Loading...
HomeMy WebLinkAbout05.28.2024 Board Correspondence - FW_ Project Safety Compliance Report submitted in FERC P-2107-000,et al. by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nevers, Dawn Subject:Board Correspondence - FW: Project Safety Compliance Report submitted in FERC P-2107-000,et al. by Pacific Gas and Electric Company,et al. Date:Wednesday, May 29, 2024 9:00:14 AM Please see Board correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, May 28, 2024 6:46 AM Subject: Project Safety Compliance Report submitted in FERC P-2107-000,et al. by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 5/28/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-2107-000 P-1962-001 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Safety Compliance Report Description: Pacific Gas and Electric Company submits 2023 Environmental Inspection Report re Temporary Part 8 Signage at the Poe Hydroelectric Project, et al. under P-2107, et al. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240528- 5062__;!!KNMwiTCp4spf!FUBe50bgce7Pu8bwAkX9qgwPI1R0REcCE1PbQrWHpfx9saYC3bywg7EVCeWHqUKT-7LKQGe7uB6pvztsj4xfVDX3RB55w5juP4cs$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!FUBe50bgce7Pu8bwAkX9qgwPI1R0REcCE1PbQrWHpfx9saYC3bywg7EVCeWHqUKT- 7LKQGe7uB6pvztsj4xfVDX3RB55w43w_QuY$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!FUBe50bgce7Pu8bwAkX9qgwPI1R0REcCE1PbQrWHpfx9saYC3bywg7EVCeWHqUKT- 7LKQGe7uB6pvztsj4xfVDX3RB55w4odfzOH$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 May 27, 2024 Via Electronic Submittal (E-File) Debbie-Anne Reese, Acting Secretary Federal Energy Regulatory Commission Division of Hydropower Administration and Compliance 888 First Street, NE Washington, DC 20426 RE: Poe Hydroelectric Project, FERC No. 2107-CA Rock Creek-Cresta Hydroelectric Project, FERC No. 1962-CA 2023 Environmental Inspection – Documentation of Temporary Part 8 Signage Dear Secretary Reese: This letter reports on the completion of Pacific Gas and Electric Company's (PG&E) efforts to address the Federal Energy Regulatory Commission’s (FERC) comments regarding installation of temporary part 8 recreation signage at PG&E’s Rock Creek-Cresta and Poe Hydroelectric projects, FERC No.1962 and 2107, respectively. PG&E installed temporary part 8 recreation signage on May 22, 2024. PG&E intends to install permanent signage by February 6, 2025 , per FERC’s March 7, 2024, letter. Please note that Poe Dam has permanent part 8 signage installed and Sandy Beach signage will be installed during construction of the recreation site. Photo documentation of the temporary and permanent signage is included as Enclosure 1 . Should you have questions concerning this matter, please contact Chadwick McCready, senior license coordinator for PG&E, at (530) 685-5710. Sincerely, Matt hew Joseph Supervisor, Hydro License Management Enclosure: 1. Photo Documentation of Temporary Signage Document Accession #: 20240528-5062 Filed Date: 05/28/2024 ENCLOSURE 1 Document Accession #: 20240528-5062 Filed Date: 05/28/2024 Rock Creek Bench 05/22/2024 (p-1962) Document Accession #: 20240528-5062 Filed Date: 05/28/2024 Shady Rest Streetview (p-1962) Document Accession #: 20240528-5062 Filed Date: 05/28/2024 Poe Reservoir Access 05/22/2024 (p-1962) Document Accession #: 20240528-5062 Filed Date: 05/28/2024 Representative Signs Poe Reservoir Trail 05/22/2024 Document Accession #: 20240528-5062 Filed Date: 05/28/2024 Poe Dam Streetview (p-2107) Document Accession #: 20240528-5062 Filed Date: 05/28/2024 Bardees Bar River Access 05/22/2024 (p-2107) Document Accession #: 20240528-5062 Filed Date: 05/28/2024 Poe Beach Trail 05/22/2024 (p-2107) Document Accession #: 20240528-5062 Filed Date: 05/28/2024 Poe Powerhouse River Access 05/22/2024 (p-1962) Document Accession #: 20240528-5062 Filed Date: 05/28/2024 Document Content(s) PGE20240527_1962_2107_DHAC_Part8_Signage.pdf ..............................1Document Accession #: 20240528-5062 Filed Date: 05/28/2024