HomeMy WebLinkAbout05.23.25 Board Correspondence - FW_ General Correspondence issued in FERC P-619-000From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter,
Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie
Cc:Nuzum, Danielle
Subject:Board Correspondence - FW: General Correspondence issued in FERC P-619-000
Date:Friday, May 23, 2025 5:01:41 PM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Friday, May 23, 2025 8:35 AM
Subject: General Correspondence issued in FERC P-619-000
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 5/23/2025, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document:
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: General Correspondence
Description: Letter to Pacific Gas and Electric Company acknowledging the 01/13/2025 Final Construction Report for the Milk Ranch Conduit Diversion No. 3
Pipeline Rebuild Project near the Three Lakes Dam, part of the Bucks Creek Hydroelectric Project under P-619.
To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20250523-
3044__;!!KNMwiTCp4spf!GDyCf1y18LgsQ1QpZphvVq_WElY6YyZadFesGxNyDVjn_6Rno9D--Ccv_3lrQNH5TIyBjuJ40rkc1rVpcEvUldahkHc8U0-E8rzu$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!GDyCf1y18LgsQ1QpZphvVq_WElY6YyZadFesGxNyDVjn_6Rno9D-
-Ccv_3lrQNH5TIyBjuJ40rkc1rVpcEvUldahkHc8UzXqdcwY$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!GDyCf1y18LgsQ1QpZphvVq_WElY6YyZadFesGxNyDVjn_6Rno9D--
Ccv_3lrQNH5TIyBjuJ40rkc1rVpcEvUldahkHc8U6Kh2se0$
or for phone support, call 866-208-3676.
Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov
FEDERAL ENERGY REGULATORY COMMISSION
Office of Energy Projects
Division of Dam Safety and Inspections –San Francisco Regional Office
100 First Street, Suite 2300
San Francisco, CA 94105-3084
(415) 369-3300
May 23, 2025
In reply refer to:
Project No. 619-CA
VIA FERC Service
Mr. Russell Cruzen, P.E., Director
Power Generation, Asset Excellence
Pacific Gas and Electric Company
300 Lakeside Dr.
Oakland, CA 94612-3534
Re:Final Construction Report for Milk Ranch Conduit Diversion No. 3 Pipeline
Rebuild Project
Dear Mr. Cruzen:
This is in response to a letter dated January 13, 2025,from Mr. Joseph Landucci,
that submitted a final construction report for the Milk Ranch Conduit Diversion No. 3
Pipeline Rebuild Project near Three Lakes Dam, which is part of the Bucks Creek
Hydroelectric Project, FERC No. 619.We have reviewed the submittal,and we have no
comments.
We appreciate your continued efforts in this aspect of our dam safety program.If
you have questions, contact Ms. Eunhye Kim at (415)369-3321.
Sincerely,
Frank L. Blackett, P.E.
Regional Engineer
Document Accession #: 20250523-3044 Filed Date: 05/23/2025
Frank L Blackett, P.E.Digitally signed by Frank L Blackett,
P.E.
Date: 2025.05.23 07:51:05 -07'00'
Document Content(s)
P-619-000_S67442,-3,-4_Milk Ranch Conduit Div 3_FCR.docx.pdf ..............1Document Accession #: 20250523-3044 Filed Date: 05/23/2025