HomeMy WebLinkAbout05.23.2024 Board Correspondence - FW_ Progress Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. 2From:Clerk of the Board
To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis;
Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie
Cc:Nevers, Dawn
Subject:Board Correspondence - FW: Progress Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.
Date:Tuesday, May 28, 2024 1:40:35 PM
Please see Board correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Thursday, May 23, 2024 10:25 AM
Subject: Progress Report submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or
replying..
On 5/23/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Pacific Gas & Electric Company (as Agent)
Docket(s): P-803-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Progress Report
Description: Pacific Gas and Electric Company submits Final Construction Report re tree stump removal from berm at the Toadtown Canal Station
474+00 of the DeSabla-Centerville Hydroelectric Project under P-803.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20240523-
5125__;!!KNMwiTCp4spf!ERsTi_09nPk6_M9CFYbS8ckowiAPSfw4rKESRhslg-vkJ2KGuw_NPulL85I_0PCH22CzQ-
8mmorUqx2pwee8KzKjBSqc6yCWvQQ9$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!ERsTi_09nPk6_M9CFYbS8ckowiAPSfw4rKESRhslg-
vkJ2KGuw_NPulL85I_0PCH22CzQ-8mmorUqx2pwee8KzKjBSqc6xNXdOjK$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!ERsTi_09nPk6_M9CFYbS8ckowiAPSfw4rKESRhslg-
vkJ2KGuw_NPulL85I_0PCH22CzQ-8mmorUqx2pwee8KzKjBSqc6yN0inYZ$
or for phone support, call 866-208-3676.
Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604
May 23, 2024 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA
Toadtown Canal Station 474+00 Tree Stump Removal from Berm – Final Construction Report Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company’s (PG&E) brief final construction
report for a tree stump removal on the Toadtown Canal , which is part of PG&E ’s DeSabla-Centerville Hydroelectric Project, Federal Energy Regulatory Commission
(FERC) No. 803. In a letter dated February 20, 2024 , FERC authorized PG&E to
proceed with the project and requested that PG&E file a final construction report for the
project within 90 days of construction completion. The construction project was
completed on April 12, 2024 Enclos ure 1 of this letter provides the final construction report , which includes the
completed construction activities and photo documentation. Should you have technical questions concerning this matter, please contact Gavin
Rhoads, project engineer for PG&E, at (530) 370-6685. For general questions, please
contact Megan Young, senior license coordinator for PG&E, at (530) 335-5602. Sincerely, Kyle Ingvoldsen, P.E. Supervisor, Power Generation Project Engineering Enclosure: 1. Toadtown Canal Removal Stump from Berm Final Construction Report, prepared by
PG&E and dated May 2024 Document Accession #: 20240523-5125 Filed Date: 05/23/2024
ENCLOSURE 1 Document Accession #: 20240523-5125 Filed Date: 05/23/2024
Toadtown Canal – Remove Stump from Berm, FERC No. 803-CA
May 2024 – Final Construction Report
TOADTOWN CANAL
REMOVE STUMP FROM BERM
DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA
FINAL CONSTRUCTION REPORT
Document Accession #: 20240523-5125 Filed Date: 05/23/2024
Toadtown Canal – Remove Stump from Berm, FERC No. 803-CA
May 2024 – Final Construction Report
TABLE OF CONTENTS PAGE
1. GENERAL ............................................................................................................ 1
1.1 Background .............................................................................................. 1
1.2 Summary of Construction Chronology .................................................. 1
1.3 Original Structure Findings .................................................................... 2
NOT APPLICABLE TO THIS CONSTRUCTION PROJECT. ........................................ 2
2. FOUNDATIONS ................................................................................................... 2
3. EMBANKMENTS ................................................................................................. 2
4. CONCRETE WORK ............................................................................................. 2
5. ANCHORS ........................................................................................................... 2
6. INSTRUMENTATION ........................................................................................... 2
APPENDIX
A. Photographs
Document Accession #: 20240523-5125 Filed Date: 05/23/2024
Toadtown Canal – Remove Stump from Berm, FERC No. 803-CA
May 2024 – Final Construction Report
1
1. GENERAL
This final construction report (FCR) is regarding Pacific Gas and Electric Company’s (PG&E)
project (the project) to remove a stump from the berm of Toadtown Canal at approximately
Station 474+00 or North 39⁰ 53’ 21”, West 121⁰ 35’ 30”, which is part of PG&E’s DeSabla-
Centerville Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 803.The
purpose of this FCR is to include a summary of pertinent construction information in a concise
form.
