HomeMy WebLinkAbout05.28.25 Board Correspondence - FW_ Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.From:Clerk of the Board
To:Clerk of the Board; Connelly, Bill; Cook, Holly; Cook, Robin; Durfee, Peter; Jessee, Meegan; Kimmelshue, Tod; Kitts, Melissa; Lee, Lewis; Little, Melissa; Pickett, Andy; Ritter, Tami; Stephens,
Brad J.; Sweeney, Kathleen; Teeter, Doug; Zepeda, Elizabeth; Loeser, Kamie
Cc:Nuzum, Danielle
Subject:Board Correspondence - FW: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
Date:Wednesday, May 28, 2025 4:34:13 PM
Please see Board Correspondence -
-----Original Message-----
From: 'FERC eSubscription' <eSubscription@ferc.gov>
Sent: Wednesday, May 28, 2025 8:56 AM
Subject: Project Operations Compliance Report submitted in FERC P-619-000 by Pacific Gas and Electric Company,et al.
.ATTENTION: This message originated from outside Butte County. Please exercise judgment before opening attachments, clicking on links, or replying..
On 5/28/2025, the following Filing was submitted to the Federal Energy Regulatory Commission (FERC), Washington D.C.:
Filer: Pacific Gas and Electric Company
Pacific Gas & Electric Company (as Agent)
Docket(s): P-619-000
Lead Applicant: Pacific Gas and Electric Company
Filing Type: Project Operations Compliance Report
Description: Pacific Gas and Electric Company submits construction package and request for authorization to proceed with the spillway repairs at the Bucks Storage Dam of the
Bucks Creek Hydroelectric Project under P-619.
To view the document for this Filing, click here https://urldefense.com/v3/__https://elibrary.ferc.gov/eLibrary/filelist?accession_num=20250528-
5082__;!!KNMwiTCp4spf!H6V7Su1QZPoJr0wsiKpValCCxwNc2dVZvRdsOUlQuMEgrTeT7lZLrWsnP3lC2lR-sWEITc2GLN3AEA-HCQLf6nCfJTHpJ8Xh0Oui$
To modify your subscriptions, click here:
sWEITc2GLN3AEA-HCQLf6nCfJTHpJ3ZTGmeS$
------------------------------------------------------------------------
Please do not respond to this email.
Online help is available here:
https://urldefense.com/v3/__http://www.ferc.gov/efiling-help.asp__;!!KNMwiTCp4spf!H6V7Su1QZPoJr0wsiKpValCCxwNc2dVZvRdsOUlQuMEgrTeT7lZLrWsnP3lC2lR-
sWEITc2GLN3AEA-HCQLf6nCfJTHpJ1qDKA8F$
or for phone support, call 866-208-3676.
Power Generation
300 Lakeside Drive
Oakland, CA 94612
Mailing Address:
P.O. Box 28209
Oakland, CA 94604
May 28, 2025
Via Electronic Submittal (E-File)
Frank L. Blackett, P.E., Regional Engineer
Federal Energy Regulatory Commission
Division of Dam Safety and Inspections
100 First Street, Suite 2300
San Francisco, CA 94105-3084
RE: Bucks Creek Hydroelectric Project, FERC No. 619-CA
Bucks Storage Dam, NATDAM No. CA00332
Authorization Request for Spillway Repairs
ENCLOSURES CONTAIN CUI//CEII ā DO NOT RELEASE
Dear Frank L. Blackett:
This letter presents Pacific Gas and Electric Company's (PG&E) submittal package for a spillway
repair project at Bucks Storage Dam, which is a part of the Bucks Creek Hydroelectric Project,
Federal Energy Regulatory Commission (FERC) No. 619.
The proposed work plan for the repair project is enclosed with this letter (Enclosure 1) along with
the quality control inspection program (QCIP) (Enclosure 2).
PG&Eās plans to release the repair project to construction on June 30, 2025, to support
construction mobilization on August 1, 2025. PG&E plans to provide a final construction report
within 90 days of completing construction, otherwise PG&E will provide an update on the project
status and a plan and schedule for further action by February 28, 2026.
PG&E respectfully requests FERC authorization to proceed with the spillway repairs. Should you
have technical questions concerning this matter, please contact Ben Fontana, senior dam safety
engineer for PG&E, at (530) 762-9459. For general questions, please contact Andrew Garcia,
license coordinator for PG&E, at (530) 228-8990.
Sincerely,
Robert O. Ellis, P.E., G.E.
Deputy Chief Dam Safety Engineer
Enclosures: CUI//CEII ā DO NOT RELEASE
1. Bucks Storage Dam Spillway Repair Work Plan, Revision 2, prepared by PG&E and dated May
2025
2. Bucks Storage Dam 2025 Spillway Repair Quality Control Inspection Program, Revision 1,
prepared by PG&E and dated March 2025
Document Accession #: 20250528-5082 Filed Date: 05/28/2025
Document Content(s)
PGE20250528_619_BucksStorage_IRRMRepairPckg_WorkPlan_Ltr.pdf..............1