Loading...
HomeMy WebLinkAbout05.14.25 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth Cc:Loeser, Kamie; Nuzum, Danielle Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Wednesday, May 14, 2025 4:46:04 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, May 14, 2025 6:00 AM Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 5/14/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Part 12 Consultant Safety Inspection Reports Description: Pacific Gas and Electric Company submits Part 12D Periodic Inspection Pre-Inspection Preparation Report re the Bucks Storage Dam of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20250514- 5022__;!!KNMwiTCp4spf!EkuRigpDq5KYwyhBWXC4jB4577pueosjkn0WXPOvHwsM-GgmFr-x7ORHG_oTGFIWVrIb4sUUV- uztX1SkZHBMsJgVJN9hruypCGf$ To modify your subscriptions, click here: https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!EkuRigpDq5KYwyhBWXC4jB4577pueosjkn0WXPOvHwsM- GgmFr-x7ORHG_oTGFIWVrIb4sUUV-uztX1SkZHBMsJgVJN9hk9mLnL_$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!EkuRigpDq5KYwyhBWXC4jB4577pueosjkn0WXPOvHwsM- GgmFr-x7ORHG_oTGFIWVrIb4sUUV-uztX1SkZHBMsJgVJN9hmt-1-_y$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 May 13, 2025 Via Electronic Submittal (E-File) Frank L. Blackett , P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street , Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Storage Dam, NATDAM No. CA00332 Part 12D Periodic Inspection Pre-Inspection P reparation Reports ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett : This letter presents the periodic inspection pre-inspection preparation reports (PI-PIPR) for the following dam , which is part of Pacific Gas and Electric Company’s (PG&E) Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619 . The PI-PIPR is prepared in accordance with Title 18 of the Code of Federal Regulations, Section 12.42. FERC approved Lelio Mejia as the independent consultant (IC) and the inspect ion plan for the dam in a letter to PG&E dated January 13, 2025. Dam Report No. Report Due Date Bucks Storage Dam 12th November 1, 2025 The PI-PIPR is enclosed with this letter for FERC review (Enclosure 1). The PI-PIPR includes no additions or changes to the IC team. Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762-9459 . For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Twelfth FERC Part 12D Safety Inspection , Periodic Inspection Pre-Inspection Preparation Report (2025), Bucks Storage Dam, prepared by Geosyntec Consultants and dated May 2025 Document Accession #: 20250514-5022 Filed Date: 05/14/2025 Document Content(s) PGE20250513_619_BucksStoragePI_P12_PIPR_Ltr.pdf ...........................1Document Accession #: 20250514-5022 Filed Date: 05/14/2025