Loading...
HomeMy WebLinkAbout04.26.2024 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Hancock, LeAnne; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; McDonnell, Susan; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nevers, Dawn Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. Date:Friday, April 26, 2024 10:30:40 AM Please see Board correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, April 26, 2024 10:25 AM Subject: Dam Safety Compliance Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 4/26/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company submits Summary and Conclusion for Action Item No. 1 from the 2023 Dam Safety Inspection re the DeSabla Forebay Dam of the DeSabla-Centerville Hydroelectric Project under P- 803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240426- 5150__;!!KNMwiTCp4spf!D5fha468ItwS-XW5NfP- z8td7WWqYhJASDmsXdqh1aEDp4jd_8zhXj3na6aHQV6a8vev98MiM7jynGFJhRVUqTCiAtlpMIDjXHyA$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!D5fha468ItwS- XW5NfP- z8td7WWqYhJASDmsXdqh1aEDp4jd_8zhXj3na6aHQV6a8vev98MiM7jynGFJhRVUqTCiAtlpMJVkT6Cd$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!D5fha468ItwS-XW5NfP- z8td7WWqYhJASDmsXdqh1aEDp4jd_8zhXj3na6aHQV6a8vev98MiM7jynGFJhRVUqTCiAtlpMHMM1PWH$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 April 26, 2024 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA DeSabla Forebay, NATDAM No. CA00343 2023 Annual FERC Inspection Summary and Conclusion for Action Item 1 ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter reports on the completion of Pacific Gas and Electric Company's (PG&E) efforts to address Action Item 1 from the 2023 annual Federal Energy Regulatory Commission (FERC) dam safety inspection of PG&E’s DeSabla-Centerville Hydroelectric Project, FERC No. 803. FERC inspected the project facilities with PG&E staff on July 10 through 14, 2023, and provided follow-up action items in a letter to PG&E, dated July 21, 2023. A summary and conclusion of PG&E’s efforts to address Action Item 1 is e nclosed with this letter (Enclosure 1). PG&E believes that Action Item 1 has been satisfactorily addressed based on the information enclosed with this letter and no further action is necessary. Should you have technical questions concerning this matter, please contact Kaitlyn Daniels, dam safety engineer for PG&E, at (707) 342-7885. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CONTAINS C UI//CEII – DO NOT RELEASE 1. Summary and Conclusion for Action Item 1 from the 2023 Annual FERC Dam Safety Inspection Document Accession #: 20240426-5150 Filed Date: 04/26/2024 Document Content(s) PGE20240426_803_LilButteCrkFdr_FlashBrdEval_Ltr.pdf ......................1Document Accession #: 20240426-5150 Filed Date: 04/26/2024