Loading...
HomeMy WebLinkAbout05.28.25 Board Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens, Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie Cc:Nuzum, Danielle Subject:Board Correspondence - FW: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. Date:Wednesday, May 28, 2025 4:34:13 PM Please see Board Correspondence - -----Original Message----- From: 'FERC eSubscription' <eSubscription@ferc.gov> Sent: Wednesday, May 28, 2025 8:56 AM Subject: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al. .ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying.. On 5/28/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.: Filer: Pacific Gas and Electric Company Pacific Gas & Electric Company (as Agent) Docket(s): P-619-000 Lead Applicant: Pacific Gas and Electric Company Filing Type: Project Operations Compliance Report Description: Pacific Gas and Electric Company submits construction package and request for authorization to proceed with the spillway repairs at the Bucks Storage Dam of the Bucks Creek Hydroelectric Project under P-619. To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20250528- 5082__;!!KNMwiTCp4spf!H6V7Su1QZPoJr0wsiKpValCCxwNc2dVZvRdsOUlQuMEgrTeT7lZLrWsnP3lC2lR-sWEITc2GLN3AEA-HCQLf6nCfJTHpJ8Xh0Oui$ To modify your subscriptions, click here: sWEITc2GLN3AEA-HCQLf6nCfJTHpJ3ZTGmeS$ ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!H6V7Su1QZPoJr0wsiKpValCCxwNc2dVZvRdsOUlQuMEgrTeT7lZLrWsnP3lC2lR- sWEITc2GLN3AEA-HCQLf6nCfJTHpJ1qDKA8F$ or for phone support, call 866-208-3676. Power Generation 300 Lakeside Drive Oakland, CA 94612 Mailing Address: P.O. Box 28209 Oakland, CA 94604 May 28, 2025 Via Electronic Submittal (E-File) Frank L. Blackett, P.E., Regional Engineer Federal Energy Regulatory Commission Division of Dam Safety and Inspections 100 First Street, Suite 2300 San Francisco, CA 94105-3084 RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA Bucks Storage Dam, NATDAM No. CA00332 Authorization Request for Spillway Repairs ENCLOSURES CONTAIN CUI//CEII – DO NOT RELEASE Dear Frank L. Blackett: This letter presents Pacific Gas and Electric Company's (PG&E) submittal package for a spillway repair project at Bucks Storage Dam, which is a part of the Bucks Creek Hydroelectric Project, Federal Energy Regulatory Commission (FERC) No. 619. The proposed work plan for the repair project is enclosed with this letter (Enclosure 1) along with the quality control inspection program (QCIP) (Enclosure 2). PG&E’s plans to release the repair project to construction on June 30, 2025, to support construction mobilization on August 1, 2025. PG&E plans to provide a final construction report within 90 days of completing construction, otherwise PG&E will provide an update on the project status and a plan and schedule for further action by February 28, 2026. PG&E respectfully requests FERC authorization to proceed with the spillway repairs. Should you have technical questions concerning this matter, please contact Ben Fontana, senior dam safety engineer for PG&E, at (530) 762-9459. For general questions, please contact Andrew Garcia, license coordinator for PG&E, at (530) 228-8990. Sincerely, Robert O. Ellis, P.E., G.E. Deputy Chief Dam Safety Engineer Enclosures: CUI//CEII – DO NOT RELEASE 1. Bucks Storage Dam Spillway Repair Work Plan, Revision 2, prepared by PG&E and dated May 2025 2. Bucks Storage Dam 2025 Spillway Repair Quality Control Inspection Program, Revision 1, prepared by PG&E and dated March 2025 Document Accession #: 20250528-5082 Filed Date: 05/28/2025 Document Content(s) PGE20250528_619_BucksStorage_IRRMRepairPckg_WorkPlan_Ltr.pdf..............1 Document Accession #: 20250528-5082 Filed Date: 05/28/2025