Loading...
HomeMy WebLinkAbout06.09.25 Board Correspondence - FW_ Procedural Motion submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Krater, Sharleen; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nuzum, Danielle Subject:Board Correspondence - FW: Procedural Motion submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. Date:Monday, June 9, 2025 4:45:39 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Monday, June 9, 2025 1:16 PM Subject: Procedural Motion submitted in FERC P-803-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 6/9/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company PG&E Corporation (as Agent) Docket(s): P-803-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Procedural Motion Description: Pacific Gas and Electric Company submits Request to be designated as a Non-Federal Representative for Consultation Section 7 of the Endangered Species Act re BW- 3 and BW-40 Temporary Flow Modification re the DeSabla-Centerville Project under P-803. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist? accession_num=20250609-5170__;!!KNMwiTCp4spf!AQOzgGPuDaMP52rtelxMMRBWS1fXbKxj4t- CQw1u2t9RqTHGVFQ7YoafYnWiC4fN8yMdx1v1u9gqIk3RuOuIFS_5ClRghkm2H76o$ To modify your subscriptions, click here: CQw1u2t9RqTHGVFQ7YoafYnWiC4fN8yMdx1v1u9gqIk3RuOuIFS_5ClRghoaMihnb$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!AQOzgGPuDaMP52rtelxMMRBWS1fXbKxj4t- CQw1u2t9RqTHGVFQ7YoafYnWiC4fN8yMdx1v1u9gqIk3RuOuIFS_5ClRghgdcpECm$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 June 9, 2025 Via Electronic Submittal (E-File) Debbie-Anne Reese, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 RE: DeSabla-Centerville Hydroelectric Project, FERC No. 803-CA BW- 3 and BW-40 Temporary Flow Modification: Delegation of Authority Regarding Section 7 Dear Secretary Reese: On June 6, 2025, Federal Energy Regulatory Commission (FERC) issued a letter to Pacific Gas and Electric Company (PG&E), regarding Section 7 consultation for a temporary flow modification request for the DeSabla-Centerville Hydroelectric Project, FERC No. 803 (P803). This letter respectfully requests that FERC designate PG&E as its non-federal representative to conduct informal consultation with the United States Fish and Wildlife Service on the potential effects to foothill yellow-legged frogs (Rana boylii), and conferencing on the northwestern pond turtle (Actinemys marmorata); when implementing a temporary flow modification at compliance points BW-3 and BW-40, which are part of the P803. The temporary flow modification is being requested to support the 2025 Central Valley Spring Run Chinook Salmon holding population in Butte Creek. Pursuant to 50 CFR section 402.08, PG&E requests FERC designate PG&E as its non -federal representative for informal consultation under the Section 7 of the Endangered Species Act. For general questions, please contact Sky Ramirez-Doble, license coordinator for PG&E, at (530) 250-7002. Sincerely, Megan Young License Project Manager cc: via email Stephanie Millsap (USFWS) - Stephanie_Millsap@fws.gov Brittany Reaves (USFWS)- Brittany_reaves@fws.gov Document Accession #: 20250609-5170 Filed Date: 06/09/2025 Document Content(s) PGE20250609_803_Section7_NFR_BW_40_TFM.pdf................................1 Document Accession #: 20250609-5170 Filed Date: 06/09/2025