Loading...
HomeMy WebLinkAbout05.13.25 Board Correspondence - FW_ General Correspondence issued in FERC P-2107-045From:Clerk of the Board To:BOS; Loeser, Kamie Cc:Nuzum, Danielle Subject:Board Correspondence - FW: General Correspondence issued in FERC P-2107-045 Date:Tuesday, May 13, 2025 4:41:36 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Tuesday, May 13, 2025 12:45 PM Subject: General Correspondence issued in FERC P-2107-045 .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 5/13/2025, the Federal Energy Regulatory Commission (FERC), Washington D.C., issued this document: Docket(s): P-2107-045 Lead Applicant: Pacific Gas and Electric Company Filing Type: General Correspondence Description: Letter to Pacific Gas and Electric Company discussing the 10/16/2024 Status Report and notification of change in schedule to complete recreation improvements at the Sandy Beach from Article 404 re the Poe Hydroelectric Project under P- 2107. To view the document for this Issuance, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20250513-3074__;!!KNMwiTCp4spf!A5G5Z4hXSweseskRa9R8QyumQ- hZ_7WvxOg6YhqvEqWm4CT0uRQamp26pcirYjdhVCLYMhSr-rAu6ODHJvc5gRey1w7RfHLfwnP6$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!A5G5Z4hXSweseskRa9R8QyumQ- hZ_7WvxOg6YhqvEqWm4CT0uRQamp26pcirYjdhVCLYMhSr-rAu6ODHJvc5gRey1w7RfCAzq2Vi$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!A5G5Z4hXSweseskRa9R8QyumQ- hZ_7WvxOg6YhqvEqWm4CT0uRQamp26pcirYjdhVCLYMhSr-rAu6ODHJvc5gRey1w7RfK7KoI6P$ or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov FEDERAL ENERGY REGULATORY COMMISSION Washington, D. C. 20426 OFFICE OF ENERGY PROJECTS Project No. 2107-045 — California Poe Hydroelectric Project Pacific Gas and Electric Company May 13, 2025 VIA Electronic Mail Janet Walther Pacific Gas and Electric Company Janet.Walther@pge.com Subject: Status Report and Notification of Change in Schedule for Sandy Beach recreation improvements – Article 404 Dear Ms. Walther: On October 16, 2024, you filed a status update report and notified the Commission regarding a change in the schedule to complete recreation improvements at the Sandy Beach recreation site at the Poe Hydroelectric Project No. 2107.1 The recreation improvements are a requirement of the approved Recreation Management Plan pursuant to Article 404 of the license,2 State Water Resources Control Board’s section 401 water quality certification condition 8, and U.S. Forest Service (Forest Service) condition 26. Ordering paragraph (D) of the 2022 Order requires you to file annual status reports providing an updated schedule for the Sandy Beach recreation improvements until the improvements are constructed and the documentation of completion report has been filed, due to the ongoing Highway 70 right-of-way coordination with the California Department of Transportation (Caltrans) and consultation requirements with the Forest Service. 1 Order Issuing New License (165 FERC ¶ 62,172), issued December 17, 2018. 2 Order Modifying and Approving Recreation Plan Under Article 404 (178 FERC ¶ 62,116), issued February 28, 2022 (2022 Order). Document Accession #: 20250513-3074 Filed Date: 05/13/2025 Project No. 2107-045 - 2 - Your letter states you submitted design drawings to the Forest Service at the 30%, 60%, 90%, and 100% design stages. Forest Service had no comment on the 30% and 60% design drawing; however, they provided comment on the 90% design drawings. You addressed these comments in the 100% submittal on October 4, 2023. You followed up with the Forest Service regarding the Sandy Beach recreation improvements on March 26, 2024, May 9, 2024, June 6, 2024, and October 10, 2024, however you have yet to receive concurrence from the Forest Service on the 100% design drawings. You indicate you will file the concurrence with the Commission once it is received. Your filing includes documentation of consultation with the Forest Service. You also indicate implementation and maintenance of road and parking improvements are dependent upon the results of consultation with Caltrans, and that discussions with Caltrans are ongoing. You will file the results of your consultation with Caltrans once it is complete. At this time, due to delays in receiving concurrence from the Forest Service and a feasibility determination from Caltrans, you have updated the construction schedule to September 1, 2025, through November 30, 2025. Please continue to keep the Commission informed regarding future changes to the construction schedule for the Sandy Beach recreation improvements. Once you have completed construction for all improvements, you are reminded you must file a report documenting completion of the improvements as required by ordering paragraph (C) of the2022 Order. Thank you for your cooperation. If you have any questions regarding this matter, please contact me at (678) 245-3027, or at mary.karwoski@ferc.gov. Sincerely, Mary Karwoski Land Resources Branch Division of Hydropower Administration and Compliance cc: VIA Electronic Mail Sky Ramirez-Doble Hydro License Coordinator Pacific Gas and Electric Company s9rv@pge.com Document Accession #: 20250513-3074 Filed Date: 05/13/2025 MARY KARWOSKI Digitally signed by MARY KARWOSKI Date: 2025.05.13 15:06:57 -04'00' Document Content(s) p-2107-045.pdf ............................................................1Document Accession #: 20250513-3074 Filed Date: 05/13/2025