Loading...
HomeMy WebLinkAbout05.07.2024 Board Correspondence - FW_ Paradise Sewer Project-Monthly Update-April 2024.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. From:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Hancock, LeAnne; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; McDonnell, Susan; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Nevers, Dawn Subject:Board Correspondence - FW: Paradise Sewer Project-Monthly Update-April 2024 Date:Tuesday, May 7, 2024 4:49:32 PM Attachments:image001.png 2024.04.30 - Paradise Sewer Project - HDR Monthly Report - Exec Summary - April 2024.pdf Please see Board Correspondence - From: Mattox, Marc <mmattox@townofparadise.com> Sent: Tuesday, May 7, 2024 4:09 PM To: Costa, Shannon <SCosta@buttecounty.net>; Clerk of the Board <clerkoftheboard@buttecounty.net> Cc: Buttz, John <John.Buttz@hdrinc.com>; erik.gustafson@chicoca.gov; Snyder, Clint@Waterboards <Clint.Snyder@waterboards.ca.gov>; Lucas, Steve <SLucas@buttecounty.net>; Pack, Joshua <jpack@buttecounty.net>; Voss, Guy <Guy.Voss@hdrinc.com>; Goodwin, Jim <jgoodwin@townofparadise.com>; Nelson, Colin <cnelson@townofparadise.com>; Brendan Ottoboni (brendan.ottoboni@Chicoca.gov) <brendan.ottoboni@Chicoca.gov>; Voss, Guy <Guy.Voss@hdrinc.com>; allison.mcreynolds@hdrinc.com; Edwards, Terry <TEdwards@buttecounty.net>; Johnson, Louis <ljohnson@townofparadise.com> Subject: Paradise Sewer Project-Monthly Update-April 2024 Good afternoon Butte County and LAFCo teams: Please find attached our regular monthly update for the Paradise Sewer Project. Please let us know if you have any questions or need additional information. Sincerely, Marc Mattox Public Works Director & Town Engineer Town of Paradise | (530) 872-6291 x 125 Website | Contact Us | Facebook 5/6/2024 MONTHLY REPORT | 2024.04.30 - Paradise Sewer Project - Hdr Monthly Report - Exec Summary - April 2024 1 Monthly Report - Executive Summary Paradise Sewer Project – Owner’s Agent Services To: Marc Mattox, Public Works Director, Town of Paradise Colin Nelson, Infrastructure Program Manager, Town of Paradise CC: Allison Reynolds, Deputy Program Manager, HDR Date: April 30, 2024 From: Guy Voss, Program Manager, HDR Subject: April 2024 Monthly Report 1.0 Program Status The program has progressed into the Preliminary Design phase with the Mountain-Cascade- Carollo team making great progress on the project’s Basis of Design. In addition, positive progress continues with both the Environmental Permitting efforts and staying coordinated with all stakeholder teams. 2.0 Reporting Period of Performance April 1 through April 30, 2024 3.0 Main Accomplishments • Supported PDB team progress on the Basis of Design Report including geotechnical investigations, hydraulic model refinements, and project schedule and cost model preparation. • Aligned with project stakeholders including DFA, HCD and all utility partners (PG&E, PID, Comcast, and AT&T). Introduced the Mountain-Cascade-Carollo team to the PCT team (City of Chico, Butte County). • Maintained on-going dialogue with all permitting entities. Submitted the project’s Biological Assessment (BA) to USFWS. 4.0 Key Activities (One Month Look-Ahead) • Facilitate the next PCT meeting, including coordination with the Butte Utility Council to provide a Paradise Sewer Project update & overview presentation. • Support PDB team progress for geotechnical borings, hydraulic model refinements, Risk Register kick-off, and project schedule and cost model review workshops. • Continue coordination of all permit applications, including interactions with USFWS, NMFS, CDFW, CVRWQCB, CVFPB, SHPO, and USACE.