HomeMy WebLinkAbout05.17.2024 Board Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board
To:Bennett, Robin; Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts,
Melissa; Lee, Lewis; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie
Cc:Nevers, Dawn
Subject:Board Correspondence - FW: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et
al.
Date:Friday, May 17, 2024 4:50:43 PM
Please see Board correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Friday, May 17, 2024 11:45 AM
Subject: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on
links, or replying..
On 5/17/2024, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
No Organization Found (as Agent)
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Project Operations Compliance Report
Description: Pacific Gas and Electric Company submits response to FERC's 04/18/2024 comments re Penstock Alignment
Improvement Project re the Bucks Creek Hydroelectric Project under P-619.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?
accession_num=20240517-5111__;!!KNMwiTCp4spf!AQPZuWEvMIOJGO0maPhP2k_SZi3x-
KlHgdIzgQJCLMFgRksOkuGLGb7QPMR8DZyP6sgfkKMyeE2ChHoUX_HG1tRSVssrPKZt5qsf$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!AQPZuWEvMIOJGO0maPhP2k_SZi3x-
KlHgdIzgQJCLMFgRksOkuGLGb7QPMR8DZyP6sgfkKMyeE2ChHoUX_HG1tRSVssrPFzM5gSJ$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!AQPZuWEvMIOJGO0maPhP2k_SZi3x-
KlHgdIzgQJCLMFgRksOkuGLGb7QPMR8DZyP6sgfkKMyeE2ChHoUX_HG1tRSVssrPHkTHSIN$
or for phone support, call 866-208-3676.
Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 May 17, 2024 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Creek Penstocks Penstock Alignment Improvement Project – Response to FERC Comment ENCLOSURES CONTAIN CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company's (PG&E) response to address the Federal Energy Regulatory Commission’s (FERC) comment regarding the project to
improve penstock alignment at Bucks Creek , which is part of PG&E’s Bucks Creek
Hydroelectric Project, FERC No. 619. PG&E received FERC’s comment in a letter dated April 18 , 2024. PG&E's response to FERC’s comment is enclosed with this letter (Enclosure 1). Final
100% design drawings are provided in Enclosure 2. Revised d esign calculations for the
alignment project are provided in Enclosure 3. PG&E has reviewed the enclosed consultant work products and concurs with the information presented therein. Should you have technical questions concerning this matter, please contact Jeff Jukkola,
senior consulting engineer for PG&E, at (530) 624-8640. For general questions, please
contact Jamie Visinoni, senior license coordinator for PG&E, at (530) 215-6676. Sincerely, Kyle Ingvoldsen, P.E. Supervisor, Power Generation Project Engineering Enclosures: CUI//CEII – DO NOT RELEASE 1. Response to FERC Comment on Penstock Alignment Improvement Project 2. 100% Final Design Drawings - Bucks Creek Penstock Alignment Improvement ,
prepared by Gannet Flemming and dated February 2024 3. Revised Design Calculations – Bucks Creek Penstock Alignment Improvements, prepared by Gannett Fleming and dated May 2024 Document Accession #: 20240517-5111 Filed Date: 05/17/2024