This FCR has been prepared in compliance with the FERC requirements noted in the
authorization letter for this project, dated 02/20/2024.
1.1 Background
The purpose of this project is to remove a large eroding stump from the berm of the canal,
improving reliability of the canal and removing a possible tripping hazard.
Key construction milestones are listed below:
• Construction Start: April 12, 2024
• Construction Finish: April 12, 2024
Construction progress photos are in Appendix A.
1.2 Summary of Construction Chronology
A summary of the major construction activities is presented below.
April 12, 2024
• Mobilized to site.
• Removed rotting stump from berm area.
• Removed roots greater than 1/2” diameter, organic debris, and loose soil from berm area.
• Native backfill material was utilized.
• Backfill placed in 6-inch loose lifts.
• Backfill compacted with jumping jack compactor with a minimum of two passes.
• Used hand tools to compact backfill within 1-foot of canal liner.
• Placed existing straw for erosion protection.
• Demobilized from site.
Document Accession #: 20240523-5125 Filed Date: 05/23/2024
Toadtown Canal – Remove Stump from Berm, FERC No. 803-CA
May 2024 – Final Construction Report
2
1.3 Original Structure Findings
Not applicable to this construction project.
2. FOUNDATIONS
This section is not applicable to this construction project.
3. EMBANKMENTS
The embankment construction included returning the eroded berm to its original geometry.
Native soil was excavated with a mini excavator upstream of the project location. The
Responsible Engineer was onsite during all construction activities and ensured that backfill and
compaction was performed per the FERC-authorized Work Plan.
The adhered-to specifications are shown below:
• Prior to backfill placement the subgrade was free of debris and loose soils. Backfill was
benched to help create good bonding and reduce the likelihood of a slip surface.
• The bottom of the excavation was scarified, moisture conditioned and recompacted prior
to backfill placement.
• The backfill was free of roots, rocks, trash, organics, or other deleterious materials.
• Backfill was placed in lifts no greater than 6-inch of uncompacted thickness. The material
was moisture conditioned and compacted using jumping jack style compactor with a
minimum of two passes.
• Each lift of backfill was compacted until firm and unyielding and approved by the onsite
engineer prior to placing subsequent lifts.
4. CONCRETE WORK
This section is not applicable to this construction project.
5. ANCHORS
This section is not applicable to this construction project.
6. INSTRUMENTATION
This section is not applicable to this construction project.
Document Accession #: 20240523-5125 Filed Date: 05/23/2024
Toadtown Canal – Remove Stump from Berm, FERC No. 803-CA
May 2024 – Final Construction Report
APPENDIX A
PHOTOGRAPHS
Document Accession #: 20240523-5125 Filed Date: 05/23/2024
Toadtown Canal – Remove Stump from Berm, FERC No. 803-CA
May 2024 – Final Construction Report
PHOTO 1: April 12, 2024, Rotting Stump Prior to Removal
PHOTO 2: April 12, 2024, Removing Stump
Document Accession #: 20240523-5125 Filed Date: 05/23/2024
Toadtown Canal – Remove Stump from Berm, FERC No. 803-CA
May 2024 – Final Construction Report
PHOTO 3: April 12, 2024, Crew Hand Excavating and Removing Debris
Document Accession #: 20240523-5125 Filed Date: 05/23/2024
Toadtown Canal – Remove Stump from Berm, FERC No. 803-CA
May 2024 – Final Construction Report
PHOTO 4: April 12, 2024, Berm Prior to Backfill
Document Accession #: 20240523-5125 Filed Date: 05/23/2024
Toadtown Canal – Remove Stump from Berm, FERC No. 803-CA
May 2024 – Final Construction Report
PHOTO 5: April 12, 2024, Crew Backfilling Berm and Moisture Conditioning
Document Accession #: 20240523-5125 Filed Date: 05/23/2024
Toadtown Canal – Remove Stump from Berm, FERC No. 803-CA
May 2024 – Final Construction Report
PHOTO 6: April 12, 2024, Crew Compacting
Document Accession #: 20240523-5125 Filed Date: 05/23/2024
Toadtown Canal – Remove Stump from Berm, FERC No. 803-CA
May 2024 – Final Construction Report
PHOTO 7: April 12, 2024, Construction Complete
Document Accession #: 20240523-5125 Filed Date: 05/23/2024
Document Content(s)
PGE20240523_803_Toadtown_Stump_FCR.pdf ....................................1Document Accession #: 20240523-5125 Filed Date: 05/23/2024