Loading...
HomeMy WebLinkAbout05.23.25 Board Correspondence - FW_ General Correspondence issued in FERC P-619-000 -1From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nuzum, Danielle Subject:Board Correspondence - FW: General Correspondence issued in FERC P-619-000 Date:Friday, May 23, 2025 5:01:53 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Friday, May 23, 2025 10:17 AM Subject: General Correspondence issued in FERC P-619-000 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 5/23/2025, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: General Correspondence Description: Letter to Pacific Gas and Electric Company acknowledging the 04/22/2025 updated outage schedule for penstock dewatering at the Bucks Creek Hydroelectric Project under P-619. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20250523- 3068__;!!KNMwiTCp4spf!DZLsVWBTxPLs-ndr3Csqkk5xqL- _LO5juxwzzHC0ul9bL3_0OgDUoRFDB9_p8Pq2FYTPH0u2yyKcIOnwzXwp6rBHxg-tIQMgLPFd$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!DZLsVWBTxPLs- ndr3Csqkk5xqL-_LO5juxwzzHC0ul9bL3_0OgDUoRFDB9_p8Pq2FYTPH0u2yyKcIOnwzXwp6rBHxg-tIfyptHdl$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!DZLsVWBTxPLs- ndr3Csqkk5xqL-_LO5juxwzzHC0ul9bL3_0OgDUoRFDB9_p8Pq2FYTPH0u2yyKcIOnwzXwp6rBHxg- tIYRZt1qv$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections –San Francisco Regional Office 100 First Street, Suite 2300 San Francisco, CA 94105-3084 (415) 369-3300 May 23, 2025 In reply refer to: Project No.619-CA VIA FERC Service Mr. Russell Cruzen, P.E., Director Power Generation, Asset Excellence Pacific Gas and Electric Company 300 Lakeside Dr. Oakland, CA 94612-3534 Re:Updated Outage Schedule Dear Mr.Cruzen: This is in response to a letter dated April 22, 2025,from Mr.Matthew Joseph that submitted an updated outage schedule for penstock dewatering at the Bucks Creek Hydroelectric Project, FERC Project No. 619. We have reviewed the submittal, and we have no comments on the updated outage schedule. We appreciate your continued efforts in this aspect of our dam safety program. If you have any questions, contact Ms. Eunhye Kim at (415) 369-3321. Sincerely, Frank L. Blackett, P.E. Regional Engineer Document Accession #: 20250523-3068 Filed Date: 05/23/2025 Frank L Blackett, P.E.Digitally signed by Frank L Blackett, P.E. Date: 2025.05.23 09:13:39 -07'00' Document Content(s) P-619-000_88012_Outage_Dewatering_Bucks_U2.docx.pdf ......................1Document Accession #: 20250523-3068 Filed Date: 05/23/2025