HomeMy WebLinkAbout04.30.2024 Board Correspondence - FW_ Request for Delay of Action_Extension of Time submitted in FERC P-77-001,et al. by Pacific Gas and Electric Company,et al.From:Clerk of the Board
To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Hancock, LeAnne; Jessee,
Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; McDonnell, Susan; Pickett, Andy; Ritter, Tami; Stephens, Brad J.;
Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie
Cc:Nevers, Dawn
Subject:Board Correspondence - FW: Request for Delay of Action/Extension of Time submitted in FERC P-77-001,et al. by Pacific Gas
and Electric Company,et al.
Date:Tuesday, April 30, 2024 4:42:57 PM
Please see Board correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Tuesday, April 30, 2024 3:27 PM
Subject: Request for Delay of Action/Extension of Time submitted in FERC P-77-001,et al. by Pacific Gas and Electric
Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments,
clicking on links, or replying..
On 4/30/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
PG&E Corporation (as Agent)
Docket(s): P-77-001
P-96-000
P-137-008
P-175-000
P-233-000
P-606-000
P-619-000
P-803-000
P-1061-019
P-1121-000
P-1333-015
P-1354-000
P-1962-001
P-1988-000
P-2105-000
P-2106-000
P-2107-000
P-2130-000
P-2310-000
P-2661-000
P-2687-000
P-2735-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Request for Delay of Action/Extension of Time
Description: Pacific Gas and Electric Company submits request for an extension of time until 05/31/2026 to address
Recommendation 4 from the 5-Year External Audit Report of the Owner's Dam Safety Program for the Potter Valley Project,
et al. under P-77, et al.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?
accession_num=20240430-5493__;!!KNMwiTCp4spf!FjPa35tm2ca0ccKw6dthB9p3-
iCMOOY19UtP99suvP7sdvC55KVv0q_SSdBH0xRQeeMEZLkn6TRp7H9YME_xsq0LMgx0pezuPSaZ$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!FjPa35tm2ca0ccKw6dthB9p3-
iCMOOY19UtP99suvP7sdvC55KVv0q_SSdBH0xRQeeMEZLkn6TRp7H9YME_xsq0LMgx0pYoVtUJ9$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!FjPa35tm2ca0ccKw6dthB9p3-
iCMOOY19UtP99suvP7sdvC55KVv0q_SSdBH0xRQeeMEZLkn6TRp7H9YME_xsq0LMgx0pZkOU0Bw$
or for phone support, call 866-208-3676.
Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 April 30, 2024 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: FERC Project Nos. 77, 96, 137, 175, 233, 606, 619, 803, 1061, 1121, 1333, 1354, 1962, 1988, 2105, 2106, 2107, 2130, 2310, 2661, 2687, and 2735-CA 2021 Owner’s Dam Safety Program Audit – Recommendation 4 Extension of Time Request ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) request for an extension
of time to address Recommendation 4 (R-4) from a 2021 external audit of PG&E’s Owner’s
Dam Safety Program . Included with PG&E’s extension of time request is a reasoned basis
for the request, per Title 18 of the Code of Federal Regulations, Section 12.40(d). PG&E submitted the audit report and plans and schedules for addressing the recommendations
in a letter to FERC dated May 23, 2022. The extension of time request and reason for the request are enclosed with this letter
(Enclosure 1). Should you have technical questions concerning this matter, please contact Andrew Fisher at (530) 339-0028. For general questions, please contact Sonja Langan, license
coordinator for PG&E, at (209) 419-0019. Sincerely, Andrew Fisher , P.E. Manager of Dam Safety Program Enclosure: CUI//CEII – DO NOT RELEASE 1. Extension of Time Request cc: See Attached List Document Accession #: 20240430-5493 Filed Date: 04/30/2024
Frank L. Blackett, P.E. Regional Engineer April 30, 2024 Page 2
cc: via email w/enclosures DSAB Members: Steve Verigin sverigin@geiconsultants.com Ross Boulanger rwboulanger@ucdavis.edu Steven Rigbey Stephen.rigbey@outlook.com Dave Gutierrez dgutierrez@geiconsultants.com
Document Accession #: 20240430-5493 Filed Date: 04/30/2024