Loading...
HomeMy WebLinkAbout05.02.2024 Board Correspondence - FW_ Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric CompanyFrom:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Hancock, LeAnne; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; McDonnell, Susan; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nevers, Dawn Subject:Board Correspondence - FW: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company Date:Thursday, May 2, 2024 4:54:01 PM Please see Board correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Thursday, May 2, 2024 6:35 AM Subject: Dam Safety Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 5/2/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Dam Safety Compliance Report Description: Pacific Gas and Electric Company submits response to FERC's 03/18/2024 comment from the 2021 Annual Dam Inspection follow-up item No. 1 re the Bucks Storage Dam of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240502- 5051__;!!KNMwiTCp4spf!Fwvpy2bfxxDD4iUl3JA3h047kdcVCviRiIR7wtdTu1GehqlPJ6XZA2EXxfTnWD3FVpwKd67TgryAfaS5nfwu8O8ns6LWmlsPpoj0$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!Fwvpy2bfxxDD4iUl3JA3h047kdcVCviRiIR7wtdTu1GehqlPJ6XZA2EXxfTnWD3FVpwKd67TgryAfaS5nfwu8O8ns6LWmnSiKmAw$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!Fwvpy2bfxxDD4iUl3JA3h047kdcVCviRiIR7wtdTu1GehqlPJ6XZA2EXxfTnWD3FVpwKd67TgryAfaS5nfwu8O8ns6LWmnRdDwsx$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 May 1, 2024 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Storage Dam, NATDAM No. CA00332 2021 Annual FERC Inspection – Response to Comment on Follow-up Item 1 Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company's (PG&E) response to address the Federal Energy Regulatory Commission’s (FERC) comment on an extension of time request regarding follow-up Item 1 (I-1) from the 2021 annual FERC safety inspection for Bucks Storage Dam, which is part of PG&E’s Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. PG&E received FERC’s comment in a letter dated March 18, 2024 . In accordance with PG&E’s plan and schedule provided in its January 31, 2023, letter to FERC , PG&E report ed on the completion of I-1 in a letter to FERC dated December 27, 2023. FERC accepted the completion of I-1 i n a letter to PG&E dated January 23, 2024 . PG&E believes that no further information or action is required in response to FERC’s March 18, 2024, letter regarding I-1. Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762-9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Document Accession #: 20240502-5051 Filed Date: 05/02/2024 Document Content(s) PGE20240501_0619_BucksStorage_2021DSI.pdf ................................1Document Accession #: 20240502-5051 Filed Date: 05/02/2024