your review and approval. The DSSMR includes reports based on routine field observations, instrumentation data collected by staff and surveying conducted by an independent consultant for the following SFPP dams: • Little Grass Valley (020880601) • Sly Creek (020880701) • Lost Creek (020880301) • Ponderosa (020880801) • Miners Ranch (020880101) If you have any questions related to this filing, please feel free to contact me at (530) 534-1221, or via email at kmckillop@southfeather.com. Sincerely, South Feather Water and Power Agency Kristen McKillop Regulatory Compliance Manager Chief Dam Safety Coordinator Enclosures: CUI//CEII documents submitted separately cc: Dan Leon, Power Division Manager Rath Moseley, General Manager Silas Sanderson, PE, Chief Dam Safety Engineer KRISTEN MCKILLOP REGULATORY COMPLIANCE MANAGER 2310 ORO-QUINCY HIGHWAY OROVILLE, CALIFORNIA 95966 KMCKILLOP@SOUTHFEATHER.COM Document Accession #: 20240513-5272 Filed Date: 05/13/2024 Document Content(s) to FERC_05032024_CEII transmit calendar year 2023 DSSMR.pdf ...............1Document Accession #: 20240513-5272 Filed Date: 05/13/2024