HomeMy WebLinkAbout05.19.25 Board Correspondence - FW_ Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.;
Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth
Cc:Nuzum, Danielle; Loeser, Kamie
Subject:Board Correspondence - FW: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
Date:Monday, May 19, 2025 8:44:30 AM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Monday, May 19, 2025 7:57 AM
Subject: Part 12 Consultant Safety Inspection Reports submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 5/19/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Pacific Gas & Electric Company (as Agent)
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Part 12 Consultant Safety Inspection Reports
Description: Pacific Gas and Electric Company submits Part 12D Periodic Inspection, Pre-Inspection Preparation Reports re the Bucks Diversion Dam of the Bucks Creek Hydroelectric
Project under P-619.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20250519-
5017__;!!KNMwiTCp4spf!HFuDf738AWQsMzEkZkKvLY4IIrD31sPlmvm99Nl9Jhct_tMNCBlAnTBwY0na0Q2cWLr7-5qmZVXZznj1v94rzTQUOvsq1qEUmnsJ$
To modify your subscriptions, click here:
https://urldefense.com/v3/__https://ferconline.ferc.gov/eSubscription.aspx__;!!KNMwiTCp4spf!HFuDf738AWQsMzEkZkKvLY4IIrD31sPlmvm99Nl9Jhct_tMNCBlAnTBwY0na0Q2cWLr7-
5qmZVXZznj1v94rzTQUOvsq1hTXLCTw$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!HFuDf738AWQsMzEkZkKvLY4IIrD31sPlmvm99Nl9Jhct_tMNCBlAnTBwY0na0Q2cWLr7-
5qmZVXZznj1v94rzTQUOvsq1omdv9Kd$
or for phone support, call 866-208-3676.
Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604
May 16, 2025 Via Electronic Submittal (E-File) Frank L. Blackett , P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street , Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA
Bucks Diversion Dam, NATDAM No. CA00331 Part 12D Periodic Inspection Pre-Inspection P reparation Reports ENCLOSURE CONTAINS CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett : This letter presents the periodic inspection pre-inspection preparation reports (PI-PIPR) for the
following dam , which is part of Pacific Gas and Electric Company’s (PG&E) Bucks Creek
Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619 . The PI-PIPR is prepared in accordance with Title 18 of the Code of Federal Regulations, Section 12.42. FERC
approved Tom O’Brien and Keith Moen as co-independent consultants (IC) and the inspect ion plan for the following dam in a letter to PG&E dated February 11 , 2025 . Dam Report No. Report Due Date Bucks Diversion Dam 12th November 1, 2025 The PI-PIPR is enclosed with this letter for FERC review (Enclosure 1). The PI-PIPR includes no
additions or changes to the IC team. Should you have technical questions concerning this matter, please contact Ben Fontana, senior
dam safety engineer for PG&E, at (530) 762-9459 . For general questions, please contact Andrew
Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosure: CUI//CEII – DO NOT RELEASE 1. Twelfth FERC Part 12D Safety Inspection, Periodic Inspection Pre-Inspection
Preparation Report, Bucks Diversion Dam, prepared by HDR Engineering Inc. and dated May 12, 2025
Document Accession #: 20250519-5017 Filed Date: 05/19/2025
Document Content(s)
PGE20250516_619_BucksDiversionPI_P12_PIPR_Ltr.pdf .........................1Document Accession #: 20250519-5017 Filed Date: 05/19/2025